23
SM-GSSP BOILERLESS STEAMER
ASSEMBLY / DISASSEMBLY
WARNING: AFTER SERVICING GAS PIPING ON GAS MODELS, CHECK FOR GAS LEAKS
BEFORE PUTTING UNIT BACK IN SERVICE.
WARNING: DISCONNECT THE STEAMER FROM ELECTRIC POWER BEFORE BEGINNING
ANY SERVICE PROCEDURES.
GENERAL INFORMATION
This section provides common removal and installation procedures for parts.
The following procedures are based upon having access to the steamer on all
four sides. If the steamer is installed between other appliances and there is not
enough room on the sides for access, the steamer must be pulled out from its
position to gain proper access.
Care should be taken in moving the steamer so as not to stress or pull on the
electrical, gas and water connections.
CAVITY COMPARTMENT SIDE PANELS
For part number, see section on the steamer model parts list.
REMOVAL
1. With a Phillips screw driver remove the two 10-32 screws on the lower
edge of the panel and one at the top edge (at the center of the top panel
overhang). The panel is retained to the steamer by these three screws and
three spring-like clips at the rear edge.
2. Once the screws are removed, the panel can be pulled forward about 1 inch,
then lowered from behind the top panel overhang.
TOP COVER
For part number, see section on the steamer model parts list.
NOTE
: Under normal conditions the top should never have to be removed. The
most likely reason for removing it is if the panel itself has been damaged by a
falling object.
1. Remove right side and left side panels.
2. At the front on each side, remove the #10-32 screw securing the top to the
front panel (see illustration).
STEAMER DISPLAY CONTROL
REMOVAL
1. Unplug the display control harness from I/O board.
2. Using Phillips screw driver, carefully remove the four or five screws (number
depends on model) holding the control display enclosure to the front panel.
Carefully make sure harness and USB cable passes through hole in front
panel.
3. Using a Phillips screw driver, remove the four M3 screws and carefully
remove board. Disconnect control harness and USB cable from board.
INSTALLATION
1. Position the board on four studs on control enclosure.
2. Secure the board to control enclosure with four 3M screw and tighten with
Phillips screw driver.
3. Connect harness and USB cable to control board. Install control enclosure
housing while carefully inserting harness and cable through the holes in the
front panel and securing with #10-32 screws.
4. Connect control harness to I/O board.
I/O BOARD
REMOVAL
1. Unplug all connectors.
2. Using a 5/26” socket, remove fout 6/32” lock nuts and remove the board
from four studs on the high voltage panel.
INSTALLATION
1. Position the board on four studs on the high voltage panel.
2. Install 6/32” lock nuts onto the studs and tighten in place using a 5/16”
socket.
3. Insert all jacks in the same connector locations as per removal. Press firmly
to make sure the jack is fully seated on the board.
STEAM RESERVOIR DRAIN VALVE
When the steam reservoir drain valve is de energized or (OPEN) the silicone hose
can freely slide through the valve housing. The steam reservoir drain valve is
located to the right of the steamer cavity.
REMOVAL
1. Turn off power and disconnect steamer from the branch circuit. Remove
right side panel. Let steamer drain completely.
2. Using spring clamp pliers, disconnect ONE END of the silicone drain hose by
loosening the drain hose clamp from the drain fitting coming from the cavity
drain. Remove clamp.
3. Unplug the valve electrical wires.
4. With a 5/16 inch nutdriver, remove the two 10-32 screws holding the drain
valve to the bracket steamer base.
5. Remove the two 10-32 screws and remove the valve from the bracket.
6. Loosen the clamp and remove the other end of the silicone hose from the
drain box. Inspect the hose for any damages or lime buildup. Clean or replace
the hose of required, then reattach to the steam reservoir drain fitting.
INSTALLATION
1. Attach new drain valve to valve bracket. Slide the silicone hose through the
drain valve housing and install hose clamp over the exposed end of the hose.
Check that the hose is straight and not twisted.
2. Fit the exposed end of the silicone hose onto the elbow of the cavity drain.
Using spring clamp pliers, position and tighten the hose clamp.
3. Plug the electrical leads of the valve into the wiring harness. Connect
steamer to branch circuit, and turn on power.
TESTING
Operate steamer and allow steam reservoir to fill. Check for leaks and observe if
drain valve fully closes. Turn off steamer and observe that drain valve opens and
the steam reservoir drains.
1. Reinstall right side panel.
DOOR REMOVAL/INSTALLATION/ALIGNMENT
For part number, see section on the steamer model parts list.
REMOVAL
1. To remove the door, turn off the steamer power and allow the steamer
to cool. Then open the door and, while supporting the weight of the door,
remove hinge pin or remove door-to-hinge bolts.
2. Place the door on a flat, clean table or similar support, with gasket facing up.
Be careful not to scratch door surface.
3. Inspect door gasket for signs of cuts, or other defects which may impair its
function. Replace if necessary.
NOTE
: Gasket not covered under terms of
warranty.
INSTALLATION
1. To install the door, apply NEVER-SEEZ lubricant to hinge pin. Align door
with hinge and insert hinge pin, or apply Loctite 242 to the door-to-hinge
bolts, then install door and mounting bolts. Snug bolts only, Do
NOT
tighten
mounting bolts at this time.
ALIGNMENT
1. Place a piece of masking tape over the door latch pin (bullet) hole in the door.
Содержание GSSP-BL-10G
Страница 13: ...13 SM GSSP BOILERLESS STEAMER Wiring Diagram Schematics GSSP BL 3E 5E 10E 888 994 7636...
Страница 14: ...14 SM GSSP BOILERLESS STEAMER Wiring Diagram Schematics GSSP BL 3G 5G 10G 888 994 7636...
Страница 15: ...15 SM GSSP BOILERLESS STEAMER Wiring Diagram Schematics GSSP BL I O BOARD 888 994 7636...
Страница 16: ...16 SM GSSP BOILERLESS STEAMER Wiring Diagram Schematics GSSP BL I O BOARD 888 994 7636...
Страница 17: ...17 SM GSSP BOILERLESS STEAMER Wiring Diagram Schematics GSSP BL I O BOARD 888 994 7636...
Страница 18: ...18 SM GSSP BOILERLESS STEAMER Wiring Diagram Schematics GSSP BL I O BOARD 888 994 7636...
Страница 19: ...19 SM GSSP BOILERLESS STEAMER Wiring Diagram Schematics GSSP BL I O BOARD 888 994 7636...
Страница 20: ...20 SM GSSP BOILERLESS STEAMER Wiring Diagram Schematics GSSP BL I O BOARD 888 994 7636...
Страница 21: ...21 SM GSSP BOILERLESS STEAMER Wiring Diagram Schematics GSSP BL I O BOARD 888 994 7636...
Страница 22: ...22 SM GSSP BOILERLESS STEAMER Wiring Diagram Schematics GSSP BL I O BOARD 888 994 7636...
Страница 34: ...34 SM GSSP BOILERLESS STEAMER Parts List GSSP BL 10E ELECTRIC CAVITY ASSEMBLY 178201...
Страница 35: ...35 SM GSSP BOILERLESS STEAMER Parts List GSSP BL 10E BASE CAVITY ASSEMBLY 178200...
Страница 36: ...36 SM GSSP BOILERLESS STEAMER Parts List GSSP BL 3G 5G 10G ELECTRICAL ASSEMBLY 178120...
Страница 37: ...37 SM GSSP BOILERLESS STEAMER Parts List GSSP BL 3E 5E ELECTRICAL ASSEMBLY 178110...
Страница 38: ...38 SM GSSP BOILERLESS STEAMER Parts List GSSP BL 10E ELECTRICAL ASSEMBLY 178864...
Страница 39: ...39 SM GSSP BOILERLESS STEAMER Parts List GSSP BL I O BOARD ASSEMBLY 178115...
Страница 40: ...40 SM GSSP BOILERLESS STEAMER Parts List GSSP BL 3G 5G HIGH VOLTAGE ELECTRICAL PANEL 178128...
Страница 41: ...41 SM GSSP BOILERLESS STEAMER Parts List GSSP BL 10G HIGH VOLTAGE ELECTRICAL PANEL 178963...
Страница 42: ...42 SM GSSP BOILERLESS STEAMER Parts List GSSP BL 3E 5E HIGH VOLTAGE ELECTRICAL PANEL 178126...
Страница 43: ...43 SM GSSP BOILERLESS STEAMER Parts List GSSP BL 3E 5E 480V HIGH VOLTAGE ELECTRICAL PANEL 178129...
Страница 44: ...44 SM GSSP BOILERLESS STEAMER Parts List GSSP BL 10E HIGH VOLTAGE ELECTRICAL PANEL 178127...
Страница 45: ...45 SM GSSP BOILERLESS STEAMER Parts List GSSP BL 10E 480V HIGH VOLTAGE ELECTRICAL PANEL 178962...
Страница 46: ...46 SM GSSP BOILERLESS STEAMER Parts List GSSP BL CONTROL PANEL ASSEMBLY 178119...
Страница 47: ...47 SM GSSP BOILERLESS STEAMER Parts List GSSP BL PLUMBING ASSEMBLY 178123...
Страница 48: ...48 SM GSSP BOILERLESS STEAMER Parts List GSSP BL 3G 5G 10G GAS SUPPLY PIPING ASSEMBLY 178122...