background image

8

Withdrawal of gaseous chlorine

In case of higher chlorine requirement several chlorine containers 
of the same temperature have to be connected with header lines.

Withdrawal of liquid chlorine

Within chlorination plants only possible from chlorine drums.

Application of an evaporator is necessary.

Withdrawal of gaseous chlorine: Observe residual pressure of 
ca. 2 bar.

Withdrawal of liquid chlorine: Observe residual pressure of 
ca. 4 bar.

After the extraction

Close container valve.

Disconnect container from the plant.

Screw on valve protection nuts.

Screw on protection cap.

2.3 Checking the tightness

Before commissioning check the tightness of the 

whole plant

.

2.3.1 Checking the chlorine solution lines and the diaphragm 

non-return of the injector

Observe the manual of the injector!

2.3.2 Checking the tightness of the vacuum lines

Vacuum lines are all lines between vacuum regulator and injector.

Close all container valves

Close the rate valve

Open the shut-off valve at the injection unit

Open motive water valve

Switch on the booster pump

Open the rate valve

– Floater shows gas flow or vacuummeter shows more than - 

9 m w. c.: 

Leakage in vacuum line!

Close  rate  valve

Switch off booster pump

Close motive water valve

Close the shut-off valve at the injection unit

Check the vacuum lines and the connection. If necessary, 
carefully re-tighten them.

Check tightness again!

– Floater shows no gas flow, vacuummeter shows -9 m w. c. 

or less: 

Vacuum lines are tight

.

2.3.3 Checking the tightness of pressure gas lines

Pressure gas lines are all lines from the gas containers to the 
vacuum regulator.

If the plant is equipped with a nitrogen rinsing device: Check 
tightness roughly with nitrogen

Detailed checking with ammonia

Checking the tightness with nitrogen

Close all container valves

Open container connection valves and all shut-off valves up 
to the gas dosing system

Open the connection valve of the nitrogen cylinder

Slowly open the valve of the nitrogen cylinder, until the lines 
have a pressure of about 10 bar (read at the manometer of 
the vacuum regulator).

Apply soap water to all components under pressure

– Formation of bubbles and/or pressure drop at manometer

Leakage in pressure lines!

– Depressurize the plant!

– Eliminate leakage!

– Check tightness again!

No formation of bubbles, pressure at manometer does not drop 
significantly within one hour: 

Pressure lines are tight.

Checking the tightness with ammonia

See chapter 

5.2.2 Checking the tightness

.

Caution

At 15 °C about 1 % (DIN19607) of the content can 
be withrawn per hour. In case of higher 
withdrawal danger of malfunction by the 
formation of ice on containers and piping!

Container size

Withdrawal quantity

50 Kg

500 g/h

65 Kg

650 g/h

500 Kg

5 Kg/h

1000 Kg

10 Kg/h

Caution

Do not completely evacuate the chlorine drums. 
Danger of withdrawing deposits!

Caution

Immediately close connection lines. 
No moisture must get into the lines!

Warning

Do not check the tightness until the whole plant 
is ready for start-up. 
Danger of chlorine break-out!

Note

More possible reasons for insufficient operating 
vacuum

injector layed out too weakly or defective

injector obstructed

booster pump layed out too weakly or 
defective

Warning

Maximum nitrogen pressure 16 bar! 
Danger of damages and gas leakage when being 
exceeded!

Содержание Alldos Vaccuperm VGB-103

Страница 1: ...Vaccuperm VGB 103 Compact dosing regulator GRUNDFOS ALLDOS INSTRUCTIONS Installation and operating instructions ...

Страница 2: ...uirements of the EC member states Electrical equipment designed for use within certain voltage limits 73 23 EEC Standards which have been used EN 60204 1 2006 EN 60519 1 2003 EN 60519 2 2006 Electromagnetic compatibility 89 336 EEC Standards which have been used EN 61000 6 1 2007 EN 61000 6 3 2007 EN 55014 1 2006 EN 55014 2 1997 A1 2001 Other bodies of rules applied DIN 19606 2006 IEC 64 SEC 725 1...

Страница 3: ......

Страница 4: ...em is running 17 6 6 Changing the Gas Cylinder 18 6 7 Possible faults 19 7 Maintenance 19 1 Of general interest 1 1 Structure of the documentation The Grundfos Alldos device VGB 103 is a state of the art solution which complies with recognised safety regulations Conformity with applicable standards directives and laws has been verified Nevertheless certain risks which cannot be prevented by the ma...

Страница 5: ...cordance with the intended use and are not permitted The manufacturer Grundfos Alldos accepts no liability for any damage resulting from incorrect use The system comprises state of the art components and has undergone safety related testing 2 Handling chlorine 2 1 Physical and chemical data Under normal conditions of pressure and temperature chlorine is a yellowish green gas with a pungent odour I...

Страница 6: ...ed persons from the dangerous area Helpers must pay attention to personal protection Immediately remove contaminated clothes Calm down injured persons and keep them warm with blankets Supply fresh air use oxygen respirator alternately with inhalating steam if possible No mouth to mouth resuscitation Fast and gentle transport to hospital lying sitting in case of difficulty in breathing state chlori...

Страница 7: ...autions and the manuals of the manufacturer 2 2 7 Chlorine extraction Before the extraction The chlorine containers must be stored at least for 8 hours in the container room so that the content can adapt the ambient temperature Turn chlorine drums on the support until the dip pipe and the riser pipe are placed vertically observe the markings on the drum Check tightness Connection Protect container...

Страница 8: ... all lines from the gas containers to the vacuum regulator If the plant is equipped with a nitrogen rinsing device Check tightness roughly with nitrogen Detailed checking with ammonia Checking the tightness with nitrogen Close all container valves Open container connection valves and all shut off valves up to the gas dosing system Open the connection valve of the nitrogen cylinder Slowly open the ...

Страница 9: ...alsdfkljkj sdk asdajlk llasdf lalsdkfl lasdlfkl lasdflkjasdlkfjlj jlakjlkjdl alsdfkljkj asdlkfjlk lalsdk asdajlk llasdf lalsdkfl lasdlfkl lasdflkjasdlkfjlj jlakjlkjdl alsdfkljkj asdajlk llasdf lalsdkfl lasdlfkl lasdflkjasdlkfjlj jlakjlkjdl alsdfkljkj asdlkfjlk lalsdk asdajlk llasdf lalsdkfl lasdlfkl lasdflkjasdlkfjlj jlakjlkjdl alsdfkljkj asdajlk llasdf lalsdkfl lasdlfkl lasdflkjasdlkfjlj jlakjlkj...

Страница 10: ...ressure regulator Option VGA 117 Regulates the difference of the pressures before and after the rate valve to a constant value Adjusted dosing flow stays constant even when the injector vacuum varies 2 5 5 Vacuummeter Option VGA 117 Displays the injector vacuum 2 5 6 Injector Creates the vacuum necessary for operating the pant Mixes the chlorine gas with the water TM04 0705 0908 Motive water Vacuu...

Страница 11: ...up Wearers of respiratory equipment for work and rescue G 26 GUV 2 6 Unfallverhütungsvorschrift Druckbehälter Regulations for accident prevention Pressure containers GUV 2 10 Unfallverhütungsvorschrift Elektrische Anlagen und Betriebsmittel Regulations for accident prevention Electrical installations and resources GUV 9 9 Unfallverhütungsvorschrift Gase Regulations for accident prevention Gases ZH...

Страница 12: ... human use DIN 19643 Aufbereitung von Schwimm und Badewasser Treatment of swimming pool and bathing water DIN 3179 Teil 1 2 Einteilung der Atemgeräte Übersicht Division of the respiratory equipment overview DIN 4102 Teil 2 Brandverhalten von Baustoffen und Bauteilen Behaviour in fire of building materials and parts DIN 477 Teil 1 Gasflaschenventile Bauformen Baumaße Anschlüsse Gewinde Gas cylinder...

Страница 13: ...bottle connection left drum connection on top Filter O Outside U Inside Direct installation B Bottle pressure input frontal D Drum pressure input left Residual pressure device 1 Yes 0 No Accuracy 4 of upper limit Control range 1 20 Empty indication Optical empty indication Flow meter According to the floater principle length of the measuring tube 70 mm Weight 1 kg 5 100 g h 0 2 5 lbs day 10 250 g ...

Страница 14: ...Dimensioned drawing of chlorine compact device TM04 0706 0908 VGB 103 131 7 82 4 92 31 4 ca 197 101 71 1 14 40 3 126 146 63 bar 16 0 Cl 20 C ALLDOS 2 0 187 8 81 8 125 ca 100 31 4 ca 257 with closed yoke G1 or G3 4 with pressure gauge G1 ...

Страница 15: ... 4 5 Checking the tightness after changing the cylinder See chapter 5 2 2 Checking the tightness 5 Commissioning 5 1 Preparations for commissioning 5 1 1 Vacuum connections Fig 15 Vacuum connections TM04 0707 0908 Item Description 1 Gas cylinder 2 Compact Dosing vaccuperm VGB 103 3 Adsorption device 4 Injector 5 Gas warning device 6 Gas sensor 1 2 3 4 5 6 10cm Warning Observe the information see c...

Страница 16: ...essure connection Slightly press the bottle in a pumping manner allowing the ammonia mist to rise up Formation of white mist The inlet valve is not tight Depressurize the plant Check the inlet valve and repair it Check tightness again Formation of white mist the inlet valve is not tight Fig 19 Ammonia chlorine gas formation of white mist No formation of white mist the inlet valve is tight Fig 20 N...

Страница 17: ...Immediately close the cylinder valve Let the system run until all parts are evacuated Switch off the system as described in the following 6 5 2 Switching off while the system is running Close the cylinder valve Let the system run until the measuring tube shows no more gas flow Close the rate valve Switch off the motive water of the injector Close the motive water valves Close the shut off valve at...

Страница 18: ...the empty cylinder move it away and protect it against falling down Place the new gas cylinder and fix it correctly Remove the protective cap from the new gas cylinder All connections must be absolutely clean and dry Insert the gasket at the pressure connection of the device Replace the filter if necessary Screw the device onto the connection of the cylinder Check the tightness Re start the system...

Страница 19: ...rs is higher than 1 of the contents of the gas cylinder the system is too small Use a dosing system with more than one gas cylinders Desired dosing flow is not reached Insufficient injector vacuum Check the injector repair it if necessary Observe the manual of the injector Check the motive water pump repair it if necessary Check the dirt trap before the injector clean it if necessary Leakage in va...

Страница 20: ...20 ...

Страница 21: ...21 ...

Страница 22: ...22 ...

Страница 23: ...o 141 0022 Japan Phone 81 35 448 1391 Telefax 81 35 448 9619 Korea GRUNDFOS Pumps Korea Ltd 6th Floor Aju Building 679 5 Yeoksam dong Kangnam ku 135 916 Seoul Korea Phone 82 2 5317 600 Telefax 82 2 5633 725 Latvia SIA GRUNDFOS Pumps Latvia Deglava biznesa centrs Augusta Deglava ielā 60 LV 1035 Rīga Tālr 371 714 9640 7 149 641 Fakss 371 914 9646 Lithuania GRUNDFOS Pumps UAB Smolensko g 6 LT 03201 V...

Страница 24: ...dfosalldos com Being responsible is our foundation Thinking ahead makes it possible Innovation is the essence 15 710217 V1 0 Repl 15 710091 V1 0 15 710001 V1 0 GB 95713929 0209 Repl 96681349 1104 96681297 1004 ...

Отзывы: