Install End Wall Frame — General Notes

INSTALL END WALL FRAME

Refer to end frame diagrams in Quick Start section and those on the following pages for assembly 

details. 

Read notes below to assemble end wall frame.

•  Secure all tube splices and connections using FA4482B Tek screws. One for each splice and 

connection is sufficient.

•  Install all Tek screws in locations that 

will not contact

 roof or end wall cladding when cladding 

is installed.

•  Secure base tube between ground posts using FA4482B Tek screws and QH1330 brackets.
•  Vertical frame member dimensions are measured from center-to-center unless noted 

otherwise on diagrams.

•  When measuring vertical tube lengths, remember to account for the square-to-round bracket 

(104074) that connects vertical tubes to band clamps on end rafter.

•  Secure each band clamp to end rafter using an FA4482B Tek screw.
•  Secure each square tube fitting (104624) to each vertical frame tube using an FA4482B Tek 

screw.

•  During installation, ensure all vertical tubes are plumb.

Detailed steps start on next page. These are main frame assembly and installation steps:
1.  Assemble and install base rail. Use 102897 swaged tubes, joined, and cut to fit (as needed).
2.  Frame and install door. Use QH1330 brackets installed outside door opening to secure door 

jambs to base rail and header to door jambs.

3.  Review dimensions for accessories such as fans and shutters and determine where to install 

these in the end walls.  

 

ATTENTION:

 Consider door operation and required locations of end wall vertical tubes for 

end wall polycarbonate panel installation. Positions of some vertical tubes cannot be moved 

regardless of accessories.

4.  Install all vertical frame tubes.
5.  Secure all band clamps to end rafter tube using an FA4482B Tek screw for each.
6.  Check all tube splices to ensure each is secured with a Tek screw. 
7.  Continue with end wall cladding installation.

 81 7/8" 

37 5/8"

CL -CL

NOTE: COLUMNS NOT DIMENIONED HAVE A NON-CRITICAL PLACEMENT 

AND ARE USED FOR POLYCARBONATE SUPPORT.

ALL END FRAMING TUBES ARE FULL LENGTH OR CUT

FROM 1 1/2" X 1 1/2" SQUARE TUBING.

Confirm door design and dimensions by examining 

the door included with your greenhouse. Adjust rough 

opening dimensions shown above as needed to install 

door. 

ATTENTION:

 Some doors designs require setting door 

in place and then installing door jambs. See page 20.

Gather parts:
•  Square Tube #102897
•  Angle Brackets (#QH1330) & Band Clamp 

(#QH1402)

•  Square Tube Fitting (#104624)
•  Square-to-Round Tube Connect Bracket 

(#104074)

•  Carriage Bolt (#FAH320) and Nut (#FALB32B)
•  Tek Screws (#FA4482B)

Содержание 106205

Страница 1: ...n Gothic Premium Greenhouse 14 Wide Ground Level Ground Level 2018 GrowSpan All Rights Reserved Reproduction is prohibited without permission STK DIMENSIONS 106205 14 W x 9 4 H x 16 L 106206 14 W x 9...

Страница 2: ...G INSTRUCTIONS Prior to assembling this greenhouse please read the MUST READ document included with the shipment WARNING The anchor assembly is an integral part of the greenhouse construction Improper...

Страница 3: ...g and support needed during the assembly process For safety reasons those who are not familiar with recognized construction methods and techniques must seek the help of a qualified contractor ASSEMBLY...

Страница 4: ...ontaining smaller parts such as fasteners or washers if equipped SPECIAL NOTE BASEBOARDS FOR FRAME Customer Supplied If desired baseboards can be installed at ground level along each side of the frame...

Страница 5: ...to Round Tube Connect Bracket 102856 End Clamp FAH009B FALB01B Carriage Bolt Hex Nut 104624 Square Tube Fitting QH1330 Angle Bracket 104213 Aluminum U Channel Aluminum 8 H Channel 102921 Neo bonded Wa...

Страница 6: ...llation Use the diagrams on this page to install H channel with flat side facing out ATTENTION Use only 1 1 2 Tek screws FA4484B to attach H channel to building frame Do not use the shorter 1 Tek scre...

Страница 7: ...he greenhouse construction Improper anchoring may cause instability and failure of the structure to perform as designed Failing to anchor the shelter properly will void the manufacturer s warranty and...

Страница 8: ...from first stake at 90 NOTE Use the 3 4 5 rule or other means to set an accurate 90 angle Refer to diagram Using multiples of 3 4 5 such as 6 8 10 or 12 16 20 helps to maintain an accurate 90 angle Se...

Страница 9: ...rafters Tek Screws FA4482B Nut Setter 3 8 x 2 9 16 Magnetic ASSEMBLE GREENHOUSE FRAME END RAFTERS 2 After site is prepared and an inventory of parts is complete continue with rafter assembly NOTE All...

Страница 10: ...re all rafter pipe splices as described on previous page Set assembled rafters aside in an accessible location Purlin cross connector clamps for interior rafters are installed during frame assembly Se...

Страница 11: ...ior rafters using purlin pipes and clamps Use lift to set rafters small building rafters can be set by hand when assistants are available Wear safety gear at all times during frame assembly Complete t...

Страница 12: ...e strap or braces to stabilize rafter FRAME ASSEMBLY CONTINUED Inside of Shelter Outside of Shelter Rafter Ground Post Band Clamp Front Back 3 Slide a band clamp onto legs of first interior rafter lif...

Страница 13: ...connector for all interior rafters Position plain end of pipe at end rafter 5 Tighten end clamp to secure pipe Drive FA4482B Tek screw through end clamp into rafter to secure clamp to rafter Install a...

Страница 14: ...clamps to rafter and purlin pipe See Figure 2 previous page 10 Secure each purlin pipe splice using an FA4482B Tek screw 11 Repeat steps as needed to complete assembly of frame ATTENTION Slide a band...

Страница 15: ...d to end rafter band clamp Install clamp if needed Adjust strut position so lower end of strut reaches band clamp on second rafter Install that band clamp too if needed Strut End Rafter Interior Rafte...

Страница 16: ...onal anchoring information if needed CAUTION Anchor assembly is an integral part of the greenhouse construction Improper anchoring may cause instability and failure of structure to perform as designed...

Страница 17: ...agrams when deciding where to install additional horizontal framing for accessories NOTE Some vertical frame tubes must remain in locations shown on end frame diagrams Polycarbonate panel installation...

Страница 18: ...joined and cut to fit as needed 2 Frame and install door Use QH1330 brackets installed outside door opening to secure door jambs to base rail and header to door jambs 3 Review dimensions for accessor...

Страница 19: ...e door as shown below DO NOT TIGHTEN THE BOLTS AT THIS TIME 5 Select tubing for two door jambs Each support includes One 1 102897 swaged tube assembly cut to length and one 1 square to round tube brac...

Страница 20: ...ront back of greenhouse 11 Repeat steps as needed to construct remaining door jamb and attach bracket to top 12 Attach second jamb to band clamp on rafter 13 Using marks on base rail for door attach b...

Страница 21: ...r for each support 21 Using end frame diagrams Quick Start section measure and mark on base rail the locations of remaining supports ATTENTION If no dimensions are shown evenly space the supports for...

Страница 22: ...nd clamp Do not tighten 26 Verify that frame tube is plumb and use FA4482B screws to secure 104624 tube fitting to base rail INSTALL END WALL FRAME CONTINUED Center Mark 27 Tighten top band clamp and...

Страница 23: ...allation section 2 Based on installation requirements and precautions of the accessory choose a location in the end wall where you can mount the accessory 3 Cut two 2 1 5 x 1 5 frame tubes to required...

Страница 24: ...after removing protective film ATTENTION Remove protective film from panels Allowing film to remain intact and in direct sunlight will make it difficult if not impossible to remove During preparation...

Страница 25: ...ntersection on the panel remove panel and cut to shape WARNING DO NOT CUT PANEL TO FOLLOW RAFTER RADIUS ROOF PANELS DO NOT BEND AROUND RADIUS WHEN INSTALLED REVIEW ROOF AND SIDEWALL PANEL INSTALLATION...

Страница 26: ...re different sections of profile U channel end cap and H channel intersect so you cut profile to proper length Determine how you want these profiles to intersect and install as needed to achieve the d...

Страница 27: ...dashed line Panel edges adjacent to door are capped with 104213 U channel and then tucked behind door channel when possible Bottom edge of panel above door is capped with 104548 end cap 2 After insta...

Страница 28: ...replace worn or broken ropes immediately Remove debris and objects that accumulate on greenhouse Use tools that will not damage cover when removing debris Remove snow to prevent excess accumulation Us...

Страница 29: ...29 Revision date 08 30 18 106205_06_07_08 Customer Notes...

Страница 30: ...on date 08 30 18 4 0 9 4 Shelter Height Sidewall Shelter Width 14 3 1 16 Grid Represents 12 Squares F FR RO ON NT T QUICK START GUIDE 14 Wide Gothic Premium Greenhouse Ground Level Quick Start Guide G...

Страница 31: ...5 1 90 Ground Post 102675 1 90 Ground Post Purlin Connection Notes Purlin connected to end rafter using 102856 clamp Purlin connected to mid rafters using 102548 connector Purlin connection See Connec...

Страница 32: ...fter Base Rail Connection View 2 Rafter Endwall Connection View 3 Purlin End Rafter Connection View 4 Purlin Mid Rafter Connection View 5 Ground Level Ground Level Ground Post Baseboard ATTENTION Base...

Страница 33: ...4 Purlin End Rafter Connection View 2 Rafter Base Rail Connection View 5 Purlin Mid Rafter Connection View 3 Rafter Endwall Connection QH1402 1 66 Band Clamp Endwall Rafter 104074 Sq Rnd Tube Bracket...

Страница 34: ...131S075 131S075 131P0495 Purlin Run 4 0 On Center Rafter Spacing 16 0 Shelter Length Center to Center Ground Level Ground Post Customer Supplied Baseboard ATTENTION Baseboard is strongly recommended...

Страница 35: ...On Center Rafter Spacing 20 0 Shelter Length Center to Center 131S075 131S075 131S075 Purlin Run 131P0255 Ground Level Ground Post Customer Supplied Baseboard ATTENTION Baseboard is strongly recommen...

Страница 36: ...S075 131S075 131S075 Purlin Run 131P0735 Rafter Spacing 4 0 On Center 24 0 Shelter Length Center to Center Ground Level Ground Post Customer Supplied Baseboard ATTENTION Baseboard is strongly recommen...

Страница 37: ...S075 131S075 131S075 Purlin Run 131S075 131P0495 Rafter Spacing 4 0 On Center 28 0 Length Center to Center Ground Level Ground Post Customer Supplied Baseboard ATTENTION Baseboard is strongly recommen...

Страница 38: ...E COLUMNS NOT DIMENIONED HAVE A NON CRITICAL PLACEMENT AND ARE USED FOR POLYCARBONATE SUPPORT ALL END FRAMING TUBES ARE FULL LENGTH OR CUT FROM 1 1 2 X 1 1 2 SQUARE TUBING ATTENTION Measure door that...

Страница 39: ...5_06_07_08 Back End Frame Diagram 81 7 8 37 5 8 C L C L NOTE COLUMNS NOT DIMENIONED HAVE A NON CRITICAL PLACEMENT AND ARE USED FOR POLYCARBONATE SUPPORT ALL END FRAMING TUBES ARE FULL LENGTH OR CUT FR...

Страница 40: ...End Wall Panel Layout with Door H CHANNEL U CHANNEL 6 X 10 POLY 4 X 8 POLY 6 X 10 POLY END CAP ABOVE DOOR ONLY NOTE INSTALL UV PROTECTED SIDE OF PANEL TO THE OUTSIDE POLYCARBONATE PANELS Use 104213 U...

Страница 41: ...41 Revision date 08 30 18 106205_06_07_08 End Wall Panel Layout without Door H CHANNEL NOTE INSTALL UV PROTECTANT PANEL TO THE OUTSIDE 4 X 10 POLY 6 X 10 POLY 6 X 10 POLY Ground Level...

Страница 42: ...low channel side out installation Use the diagrams on this page to install H channel with flat side facing out ATTENTION Use only 1 1 2 Tek screws to attach H channel to building frame Do not use shor...

Страница 43: ...43 Revision date 08 30 18 106205_06_07_08 Customer Notes...

Отзывы: