![Growatt THOR 11AS-P Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/growatt/thor-11as-p/thor-11as-p_user-manual_2270424006.webp)
3.2.4 Fix the mounting bracket onto the pole.
3.2.5 Position the charge point onto the bracket and secure it on the bracket with the 2
screws.
3.2.6 Crimp the below shown insulated ferrule or ring terminals on the end of the AC input
wires. Connect the wires into the terminal block of the charge point as below. Check the
wiring and then close the RCBO in the side window. Close the side window with the cover,
then the wring is done.
7
8
Terminal
Wire
Model
L1/L2/L3/N
PE
11K
22K
44K
11K
22K
44K
2
≧
2.5mm
≧
AWG12
2
≧
2.5mm
≧
AWG12
2
≧
6mm
≧
AWG9
2
≧
6mm
≧
AWG9
2
≧
16mm
≧
AWG5
2
≧
16mm
≧
AWG5
IV.
APP download, register, and login
4.1 APP download
Users can scan the QR code (Android and IOS ) with the WeChat, or go to the App
Store and Google Play to search for ShinePhone or log in to our monitoring
website server.growatt.com or server-cn.growatt.com to download.
4.2 Register
Before using ShinePhone APP first time, the user must register an account in advance.
There are three steps when users register the account:
(1) Fill in the account registration information.