background image

5 OM-NEB/1

6.   Turn on/off switch to “ON” to close the automatic drain valve.
7.   Using a 1/2” hardened square wrench extension, remove one of the 1-1/4” 

NPT pipe plugs from the front of the boiler.

8.   Pour 32 ounces of de-limer into the boiler.
9.   Replace the pipe plug. Use pipe joint compound, and tighten the plug securely.
10.  Turn on water supply to allow water to fill the boiler.
11.  When the reset light appears, press the START switch.
12.  Allow boiler pressure to develop. Let it stand for approximately 15 minutes 

after pressure has built up. A badly limed unit may require more than 15 
minutes.

If there are no steamer cavities or compartments with this boiler, proceed to step 
19.
13.  Turn on power to steamer cavities and set steamer timers for 10 minutes.
14.  When steamer timers sound, turn them to OFF and open the doors.
15.  When the fans have stopped, remove fan baffle partitions using protective 

gloves, and rinse with clean water.

16.  Completely wipe out steamer chambers using a degreaser and nylon pad, if 

necessary. Rinse thoroughly with clean water.

17.  Replace fan baffle partitions.
18.  Wait 10 minutes for the compartments to air dry, then close the steamer doors.
19.  Turn the on/off switch OFF, and slowly open the manual drain valve.
20.  When the boiler has drained completely, close the manual drain valve and turn 

the on/off switch to “ON” to fill the boiler with water.

21.  After the RESET light comes on, press the start switch.
22.  Allow boiler pressure to develop.
If steamers are not present, proceed to step 25.
23.  Set steamer timers for 10 minutes.
24.  When steamer signal sounds, turn timers off.
25.  If the boiler is not to be used, it may be turned off. It is ready for normal 

operation.

MAINTENANCE

WARNING: USE ONLY MANUFACTURER-SUPPLIED PARTS. USING SUBSTITUTE, 

UNAUTHORIZED OR “GENERIC” PARTS CAN CAUSE BODILY INJURY TO THE 

OPERATOR AND DAMAGE THE EQUIPMENT.

WARNING:  DO NOT EXPOSE SKIN TO ESCAPING STEAM. SEVERE BURNS MAY RESULT.

 

One of the pressure relief safety valves is located on the top left rear of the boiler.
Your boiler is designed to minimize maintenance, but certain parts may need to 
be replaced after prolonged use. For the most part, no user adjustments should 
be necessary. If a need for service arises, only Authorized Representatives should 
perform the work.
Among the most common problems is the rapid build-up of scale in the boiler. To 
avoid this, always supply water that has a low mineral content, which meets the 
standards described in the Water Quality section of this manual.

PERIODIC MAINTENANCE

The unit should be inspected by a qualified service technician at least once each 
year. The inspection should include electrical wires and connections, cleaning the 
inside of the control enclosure and pilot burner adjustment, if required.
At the back of this manual (with the information about our warranty) is a 
Maintenance and Service Log. Each time maintenance is performed on the unit, 
enter the date on which it was done, what was done, and who did it. Keep this log 
with the warranty.
In addition to yearly inspections by a qualified service technician, a weekly check of 
the following will help prevent down time and ensure continued efficient operation.
1.   Pressure gauge operation
2.   Proper water level (gauge)
3.   Strainer in water feed line (clear?)
4.   Drain piping (free running? No blockage?)
At least twice each month, check the safety valve to be sure it is working properly. 
(Ensure that the safety valve is properly set up, as described in the Installation 
Section of this manual).
When pressure reaches five PSI on the gauge, lift the lever to vent steam, then 
release it, allowing it to snap back into place.

COMPONENT REPLACEMENT

NEB/1 boilers are easy to service. The design is simple, and controls are readily 
accessible. Before replacing any part, COMPLETELY SHUT OFF ELECTRICAL 
POWER TO THE UNIT.

REPLACEMENT PARTS

 

To order parts, contact your Authorized Service Agent. Supply the model 
designation, serial number, part description, part number, quantity, and when 
applicable, voltage and phase.

CONTACT US

If you have questions pertaining to the content in this manual, contact Unified 
Brands at 888-994-7636.

TROUBLESHOOTING

Do not operate the unit if it malfunctions or has damaged or broken parts. Steam 
boilers are designed to operate smoothly and efficiently when maintained prop-
erly. However, the following is a list of checks to make if there is a problem. 
Electrical schematics are provided in this manual, and inside the unit electrical 
enclosure. IF THE ITEM ON THE LIST IS MARKED WITH (X), THE WORK SHOULD 
ONLY BE DONE BY A FACTORY-AUTHORIZED SERVICE REPRESENTATIVE.

SYMPTOM

PROCEDURE

PROCEDURE

Boiler does not fill 
with water.

User

a.   Is water supply connected and is water 

present?

b.   Is water pressure low (less than 30 PSI)?
c.   Is strainer screen (if used) clogged?
d.   Is on/off switch in base cabinet turned 

on? Is the amber light in the on/off switch 
“ON”?

e.   Is the manual drain valve open?

Authorized 
Service Rep 
Only

f.   Is the Water Level Control Board defective? 

Check for loose electrical connections on 
water fill solenoid. (X)

g.   Is the water fill solenoid valve defective? (X)
h.   Is the solenoid drain valve open or leaking? 

Check for loose electrical connections on 
solenoid drain valve. (X)

Содержание NEB/1

Страница 1: ...kettles and steamers can be mounted on the top The boiler is small enough to fit in a 24 1 8 613 mm wide by 34 3 16 868 mm deep by 29 3 16 741 mm tall maximum cabinet The boiler is constructed of 1 4...

Страница 2: ...rder to accurately choose the correct water treatment solution a water quality test has to be performed If a Free Start up is requested the ASA will perform a water quality test and Unified Brands UB...

Страница 3: ...two inches 5 cm between the drain line and the building drain unless otherwise specified by local plumbing codes SAFETY VALVE Ensure that the safety valve is vented properly The following Installatio...

Страница 4: ...200 F 93 C Once the pressure has reached 12 PSI kPa the operating pressure switch will open the heater element contactors As pressure decreases the heater element contactors close to maintain the pres...

Страница 5: ...IODIC MAINTENANCE The unit should be inspected by a qualified service technician at least once each year The inspection should include electrical wires and connections cleaning the inside of the contr...

Страница 6: ...WARRANTY Congratulations on the purchase of your new Unified Brands equipment We hope you enjoy many years of reliable service in connection with the same Please review all of the important safety an...

Страница 7: ...7 OM NEB 1 Parts List 0 7 1 3 6 8 2 4 0 7 1 3 6 8 2 4 16 15 14 9 10 19 24 23 18 17 8 7 6 5 4 12 12 2 1 3 21 22 11 13...

Страница 8: ...20 THERMOSTAT 077985 21 RELAY CUTOUT 119814 22 RELAY DPDT 24VAC 121733 23 GASKET ELEMENT 003494 24 ELEMENT 208V 12KW ELEMENT 240V 12KW ELEMENT 480V 12KW 148593 148594 148595 KEY DESCRIPTION PART TOP P...

Страница 9: ...9 OM NEB 1 Wiring Diagram CALL FACTORY FOR REPLACEMENT PARTS 888 994 7636...

Страница 10: ...10 OM NEB 1 Service Log Model No Purchased From Serial No Location Date Purchased Date Installed Purchase Order No For Service Call Date Maintenance Performed Performed By...