Mechanical Installation
NOTICE:
This brewer should be installed by a
knowledgeable and experienced commercial
equipment installer.
Brewer Contents
Your brewer package should include the following:
1 Grind’n Brew (either single or dual bean)
1 Operation and Instruction Manual (this manual)
1 Hose to 1/4" flare fitting (part # 61237)
Tools Required for Installation
#2 Phillips screwdriver
9/16" wrench
5/8" wrench (or adjustable wrench)
6" level
Note: Other tools may be needed depending on the
type of water supply tubing and location.
1. Inspect unit to see if any damage occurred in
shipment.
2. Position brewer on counter. Place on sturdy
permanent counter top. If you have an airpot
brewer, install the 4" (10 cm) plastic legs (included)
at the bottom of the brewer. Lean the brewer
towards its side to expose screw holes underneath
for legs. Adjust the leg height to suit the size of
airpots you will use.
NOTICE:
Adjust the feet to level the brewer. With
bubble level, check to see that the brewer is level on
countertop.
Water Hook-up (Refer to Figure A)
NOTICE:
This equipment must be installed in
compliance with applicable Federal, State and/or Local
plumbing codes having jurisdiction. This product
requires an approved back flow prevention water
device, such as a double check valve, to be installed
between the machine and the water supply. Incoming
pressure should be greater than 20 psi and not more
than 100 psi.
1. The incoming water supply should have a shut-off
valve connected in-line. The end should have a
female 1/4" flare fitting. Water supply should be a
1/4" I.D. dedicated line branched off a 1" or larger
supply line.
2. Prior to installing the brewer, flush out the water
line by running approximately 1 gal. (3.8 L) of water
into a pail. This will ensure no sediment from a new
installation can get in the brewer.
3. Make sure your source water is turned off. Connect
the water line’s 1/4" female flare fitting (1) to the
1/4" male fitting on the hose connector (2).
4. Make sure Grind’n Brew is unplugged. Connect the
water line to the brewer with the hose connector
(2).
5. Turn the water valve on, sending water to the
brewer. If there are any leaks, tighten connections
to stop leakage.
Electrical Hook-up and Start-up Procedure (Refer
to Figure B)
NOTICE:
This equipment must be installed in
compliance with applicable Federal, State and/or Local
electrical codes having jurisdiction. Do not use
extension cords. Make sure that the outlet the brewer
plugs into is grounded.
Important:
Do not plug the unit in yet. Make
sure that the Main Power Switch in the back of
the unit is in the Off position before plugging in
the brewer.
1. Plug the brewer into an electrical outlet.
2. Make sure the brew basket is inserted in the brew
rails.
3. Reach to the back of the brewer and press the white
Main Power Switch to the On position. The front
control lights will go on, and water will enter the
brewer. The tank will fill in 2-3 minutes from the
moment the Main Power Switch is turned on.
4. Once the tank is full, it will take 10-15 minutes to
heat the water to the brewing temperature. Once
the Ready light is lit, you are ready to brew.
4
Grindmaster
®
Grind’n Brew
Installation
CAUTION
:
Lifting hazard. Single person lift
could cause injury. It is recommended that moving or
lifting the unit be done by two people to avoid injury.
NEMA 5-15P
Figure B
Figure A
Содержание GnB 10H
Страница 17: ...Grind n Brew Grindmaster 17 Parts Diagram and List continued Top Panel Assembly 0 1 2 1 3 4 4 ...
Страница 21: ...Grind n Brew Grindmaster 21 Parts Diagram and List continued Single Bean Upper Assembly ...
Страница 25: ...Grind n Brew Grindmaster 25 Wiring Diagram ...
Страница 26: ...26 Grindmaster Grind n Brew ...
Страница 27: ...Grind n Brew Grindmaster 27 ...