background image

 

©Alcor 2011 All rights reserved 

OPERATION 

 

Before Operation 

 
 

Check to see that engine is serviced properly.  Read Honda operation and safety instructions.  Handle gasoline with extreme 
caution.  Make certain belt guards and blade guards are in place and secure and that there are no signs of damage or wear of 
these parts.  Never operate machine with damaged or missing guards.  Serious injury may otherwise result. 

 

 

Engine Start-Up Operation 

 

After  checking  the  planer  disc  and  blocks  (refer  to  the  planer  block  installation  section),  put  the  depth  control  in  the  idle 
position and make certain the control is set so that the blocks do not come in contact with the roof deck (see Fig. 3).  Pushing 
Down on the handles will allow the depth control to slide to the idle position. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
At this point, after you have read through all of the instructions, the Planer should be ready for operation. 
 
Position planer where work is to be done, start the engine and allow to warm up.  (Please refer to the engine manufacturer’s 
owner’s manual).  Depth adjustment must be set so that blocks do not come in contact with deck when set in idle position 
(Fig. 3).   
The throttle is located on the right hand side (Fig. 6).  To actuate choke, lever must be in fully contracted position (all the way 
down).  Push the throttle control slightly to find full throttle position, and pull farther up for lower speed settings.  To stop the 
engine, pull all the way up on control lever. 
 
 
 
 
 

Fig. 3  

Planer in idle position 

Содержание 350 000

Страница 1: ...PENDABLE SERVICE IF OPERATED ACCORDING TO INSTRUCTIONS THE MANUFACTURER PROVIDES THE FOLLOWING INSTRUCTIONS FOR USE AND CARE OF THIS EQUIPMENT AND RELIES UPON THE PURCHASER TO SEE TO IT THAT THESE INS...

Страница 2: ...THE HOIST 5 CONNECTING TO LIFT RINGS 5 SAFETY PRECAUTIONS 6 OPERATION 7 Before Operation 7 Engine Start Up Operation 7 The Controls 8 MAINTENANCE 9 Carbide Block Removal and Installation 9 Engine Serv...

Страница 3: ...te personnel it is mandatory that the instructions provided for the use and handling of the equipment be read and thoroughly understood by the operators CAUTION INTENDED USE THIS MACHINE IS INTENDED T...

Страница 4: ...dangerous and cause serious injury if it gets caught in moving mechanical parts Wear a long sleeved shirt buttoned at the cuffs safety shoes and pants without cuffs and knit wrist type gloves A hard h...

Страница 5: ...should be inspected for frayed cables bent frame members of faulty mechanical parts Make sure everyone on the ground is completely clear of the hoisting area Do not exceed the weight and size capacity...

Страница 6: ...ngine and allow cooling before refuelling Clean up gasoline before restarting Guard all openings on the roof Do not allow anyone to walk in front of the Planer Do not operate within 10 feet of roof ed...

Страница 7: ...do not come in contact with the roof deck see Fig 3 Pushing Down on the handles will allow the depth control to slide to the idle position At this point after you have read through all of the instruct...

Страница 8: ...iar with operation of this control before using planer on the job The throttle is located on the right hand side see Fig 6 To actuate choke lever must be in fully contracted position all the way down...

Страница 9: ...lting it WARNING NEVER TILT MACHINE TO EXPOSE DISC WHILE OPERATING SEVERE PERSONAL INJURY COULD OTHERWISE RESULT TO OPERATOR OR OTHERS ON THE JOB SITE SHUT MACHINE OFF WHEN NOT ATTENDED BY OPERATOR MA...

Страница 10: ...g may be required more frequently A high quality lithium based multi purpose grease is proper lubricant Use extreme care when pumping grease into bearing not to push too hard Destruction of bearing se...

Страница 11: ...in second and third degree burns They usually involve deeper portions of the skin and are easily infected An estimated 16 percent of all injuries are burns from hot stuff The major causes of burns ha...

Страница 12: ...all outlets on construction sites that are not part of the permanent wiring of the building This is actually a fast acting circuit breaker which can shut off electricity in a fraction of a second Alu...

Отзывы: