OM-DH
8
Each day confirm the jacket water
level by checking the water gauge.
When attaching the draw-off valve hand-
tighten the nut.
(For units with optional tangent draw-off). Assemble
the tangent draw-off by placing the large nut over the
draw-off valve and inserting it into the draw-off tube.
ONLY HAND-TIGHTEN THE NUT to complete
installation.
Now that the kettle has been installed, you should
test to ensure that it is operating correctly.
1.
Remove literature and packing materials from
inside and outside of the unit.
2.
If the unit is equipped with a draw-off valve
(product outlet), clean out any material which
might clog or damage the draw-off.
3.
Confirm that the tilting mechanism is operating
properly by tilting the kettle through its full range.
Then return the kettle to the upright position.
4.
Turn on the electrical service to the unit.
5.
Pour 1-2 quarts of water into the kettle.
6.
Following “To Start Kettle” instructions in the
“Operation” section (Page 9), begin heating the
water at the highest thermostat setting. The heat
indicator light should come on, and heating
should continue until the water boils.
If the unit functions as described it is ready for use. If
it does not function as described, contact your local
Groen Certified Service Agency.
Содержание DH-40
Страница 19: ...OM DH 19 Electrical Schematic...
Страница 24: ...OM DH 24 Burner and Flame Sensor Assembly Flue Stack Assembly Parts List...
Страница 26: ...OM DH 26 Arm and Module Box Assembly Electrical Panel Parts List...
Страница 31: ...31 NOTES...