Model G0879 (Mfd. Since 6/19)
-17-
Note: Steps in Installing/Changing Wire and
Adjusting Wire Feed Tension on Page 19 and
21 MUST be completed before Test Run.
To test run machine:
1. Clear all setup tools away from machine.
2. Ensure ON/OFF switch is in OFF position.
3. Make sure ground clamp is not connected to
any conductive material.
4. Connect machine to power supply and turn
machine
ON.
5. Point gun away from yourself, bystanders,
or any conductive material. Squeeze trigger
briefly to feed wire through gun.
6. Verify motor operation by slowly turning wire
feed speed dial. Squeeze trigger briefly to
verify that dial adjusts wire feed speed.
7. Cut excess wire off so stickout is approxi-
mately
1
⁄
4
".
8. Turn machine OFF and disconnect from
power.
Damage to your eyes and lungs could result
from using this machine without proper
protective gear. Always wear safety glasses,
welder's helmet, and a respirator when oper-
ating this welder.
Test Run
Once assembly is complete, test run the machine
to ensure it is properly connected to power and
safety components are functioning correctly.
If you find an unusual problem during the test run,
immediately stop the machine, disconnect it from
power, and fix the problem BEFORE operating the
machine again. The
Troubleshooting table in the
SERVICE section of this manual can help.
DO NOT start machine until all preceding
setup instructions have been performed.
Operating an improperly set up machine
may result in malfunction or unexpect-
ed results that can lead to serious injury,
death, or machine/property damage.
Serious injury or death can result from
using this machine BEFORE understanding
its controls and related safety information.
DO NOT operate, or allow others to operate,
machine until the information is understood.
The Test Run consists of verifying that the motor
powers up and runs correctly.
Содержание G0879
Страница 36: ......