FINISH ROUGH EDGES

Gather the parts:
•  Duct tape (supplied by customer)
•  Metal file
1.  Check for any sharp edges on the frame and file them 

smooth so they will not cut the cover.

2.  Apply two layers of heavy duct tape on all pipe  

connections and clamps that may contact the cover.

ANCHOR THE ASSEMBLED FRAME

At this point, anchor the high tunnel frame. Consult the 

MUST READ document for anchoring information and 

suggestions. Please call customer service at 1-800-245-

9881 for additional anchoring information.

CAUTION

: The anchor assembly is an integral part of

the high tunnel construction. Improper anchoring may 

cause instability and failure of the structure to perform 

as designed. Failing to anchor the shelter properly 

will void the manufacturer’s warranty and may cause 

serious injury and damage.

BASEBOARD INSTALLATION (RECOMMENDED)

Gather the parts:
•  Treated or recycled plastic lumber (supplied by 

customer). 

Recommended: 2" x 6".

•  1/4" x 4" carriage bolts and nuts (may not work for 

baseboards with a thickness greater than 1-1/2") 

 

 

NOTE:

 The following procedure describes one way 

to install the recommended baseboards. The size 

and type of the baseboard you choose may require 

the use of alternative steps. When properly installed, 

baseboards run the length of the frame.  

 

On the outside of the frame, attach the first baseboard 

to the ground posts using the 1/4" x 4" carriage bolts 

(FAH009B) and nuts (FALB01B). Continue adding 

baseboards to complete the first run. Splices are 

made between posts as shown. Use a short section of 

baseboard to secure separate baseboards at a splice.  

 

Ground 

Level

Inside of 

Shelter

Outside of 

Shelter

NOTE:

 The boards should be at ground level or slightly 

into grade to prevent the shelter from sinking and to 

create a seal along the bottom. After installing the 

baseboards, continue with these instructions.

This baseboard is 

not included

 with the shipment and must 

be supplied by the customer. Treated or recycled plastic 

lumber works well for a baseboard.

Recommended dimension: 2" x 6".

Содержание PB01670R6

Страница 1: ...24 L PB01675R6 20 W x 12 H x 36 L PB01685R6 20 W x 12 H x 72 L 2021 GrowSpan All Rights Reserved Reproduction is prohibited without permission GrowSpan Round Economy High Tunnels Ground Level Diagram...

Страница 2: ...manufacturer s warranty and may cause serious injury and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and pre...

Страница 3: ...in cover if equipped This applies to fabric covers that stretch over the frame assembly Your shelter may include roof panels or side panels or both 11 Read the Care and Maintenance information at the...

Страница 4: ...ed for buildings with roll up sides Materials for baseboards and ribbon boards are not included and are supplied by customer ATTENTION Fasteners to secure boards to building frame are included Recomme...

Страница 5: ...548 Cross Connector Swaged Plain Swaged and Plain Rafter Sections 102198 U Channel Spring 102197 Poly Latch U Channel 102675 Ground Post Plain End Panel FRAME ASSEMBLY NOTE During the assembly of the...

Страница 6: ...amps cross connectors and purlins Actual frame may differ from frame shown OVERVIEW This section is an overview of the process for assembling your high tunnel For details please see section Assembling...

Страница 7: ...re driving the remaining posts to the required height 8 After all corner posts are accurately installed tie a string line between the tops of the corner ground posts on the same side of the shelter Th...

Страница 8: ...gs to be aligned with those in ground post Install the screws so they will not touch the cover once it is installed This is typically on the backside of the rafter which will be the surface visible fr...

Страница 9: ...afters and purlin pipe until the frame is assembled Secure all purlin splices using Tek screws See Step 10 NOTE Each purlin assembly consists of 1 315 x 75 131S075 swaged pipes number is determined by...

Страница 10: ...ed plastic lumber supplied by customer Recommended 2 x 6 1 4 x 4 carriage bolts and nuts may not work for baseboards with a thickness greater than 1 1 2 NOTE The following procedure describes one way...

Страница 11: ...ied wood screws to secure U channel to ribbon board Do not use Tek screws to attach U Channel to wood NO RIBBON BOARD Attach one section of the poly latch U Channel to the side of the frame using Tek...

Страница 12: ...crews to attach the U Channel to the top of one end rafter Space screws at 24 ATTENTION The poly latch U Channel will bend with the curve of the rafter as it is attached The U Channel runs from the po...

Страница 13: ...sembled frame 1 Locate four 4 pieces of 102197 single u channel additional 102198A spring wire and the 108654 roll of 6 mil film 2 At one corner cut and attach the 102197 u channel to the end rafter a...

Страница 14: ...ble u channel INSTALL CORNER BAFFLES continued 4 Take the 108654 roll of 6 mil film and cut a piece to cover the end bay opening framed by the single u channel Roll out the film and measure length to...

Страница 15: ...r to the other end of the building and repeat the steps to secure the main cover in the U Channel NOTE Pull the cover tight as the spring is inserted into the U Channel INSTALL MAIN COVER Gather the p...

Страница 16: ...uring the first side move to the remaining side and secure it in place IMPORTANT DO NOT REMOVE TOO MUCH OF THE EXCESS COVER MATERIAL AT EACH END Some excess main cover material the material that exten...

Страница 17: ...2 Attach the roll up conduit to the bottom of the main cover 3 Assemble and install the crank assembly 4 Install the Anti Billow Rope system 5 Test the operation of the roll up side 4 Place the assem...

Страница 18: ...e universal joint using a Tek screw NOTE This extension pipe can be trimmed to the desired length 6 Add the spin handle to the extension pole and secure the connection with a Tek screw 7 Repeat the st...

Страница 19: ...the number of anti billow ropes for each side using the Side Profile diagram in the Quick Start section for your frame length 2 Attach the 117063 rope hooks using wood screws for wood and Tek screws f...

Страница 20: ...anytime Remove debris and objects that may accumulate on the cover Use tools that will not damage the cover when removing debris Remove snow to prevent excess accumulation Use tools that will not dama...

Страница 21: ...ICK START GUIDE 20 Wide Round Economy High Tunnel Height 20 0 5 8 12 3 5 16 Width 2 3 Sidewall Height Grid Represents 12 Squares F FR RO ON NT T Diagram may show a different but similar model Economy...

Страница 22: ...SPAN ROUND ECONOMY HIGH TUNNELS Revision date 10 25 21 FRONT PROFILE 102675 102675 End 102856 Middle 102548 End 102856 Middle 102548 End 102856 Middle 102548 20R1601 20R1601 20R1601 20R1602 166S027D 1...

Страница 23: ...DE This frame length requires one anti billow rope and nine 9 117063 EZ Snap Rope Clips and eight 8 FA2061 eyebolts per side Circled point shows the end of each rope and the location of two 2 117063 E...

Страница 24: ...frame length requires two 2 anti billow ropes and four 4 117063 EZ Snap Rope Clips and six 6 FA2061 eyebolts per side Circled point shows the end of each rope and the location of two 2 FA2061 eyebolts...

Страница 25: ...uires three 3 anti billow ropes and nine 9 117063 EZ Snap Rope Clips and eight 8 FA2061 eyebolts per side Circled point shows the end of each rope and the location of two 2 117063 EZ Snap Rope Clips A...

Страница 26: ...LS Revision date 10 25 21 End Rafter Purlin Connection View 1 Mid Rafter Purlin Connection View 2 CONNECTIONS AND DETAILS 102548 Purlin Rafter View 2 Mid Rafter Purlin Connection Rafter Purlin 102856...

Страница 27: ...27 GROWSPAN ROUND ECONOMY HIGH TUNNELS Revision date 10 25 21 Space below is reserved for customer notes...

Отзывы: