2
Electrical installation
Electrical installation work must only be performed
by a qualified electrician. This work must be
carried out in accordance with the regulations
according to IEC 60364-7-701 (corresponding
to VDE 0100 Part 701) as well as all national and
local regulations.
• Extension cables are
not
permitted between the electrical
socket and boiling water storage heater connection.
Installation
Refer to the dimensional drawing on fold-out page I.
Installing fitting
, see fold-out page II, Figs. [1] and [2].
Insert fitting in sink hole. This will require leading through the
hoses one at a time.
Note:
If there is no need to fit support plate (A), the clamping
length may be increased by 15mm, see Fig. [1].
Mount safety relief valve kit to the waste pipe
, see Figs. [3]
to [6].
Mount wall holder,
see Figs. [7] and [8].
Mount compression couplings (B) and tighten nipple,
see
Fig. [9].
Fix expansion vessel (C) with safety assembly to the wall
holder,
see Fig. [10].
Connect filter head and filter,
see technical product
information for the filter head and the filter cartridge and fold-
out page III, Fig. [11]. Note direction of flow.
1. Install pressure hose (D) to the inlet of filter head.
2. Install sensor (E) at outlet of filter head. The sensor (E) must
be installed horizontally.
3. Install display unit (F).
Use suitable screws and wall plugs (not included in the scope
of delivery).
Connect filter system,
see Fig. [12].
1. Connect adaptor (G) on the cold-water service valve.
2. Screw pressure hose (D) of filter system onto adapter (G).
3. Screw hose (H) onto sensor (E).
Connect storage heater,
see Figs. [2] and [13].
Install storage heater taking into consideration the
available hose lengths.
Do not
connect voltage supply yet.
Flush pipes thoroughly before and after installation
(observe EN 806)
.
1. Connect expansion vessel (C), see Fig. [13].
2. Screw hose (H) to expansion vessel (C).
3. Screw storage heater pressure hose (I) marked
blue
to
expansion vessel (C) using the seals provided.
4. Connect copper pipe (not in the scope of delivery) to
the Ø15mm compression connection (J) of the expansion
vessel (C) and tighten.
Connecting fitting,
see fold-out page III, Fig. [14].
1. Screw fitting pressure hose (K) marked
blue
to adapter (G).
2. Screw
red
marked pressure hose (L) of the fitting onto the
hot-water service valve.
3. Connect the fitting pressure hose (M) marked
99 °C
to
connection (N) on the storage heater.
Open the service valve and check connections for
watertightness.
Filling storage heater with water,
see Figs. [15] and [16].
1. Pull button (O1) on handle (O) of fitting outward and turn the
handle anti-clockwise, see Fig. [15].
2. Fill the storage heater until water comes out the spout of
the fitting.
3. Connect voltage supply via mains plug (P), see Fig. [16].
4. Press and hold button (Q) on storage heater for at
least 2 seconds to switch on the storage heater. The red
indicator lamp (Q1) indicates that the storage heater is
switched on.
Important!
The spout must not be fitted with any downstream
resistances in the form of air bubblers (e.g. mousseurs) or
components reducing flow (e.g. restrictors) as these will
result in damage to the storage heater.
Set water hardness at filter head,
see fold-out page IV,
Fig. [17].
Set water hardness at bypass setting of filter head to local
conditions, see table column
A
on page 4.
The relevant water supplier can provide information on the
water hardness.
The bypass value setted to the filter head must also be set on
the display unit (F), see Fig. [18].
Setting the litre specification
(factory setting is 600 litre),
see Fig. [18].
The value for the litre specification depends on the water
hardness as per table column
B
on page 4:
The GROHE Red boiling water system is now fully
installed and ready for operation.
Button
Display
Briefly press
PROG
button
(
PRG
flashes)
Briefly press
RESET
button to access
programming for litre specification
(0000
0
flashes)
Keep pressing
PROG
button until
required position is reached
(00
0
00 digit flashes)
Keep pressing
RESET
button until
required digit is reached
(00
6
00 digit flashes)
Keep pressing
PROG
button to exit
menu (
PRG
disappears and set value
appears)
The date of installation must be noted on the
maintenance sticker and affixed at a visible location
on the storage heater.
Содержание Red Duo 30 058
Страница 2: ...I 30 058 30 153 Please pass these instructions on to the end user of the fitting ...
Страница 8: ......
Страница 9: ......
Страница 11: ...IV X 22 17 F 18 F2 F3 19 F1 20 S 21 W R T U 30mm 3mm V ...