3
GB
Safety notes
• Installation is only possible in frost-free rooms.
• The generator must not be cleaned with compressed air.
Use
only genuine replacement parts and accessories
. The
use of other parts will result in voiding of the warranty and the
CE identification, and could lead to injuries.
Function
The Powerbox transforms the energy, that is generated
through the water flow, into electrical energy and stores this.
From 6 water flows with a duration of 10 s daily, the fitting can
be operated energy self-sufficient.
Technical data
• Electrical storage designed for energy self-sufficient
operation:
- operating time after 10 s water flow:
4 h
- operating time after 260 s water flow:
100 h
• Emergency power supply:
6V lithium battery type CR-P2
• Automatic safety shut-off:
60 s
(6 - 420 s adjustable)
• Run-on time (0 - 19 s adjustable):
1 s
• Reception range according to Kodak Gray Card,
grey side, 8x10", landscape (7 - 20cm adjustable):
13cm
• Type of protection
- Fitting:
IP 59K
- Powerbox:
IP 44
Thermal disinfection possible.
The remaining battery capacity is not readable.
If static pressures exceed 0.5 MPa, a pressure-reducing valve
must be installed.
Installation
, see fold-out page II.
Flush pipes thoroughly before and after
installation
(observe EN 806)
!
Open hot and cold water supply and check that
connections are watertight.
Initial start
After making plug-in connection fitting is in setting mode for
3 minutes. After the 3 minutes the fitting is ready for operation
and the continuous operation can be performed.
Performing continuous operation to load the storage, see
technical product information 99.0438.xxx,
thermal disinfection (B).
While the continuous operation the indicator lamp in the
storage electronics must light, see Fig. [5].
Operation,
see technical product information, 99.0438.xxx.
Maintenance
, see fold-out page III - IV.
•Shut off hot and cold water supply.
•Inspect and clean all components and replace if
necessary.
Generator and battery housing,
see
fold-out page III.
Assemble in reverve order.
Start water flow. The indicator lamp in the storage
electronics must light while the water flow, see fold-out
page II, Fig. [5].
Storage electronic and battery housing,
see fold-out page IV.
Assemble in reverve order.
Wait 1 hour.
Perform continuous operation.
Battery housing,
see fold-out page IV.
Assemble in reverve order.
Start water flow. The indicator lamp in the storage
electronics must light while the water flow, see fold-out
page II, Fig. [5].
The battery housing must be replaced 10 years after
commissioning of the fitting at the latest.
Replacement parts
see fold-out page I (* = special accessories)
,
Care
For directions on the care of this fitting, please refer to the
accompanying Care Instructions.
Содержание EUROECO COSMOPOLITAN E + POWERBOX 36 384
Страница 2: ...I ...
Страница 3: ...II 19 017 13mm 1 2 Ø6 3a 19mm 19mm Ø6 3b 19mm 19mm 19mm 19mm 19mm 3c 19mm 4 5 6 ...
Страница 26: ...23 ...
Страница 27: ...24 ...
Страница 60: ......
Страница 61: ......
Страница 62: ...III 1 2 1 2 3 1 1 2 2 3 4 ...
Страница 63: ...IV 1 2 1 ...