background image

 

©Alcor 2011 All rights reserved 

HOISTING TO ROOF  

 

WARNING; 

  

ALWAYS  CHECK  DECK  LOAD  LIMITS  WITH  BUILDER,  OWNER,  OR  ARCHITECT 
BEFORE DECIDING TO USE ON THE ROOF

INSPECT THE HOIST 

 
Make certain hoist is in safe operating condition, to be operated by trained personnel.  The hoist should be clear of ground 
objects  and  overhead  obstacles,  such  as  power  lines;  it  should  be  secure  and  properly  counterbalanced.  Hoist  should  be 
inspected for frayed cables, bent frame members of faulty mechanical parts.  Make sure everyone on the ground is completely 
clear of the hoisting area.  Do not exceed the weight and size capacity of your hoist. Do not use if you are in doubt. 
 

CONNECTING TO LIFT RINGS 

 

There is one centered lift ring on the machine (see Fig. 2)   Always lift machine by this ring using the proper hook and cable.  
Do not attempt to lift the machine by any other part.  Always inspect ring for wear or damage and make sure the hoist, cable, 
hook etc. are in good running order or damage or injury may result. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
WEIGHT: 

230 LBS  

 

 

 

 

Fig. 2 

Содержание 350 000

Страница 1: ...PENDABLE SERVICE IF OPERATED ACCORDING TO INSTRUCTIONS THE MANUFACTURER PROVIDES THE FOLLOWING INSTRUCTIONS FOR USE AND CARE OF THIS EQUIPMENT AND RELIES UPON THE PURCHASER TO SEE TO IT THAT THESE INS...

Страница 2: ...THE HOIST 5 CONNECTING TO LIFT RINGS 5 SAFETY PRECAUTIONS 6 OPERATION 7 Before Operation 7 Engine Start Up Operation 7 The Controls 8 MAINTENANCE 9 Carbide Block Removal and Installation 9 Engine Serv...

Страница 3: ...te personnel it is mandatory that the instructions provided for the use and handling of the equipment be read and thoroughly understood by the operators CAUTION INTENDED USE THIS MACHINE IS INTENDED T...

Страница 4: ...dangerous and cause serious injury if it gets caught in moving mechanical parts Wear a long sleeved shirt buttoned at the cuffs safety shoes and pants without cuffs and knit wrist type gloves A hard h...

Страница 5: ...should be inspected for frayed cables bent frame members of faulty mechanical parts Make sure everyone on the ground is completely clear of the hoisting area Do not exceed the weight and size capacity...

Страница 6: ...ngine and allow cooling before refuelling Clean up gasoline before restarting Guard all openings on the roof Do not allow anyone to walk in front of the Planer Do not operate within 10 feet of roof ed...

Страница 7: ...do not come in contact with the roof deck see Fig 3 Pushing Down on the handles will allow the depth control to slide to the idle position At this point after you have read through all of the instruct...

Страница 8: ...iar with operation of this control before using planer on the job The throttle is located on the right hand side see Fig 6 To actuate choke lever must be in fully contracted position all the way down...

Страница 9: ...lting it WARNING NEVER TILT MACHINE TO EXPOSE DISC WHILE OPERATING SEVERE PERSONAL INJURY COULD OTHERWISE RESULT TO OPERATOR OR OTHERS ON THE JOB SITE SHUT MACHINE OFF WHEN NOT ATTENDED BY OPERATOR MA...

Страница 10: ...g may be required more frequently A high quality lithium based multi purpose grease is proper lubricant Use extreme care when pumping grease into bearing not to push too hard Destruction of bearing se...

Страница 11: ...in second and third degree burns They usually involve deeper portions of the skin and are easily infected An estimated 16 percent of all injuries are burns from hot stuff The major causes of burns ha...

Страница 12: ...all outlets on construction sites that are not part of the permanent wiring of the building This is actually a fast acting circuit breaker which can shut off electricity in a fraction of a second Alu...

Отзывы: