background image

2

Electrical installation

Electrical installation work must only be performed 
by a qualified electrician. This work must be 
carried out in accordance with the regulations 
according to IEC 60364-7-701 (corresponding 
to VDE 0100 Part 701) as well as all national and 
local regulations.

• Extension cables are 

not

 permitted between the electrical 

socket and boiling water storage heater connection.

Installation

Refer to the dimensional drawing on fold-out page I.

Installing fitting

, see fold-out page II, Figs. [1] and [2].

Insert fitting in sink hole. This will require leading through the 
hoses one at a time.

Note: 

If there is no need to fit support plate (A), the clamping 

length may be increased by 15mm, see Fig. [1].

Mount safety relief valve kit to the waste pipe

, see Figs. [3] 

to [6]. 

Mount wall holder,

 see Figs. [7] and [8].

Mount compression couplings (B) and tighten nipple,

 see

Fig. [9].

Fix expansion vessel (C) with safety assembly to the wall 
holder,

 see Fig. [10].

Connect filter head and filter, 

see technical product 

information for the filter head and the filter cartridge and fold-
out page III, Fig. [11]. Note direction of flow.
1. Install pressure hose (D) to the inlet of filter head.
2. Install sensor (E) at outlet of filter head. The sensor (E) must 

be installed horizontally.

3. Install display unit (F).
Use suitable screws and wall plugs (not included in the scope 
of delivery).

Connect filter system,

 see Fig. [12].

1. Connect adaptor (G) on the cold-water service valve.
2. Screw pressure hose (D) of filter system onto adapter (G).
3. Screw hose (H) onto sensor (E).

Connect storage heater,

 see Figs. [2] and [13].

Install storage heater taking into consideration the 
available hose lengths.

Do not

 connect voltage supply yet.

Flush pipes thoroughly before and after installation 

(observe EN 806)

.

1. Connect expansion vessel (C), see Fig. [13].
2. Screw hose (H) to expansion vessel (C). 
3. Screw storage heater pressure hose (I) marked 

blue

 to 

expansion vessel (C) using the seals provided.

4. Connect copper pipe (not in the scope of delivery) to 

the Ø15mm compression connection (J) of the expansion 
vessel (C) and tighten.

Connecting fitting,

 see fold-out page III, Fig. [14].

1. Screw fitting pressure hose (K) marked 

blue

 to adapter (G).

2. Screw 

red 

marked pressure hose (L) of the fitting onto the 

hot-water service valve.

3. Connect the fitting pressure hose (M) marked 

99 °C

 to 

connection (N) on the storage heater.

Open the service valve and check connections for 
watertightness.

Filling storage heater with water,

 see Figs. [15] and [16].

1. Pull button (O1) on handle (O) of fitting outward and turn the 

handle anti-clockwise, see Fig. [15].

2. Fill the storage heater until water comes out the spout of 

the fitting.

3. Connect voltage supply via mains plug (P), see Fig. [16].
4. Press and hold button (Q) on storage heater for at 

least 2 seconds to switch on the storage heater. The red 
indicator lamp (Q1) indicates that the storage heater is 
switched on.

Important!

The spout must not be fitted with any downstream 
resistances in the form of air bubblers (e.g. mousseurs) or 
components reducing flow (e.g. restrictors) as these will 
result in damage to the storage heater.

Set water hardness at filter head,

 see fold-out page IV, 

Fig. [17].
Set water hardness at bypass setting of filter head to local 
conditions, see table column 

A

 on page 4. 

The relevant water supplier can provide information on the 
water hardness. 
The bypass value setted to the filter head must also be set on 
the display unit (F), see Fig. [18].

Setting the litre specification

 (factory setting is 600 litre), 

see Fig. [18].
The value for the litre specification depends on the water 
hardness as per table column 

B

 on page 4:

The GROHE Red boiling water system is now fully 
installed and ready for operation.

Button

Display

Briefly press 

PROG

 button 

(

PRG

flashes)

Briefly press 

RESET

 button to access 

programming for litre specification 
(0000

0

 flashes)

Keep pressing 

PROG

 button until 

required position is reached 
(00

0

00 digit flashes)

Keep pressing 

RESET

 button until 

required digit is reached 
(00

6

00 digit flashes)

Keep pressing 

PROG

 button to exit 

menu (

PRG

 disappears and set value 

appears)

The date of installation must be noted on the 
maintenance sticker and affixed at a visible location 
on the storage heater.

Содержание Red Duo 30 058

Страница 1: ... 19 LV 23 RUS 27 E 4 DK 8 UAE 12 P 16 HR 20 LT 24 Design Engineering GROHE Germany GROHE Red Duo GROHE Red Duo 99 133 231 ÄM 230155 04 14 30 058 30 153 GB 1 I 5 N 9 GR 13 TR 17 BG 21 RO 25 DK 6 NL 6 FIN 10 CZ 14 SK 18 EST 22 CN 26 F 3 S 7 PL 11 H 15 SLO 19 LV 23 RUS 27 E 4 DK 8 UAE 12 P 16 HR 20 LT 24 ...

Страница 2: ...I 30 058 30 153 Please pass these instructions on to the end user of the fitting ...

Страница 3: ...II 1 13mm 19 017 A max 60mm max 45mm A 7 Ø8 2 2 24mm 31mm G1 2 G3 8 31mm 24mm B B 9 C 10 8 10mm 4 Ø40 Ø32 5 6 3 min 50 284 ...

Страница 4: ...rooms The boiling water storage heater is only suitable for indoor use The boiling water storage heater must be placed in an upright position The boiling water storage heater and plug must not be directly or indirectly sprayed with water when cleaning The boiling water storage heater must not be opened Use only genuine replacement parts and accessories The use of other parts will result in voiding...

Страница 5: ...he Ø15mm compression connection J of the expansion vessel C and tighten Connecting fitting see fold out page III Fig 14 1 Screw fitting pressure hose K marked blue to adapter G 2 Screw red marked pressure hose L of the fitting onto the hot water service valve 3 Connect the fitting pressure hose M marked 99 C to connection N on the storage heater Open the service valve and check connections for wat...

Страница 6: ... page IV Fig 21 1 Lever out plug T and remove set screw U 2 Remove lever R and cap V 3 Remove screw coupling W and take out cartridge S Assemble in reverse order When installing the cartridge S ensure that the seals are correctly seated Screw in screw coupling W and tighten III Flow straightener Remove and clean flow straightener 13 263 see fold out page I Assemble in reverse order Service Note th...

Страница 7: ... 22 Wait max 15 minutes Flow rate too low Fitting flow straightener dirty or defective Isolating valve not fully open Water supply restricted Replace flow straightener see section Maintenance Fully open shut off valves isolating valves Check supply lines open isolating valve Water not boiling Storage heater not hot enough yet Wait approx 15 minutes after switching on Storage valve losing water Hos...

Страница 8: ......

Страница 9: ......

Страница 10: ...III E D 19mm F 19mm OUT IN 11 D E G H 19mm 19mm 12 19mm H I C 24mm 19mm 13 J Ø15mm O1 O R 15 Q1 Q P 2sec 16 N K M G 19mm 19mm L 19mm 14 ...

Страница 11: ...IV X 22 17 F 18 F2 F3 19 F1 20 S 21 W R T U 30mm 3mm V ...

Страница 12: ...30 info grohe co jp KZ 7 727 311 07 39 info cac grohe com LT 372 6616354 grohe grohe ee LV 372 6616354 grohe grohe ee MAL 1 800 80 6570 info singapore grohe com N 47 22 072070 grohe grohe no NL 31 79 3680133 vragen nl grohe com NZ 09 373 4324 P 351 234 529620 commercial pt grohe com PL 48 22 5432640 bLuro grohe com pl RI 62 21 2358 4751 info singapore grohe com RO 40 21 2125050 info ro grohe com R...

Отзывы: