SAFETY PRECAUTIONS
• Wear eye protection.
• Wear head protection.
•
Parts may be sharp.
Wear gloves when handling the pipe and PolyCor
material.
• Use a portable GFCI when working with power tools and cords.
• Do not climb on the cold frame during or after construction.
• Do not occupy the structure during high winds, tornadoes, or hurricanes.
• Provide adequate ventilation if the structure is enclosed.
• Do not store hazardous materials in the cold frame.
ANCHORING INSTRUCTIONS
Prior to assembling this cold frame, please read the MUST READ document
included with the shipment.
WARNING:
Strong winds can cause the cold frame to shift if it is not
adequately secured to the site. Failing to properly anchor the cold frame
may cause serious injury and damage.
The site on which the cold frame is constructed will determine the anchoring
method that is required.
Consult a professional contractor to determine the best and safest way to
anchor the frame.
Contact your sales representative at 1-800-245-9881 for anchoring
suggestions.
YOU MUST READ THIS DOCUMENT BEFORE YOU ASSEMBLE THE COMMERCIAL COLD FRAME.
Thank you for purchasing this GrowSpan™ Flip-Top Cold Frame. These instructions include helpful hints and important information needed to safely assemble
and properly maintain the cold frame. Please read these instructions
before
you begin. If you have any questions during the assembly, contact Customer Service
at 1-800-245-9881 for assistance.
LOCATION
Choosing the proper location is an important step before you begin to
assemble the cold frame. The following suggestions and precautions will help
you determine whether your selected location is the best location.
• Identify whether underground cables or pipes are present
before
preparing
the site or anchoring the cold frame.
• Location should be away from structures that could cause snow to drift on
or around the cold frame.
• Do not position the cold frame in a place where large loads such as snow
and ice, large branches, or other overhead obstacles could fall.
SITE
After choosing a location, proper preparation of the site is essential. The
following site characteristics will help ensure the integrity of the greenhouse.
• The site must be level to properly and safely erect and anchor the cold
frame.
• Drainage: Water draining off the structure and from areas surrounding the
site should drain away from the site to prevent damage to the site, the
structure, and contents of the structure.
WARNING:
The individuals assembling this structure are responsible for
furnishing all temporary bracing, shoring and support needed during the
assembly process (if applicable). For safety reasons, those who are not
familiar with recognized construction methods and techniques must seek
the help of a qualified contractor.