background image

1

English

Application 

Operation is possible in conjunction with:
- Pressurized storage heaters

Operation is 

not

 possible with:

-Low-pressure storage heaters 

(displacement water heaters)

Specifications 

Max. flow      

     

8.3 L/min or 2.2 gpm/60 psi

GROHE WaterCare

     5.7 L/min or 1.5 gpm/60 psi

Flow pressure   
-  min.                                       

7.25 psi

-  recommended                         

14.5 - 72.5 psi

-  greater than 72.5 psi, fit with pressure  reducing 

valves

Max. operating pressure                      

145 psi

Test pressure                                

232 psi

Temperature    
- max. (hot water inlet)                      

176 

°

F

 Water connection   

cold - Right hand

hot - Left hand

Note

Major pressure differences between cold and hot 
water supply should be avoided.

Installation

See dimensional drawings on fold-out page I.

Flush pipes thoroughly!

Side valves

Valve with a groove on the top edge of the 
headpart (A) and in addition marked with blue tape 
should be mounted on the right (cold water) side, 
see fold-out page III, fig. [1].

Valve without a groove on the top edge of the 
headpart (A) and in addition marked with red tape 
should be mounted on the left (hot water) side.

1. Screw the mounting set (B) to the bottom of the 

thread of the side valve (C), see fold-out page III, 
fig. [1].
Make sure that the rubber washer (B1) is on the top 
of the fiber washer (B2).

2. Insert the side valve (C) through the basin hole from 

below.

3. Place the escutcheon O-ring (D1) on the basin and 

screw down the escutcheon (D) until it stops.

4. Screw the cap (E) down to the escutcheon (D). 
5. Secure snap insert (F) with screw (G) to the stem of 

the headpart (A).

6. Tighten the mounting set (B) from below to secure 

the valve.

Fit swivel spout,

 see fig. [2].

When assembling, the waste rod (H) has to be placed 
into the body.

Fit pop-up drain (28 957),

 see fold-out page II, ensure 

that flange of pop-up drain is sealed.

Connect wideset,

 see figs. [3] and [4].

Connect the side valves to the water supply. Insure the 
supplied washers are used for all connections.

The hot water supply should be connected on the left 
side valve (marked red) and the cold water supply to 
the right valve (marked blue).

Open cold and hot water supply and check 
connections for watertightness.

Maintenance

Inspect and clean all parts, replace as necessary and 
grease with special grease.

Shut off cold and hot water supply.

I. Replacing the headpart,

 see fig. [5].

1. Remove handle (45 603) or lever (45 609).
2. Unscrew screw (G) and pull off snap insert (F).
3. Unscrew headpart (A) using a 17mm socket wrench.
4. Change complete headpart (A) or O-ring (A1).

Observe the different replacement part numbers of 
the headparts, 

see fold-out page II.

II. Flow regulator,

 see fold-out page II.

Unscrew and clean flow regulator (13 935).

Assemble in reverse order.

Replacement parts,

 see fold-out page II  ( * = special 

accessories).

Care

Instructions for care of this faucet will be found in the 
Limited Warranty supplement.

Отзывы: