YOU MUST READ THIS DOCUMENT BEFORE YOU
BEGIN TO ASSEMBLE THE SHELTER
.
Thank you for purchasing this GrowSpan™ shelter. When
properly assembled and maintained, this product will
provide years of reliable service. These instructions include
helpful hints and important information needed to safely
assemble and properly maintain the shelter. Please read
these instructions
before
you begin.
If you have any questions during the assembly, contact
Customer Service for assistance.
SAFETY PRECAUTIONS
• Wear eye protection.
• Wear head protection.
• Wear gloves when handling metal tubes.
• Use a portable GFCI (Ground Fault Circuit Interrupter)
when working with power tools and cords.
• Do not climb on shelter or framing during or after
construction.
• Do not occupy shelter during high winds, tornadoes, or
hurricanes.
• Provide adequate ventilation if shelter is enclosed.
• Do not store hazardous materials in shelter.
• Provide proper ingress and egress to prevent
entrapment.
ANCHORING INSTRUCTIONS
Prior to assembly, read the
MUST READ
document
included with the shipment.
WARNING:
The anchor assembly is an integral part of
the shelter construction. Improper anchoring may
cause shelter instability and failure of the shelter.
Failing to anchor the shelter properly
will void the
manufacturer’s warranty
and may cause serious injury
and damage.
LOCATION
Choosing the proper location is an important step. The
following suggestions and precautions will help
determine whether your selected location is the best
location.
• Never erect shelter under power lines.
• Identify whether underground cables and pipes are
present
before
preparing the site, driving ground posts
or anchoring the shelter.
• Location should be away from shelters that could
cause snow to drift on or around the frame.
• Do not position shelter where large loads such as
snow and ice, large tree branches, or other overhead
obstacles could fall.
SITE
After choosing a location, proper preparation of the site is
essential. Follow the information below.
•
A level site is required
. Site must be level to properly
and safely erect and anchor the shelter.
•
Drainage: Water draining off the shelter and from
areas surrounding the site should drain away from the
site to prevent damage to the site, shelter, and
shelter contents.
WARNING:
Individuals assembling this shelter are
responsible for designing and furnishing all temporary
bracing, shoring and support needed during assembly.
For safety reasons, those who are not familiar with
recognized construction methods and techniques must
seek the help of a qualified contractor.
ASSEMBLY NOTE:
Install Tek screws using a
clutched drill driver running approximately 750 RPM
while applying approximately 50 lbs of force.
Do not use an impact driver!