background image

 

Start-up 

 

22 | 40 

 

B

A

_

T

D3

-A

F

0

0

0

e

n

_

0

0

4

_

F

M

E

.d

o

cx

 

5.2 

Handing over the product to the owner/user 

►  Explain to the owner/user how the product works. 

►  Use the manual to brief the owner/user and answer any questions. 

►  Inform the owner/user about the need for inspections and maintenance. 

►  Hand over all documents to the owner/user for keeping. 

►  Enter the initial start-up in the operation log (refer to chapter 10.1). 

Содержание GENO-fine FME 100

Страница 1: ...We understand water Filters GENO fine filters FME FME WW FME KW Operation manual...

Страница 2: ...written consent of Gr nbeck Wasseraufbereitung GmbH no part of this manual may be reproduced in any way nor may any part be processed duplicated or distributed using electronic systems Non compliance...

Страница 3: ...duct description 10 3 1 Intended use 10 3 2 Foreseeable misuse 10 3 3 Product components 11 3 4 Functional description 12 3 5 Accessories 12 4 Installation 13 4 2 Requirements regarding the installati...

Страница 4: ...ymbols used This symbol identifies instructions that you must comply with for your own personal safety as well as to avoid damage to property This symbol identifies instructions that you must comply w...

Страница 5: ...onological sequence of actions is important 1 First action a first step b second step 2 Second action Result following an instruction Result Lists Listed item Listed sub item Menu paths Status level M...

Страница 6: ...ies or orders Enter the necessary information in the table below to have it readily available whenever necessary Item Designation Item Designation 1 EAC mark 2 Product designation 3 Nominal connection...

Страница 7: ...h the hygiene instructions in chapter 6 Failure to comply can result in microbiological contamination of your drinking water installation Keep your product permanently connected to the water supply Sa...

Страница 8: ...property may occur 2 3 Regulations When installing and starting up the system amongst others comply with the following regulations and guidelines Statutory regulations on environmental protection Prov...

Страница 9: ...y designated for a specialist installer Only use this product as intended Make sure that the required inspection and maintenance work is carried out Keep this manual 2 6 Product specific safety instru...

Страница 10: ...ve pressure applications The filters are designed according to the stipulations of DIN EN 13443 1 and DIN 19628 and are intended for installation into drinking water pipes according to DIN EN 806 2 Th...

Страница 11: ...mp gasket 5 Filter housing 6 Plugs 7 Flange 8 Mini ball valve with handle 9 Hose fitting 10 Draining valve angled FME 100 11 90 angle 12 Double nipple 13 Retaining plate 14 Support mesh 15 Filter elem...

Страница 12: ...ate of the filter is exceeded the filter elements must be replaced The locking system of the cover ensures the trouble free and quick replacement of the filter elements without any tools 3 5 Accessori...

Страница 13: ...ialist installer Installation in the drinking water system In accordance with DIN EN 806 2 and DIN EN 1717 the product is installed in the water pipe downstream of the water meter and upstream of dist...

Страница 14: ...ial flow Parallel piping Parallel piping of two GENO fine filters for the filtration of process boiler feed cooling and air conditioning water in order to ensure an uninterrupted operation even during...

Страница 15: ...must be frost proof and ensure the filter s protection from chemicals dyes solvents vapours and direct sunlight The installation room must provide an adequately dimensioned floor drain If no floor dr...

Страница 16: ...Designation 1 GENO fine filter with flange connection according to DIN EN 1092 1 2 Pressure gauge 3 Operation manual 4 Draining valve angled FME 100 5 Draining valve straight FME 50 65 80 6 Plugs 7 Fi...

Страница 17: ...direction of flow NOTE Seal loose parts during assembly Leakage at the filter Seal the components of the draining valve pressure gauges and deaerator on site with e g hemp Teflon tape Install the GENO...

Страница 18: ...nstall the mini ball valve at the filter connection 3 Install the handle at the mini ball valve 4 4 2 Installing the angled draining valve FME 100 1 Screw the 90 angle to the filter connection 2 Screw...

Страница 19: ...4 4 3 Installing the vent valve 1 Tightly screw the deaerator to the top of the cover 4 4 4 Installing the pressure gauges plugs 1 Tightly screw the pressure gauge to the front of the housing 2 Tight...

Страница 20: ...cording to DIN EN 1092 1 the distance between the two gaskets must be 360 mm for filters FME 50 80 m and 484 mm for filter FME 100 2 Check the flow direction given on site 3 By way of the screw connec...

Страница 21: ...drain the filter a hose needs to be installed at the draining valve on site hose fitting 11 mm Make sure that the draining valve is closed 1 Open the deaerator 2 Slowly open shut off valve 1 inlet 3 C...

Страница 22: ...to the owner user how the product works Use the manual to brief the owner user and answer any questions Inform the owner user about the need for inspections and maintenance Hand over all documents to...

Страница 23: ...EN 806 5 standard Regular maintenance ensures trouble free and hygienic operation By concluding a maintenance contract you ensure that all maintenance work is carried out on time Only use genuine spa...

Страница 24: ...e upper pressure gauge outlet pressure lower pressure gauge differential pressure max 0 8 bar 5 Replace the filter elements if the differential pressure is 0 8 bar 6 If the differential pressure of th...

Страница 25: ...maintenance Preparations for the replacement of the filter elements 1 Direct the waste water line towards the sewer 2 Close shut off valves 1 inlet and 2 outlet 3 Open the deaerator 4 Open the handle...

Страница 26: ...n maintenance 26 40 BA_TD3 AF000en_004_FME docx 5 Loosen the wing nuts 6 Open the bracket 7 Remove the cover 8 Flush the sunk dirt particles from the filter housing via the draining valve The filter i...

Страница 27: ...ed filter element in accordance with local regulations For hygienic reasons the new filter element must not be touched with bare hands 4 Slide the new filter element in its foil packaging over the sup...

Страница 28: ...ance 28 40 BA_TD3 AF000en_004_FME docx 9 Put on the filter cover 10 Install the bracket 11 Tighten the wing nuts evenly The cover is fully tightened 12 Put the filter into operation refer to chapter 5...

Страница 29: ...alist knowledge This kind of maintenance work may only be carried out by Gr nbeck s technical service authorised service company or by specialist installers trained by Gr nbeck In addition to the semi...

Страница 30: ...ber of filter elements subject to size of filter 6 6 Spare parts For spare parts and consumables please contact your local Gr nbeck representation which you may find on the internet at www gruenbeck c...

Страница 31: ...off valves are not open completely Completely open the shut off valves Water escapes at the screw connections of the filter housing The screw connections are leaky Have the screw connections at the fi...

Страница 32: ...that this product and the electrical and electronic components must not be disposed of as household waste Find out about the local regulations on the separate collection of electrical and electronic p...

Страница 33: ...ction mm 175 205 F Clearance required for replacement of filter element mm 400 Filter elements quantity piece s 2 3 5 Operating weight approx kg 45 46 47 70 Empty weight kg 22 23 23 5 32 5 General dat...

Страница 34: ...Technical specifications 34 40 BA_TD3 AF000en_004_FME docx 9 1 Pressure loss curves Item Designation Item Designation 1 Pressure difference bar 2 Flow m h...

Страница 35: ..._____________________ 10 1 Start up log Customer Name Address Installation Accessories Floor drain available yes no Safety device yes no Operating values Water pressure at raw water inlet bar Water pr...

Страница 36: ...Operation log 36 40 BA_TD3 AF000en_004_FME docx 10 2 Maintenance Date Work performed Signature...

Страница 37: ...Operation log 37 40 BA_TD3 AF000en_004_FME docx Date Work performed Signature...

Страница 38: ...placement of the filter elements 27 I Inspection 24 Installation of the filter in the pipe 20 Installing the product 16 M Maintenance 24 P Pressure loss curves 34 S Scope of supply 16 Spare parts 30 S...

Страница 39: ......

Страница 40: ...Gr nbeck Wasseraufbereitung GmbH Josef Gr nbeck Str 1 89420 Hoechstaedt Germany For more information go to www gruenbeck com 49 9074 41 0 49 9074 41 100 info gruenbeck com www gruenbeck com...

Отзывы: