Grill'D Violet Long Скачать руководство пользователя страница 12

12

3.1.3. Safety distances

Figure 4, Table 2.

(A) -

 Distance from the heater connection to the ceiling.

(B) - 

Minimum safety distance to flammable materials on both sides of the heater,

 (C) -

 be-

hind and

 (D) - 

in front of it.

(E) - 

Distance to the walls made of non-combustible materials.

(F) - 

Distance to the walls made of non-combustible materials in the alcove.

The gap between the heater and the walls made of non-combustible materials (E, F) is nec-

essary for air circulation.

Table 2.

 Safety distances

A min.

B min.

C min.

D min.

E

F

1000

500

500

800

50

100

Note: dimensions are in millimeters.

3.2. 

Heater installation

IMPORTANT! Ensure proper floor levelling for the heater installation; possible slants of the 

heater and the chimney are precluded.

3.2.1. Stone chimney connection

The diameter of hole for connection to the chimney stack shall be about 20 mm larger than 

the diameter of the heating flue outlet pipe, so the optimum clearance around the pipe is 

about 10 mm.
If the designed pipe inlet to the stone chimney is at 90°, it is recommended to make the 

inner edges of the chimney stack bore round (Figure 5) in order to reduce the resistance for 

flue gas passage.

min 60 mm

A

B

min 60 mm

A

B

Figure 3

.

Sauna floor 
protection

min 60 mm

A

B

min 60 mm

A

B

min 60 mm

A

B

min 60 mm

A

B

A

B

min 60 mm

A

B

min 60 mm

A

B

Содержание Violet Long

Страница 1: ...ndow Max Violet Long Violet Steel Long Violet Long Window Max Violet Steel Long Window Max Compliance with this Manual guarantees excellent quality and maximum service life of the Grill D brand heater...

Страница 2: ...operation 7 2 7 Water in the sauna 8 2 8 Technical maintenance 8 2 9 Typical faults and troubleshooting methods 9 3 INSTALLATION MANUAL 10 3 1 Before installing the heater 10 3 2 Heater installation...

Страница 3: ...50 70 150 70 150 70 150 Stone size for outer stone heater mm 20 40 20 40 20 40 20 40 40 70 40 70 Maximum firewood length mm 320 320 320 320 390 390 Firewood diameter mm 80 150 80 150 80 150 80 150 80...

Страница 4: ...5 15 Consequently this room is equivalent for a sauna room with a volume of ap proximately 15 m3 2 OPERATION MANUAL Read this manual carefully before commencing installation and operating the heater K...

Страница 5: ...the grate into the ash drawer which allows convenient cleaning of the heater without interruption of burning The grate is one of the most thermally loaded parts of the heater it is fabricated of high...

Страница 6: ...el types dry wood fuel briquettes without artificial binder resins Recommended fuel types hardwood with a moisture content not more than 25 The moisture contained in the firewood has a significant imp...

Страница 7: ...mm It is necessary to constantly ensure sufficient draft while avoiding the development of excessive one that leads to heating of the firebox red hot which significantly reduces the heater service li...

Страница 8: ...ry three months Clean ing to be performed mechanically Use special devices tools and machines brush cleaner scraper sinker vacuum cleaner etc The selection of the necessary tools is made based on the...

Страница 9: ...ments Insufficient chimney draft Low quality or wet combustion material Blockage in the chimney or flue channels of the heater Troubleshooting methods Check that the heater capacity matches the size o...

Страница 10: ...k the correctness of chimney installation and or compliance with the manufac turer s requirements trust the installation and disassembly of the chimney only to qualified specialists 3 INSTALLATION MAN...

Страница 11: ...r can be installed on the floor without any special precautions if the concrete thickness is not less than 60 mm There shall be no electrical cables water supply and sew age pipes in the concrete unde...

Страница 12: ...ons are in millimeters 3 2 Heater installation IMPORTANT Ensure proper floor levelling for the heater installation possible slants of the heater and the chimney are precluded 3 2 1 Stone chimney conne...

Страница 13: ...ANT Familiarize yourself with the manufacturer s detailed instructions on the safe distances and installation of steel chimney elements as well as the water tank Some installation options are depicted...

Страница 14: ...14 Figure 5 Stone chimney connection Figure 6 Steel chimney connection...

Страница 15: ...eriod for the Product is 5 years it applies to the integrity of weld joints The warranty period for the entire Product is 1 year The warranty is valid from the date of pur chase of the Product by the...

Страница 16: ...IX 1 Heater dimensions Note dimensions are in millimeters 540 790 235 210 395 385 255 160 255 765 860 115 Violet Long Violet Long Pro Violet Steel Long Violet Steel Long Pro Violet Short Violet Short...

Страница 17: ...et Steel Long Window Max Violet Steel Long Window Max Pro Violet Short Window Max Violet Short Window Max Pro Violet Steel Short Window Max Violet Steel Short Window Max Pro 540 790 390 320 485 475 27...

Страница 18: ...l Long Window Max Violet World Steel Long Window Max Pro Violet World Short Window Max Violet World Short Window Max Pro Violet World Steel Short Window Max Violet World Steel Short Window Max Pro 605...

Страница 19: ...r flue outlet connection 3 Heating flue 4 Ash drawer 5 Thermal glass door Short Long 6 Thermal glass door Window Max 7 Lid of the inner stone heater 8 Filling funnel 9 Cleanout hole with cap 10 Shield...

Страница 20: ...20 APPENDIX 3 Internal design and operation of heaters Violet series Violet World series...

Страница 21: ...NT The works shall be carried out in an extremely careful way eliminating the possibility of damage to the paint coating Combustion chamber reinforcement Procedure refer to the figure below 1 Install...

Страница 22: ...the necessary depth while keeping the telescopic part at least 50 mm inside the fixed part 4 For Long Window Max heater version fasten the telescopic and the fixed parts to gether with roofing screws...

Страница 23: ...t application subsequent cleaning of surfaces should be carried out in accordance with the sealant application instruction Procedure 5 1 Apply the sealant from the rim side of the telescopic side alon...

Страница 24: ...ther 1 Choose the door opening direction and mount the door onto the seat The spacer shall be installed on the hole under the door 2 Fix the door in this position via the metal pin Stone lamellae The...

Страница 25: ...per part of the heater Stone heater lid Lamellae covering the stone heater 2 3 pieces in front of the lid need to be removed in order to access the lid The lid position is adjusted via two mounting sc...

Страница 26: ...g Heater firebox without shield pcs 1 1 1 1 1 1 Small lamellae covering the stone heater pcs 2 2 3 3 2 2 Big lamellae covering the stone heater pcs 9 9 8 8 6 6 Door Short Long pcs 1 1 Door Window Max...

Страница 27: ...27 Notes...

Страница 28: ..._________________________________________________________________ Name signature stamp Date of sale ________________________________________________________________ Date Seller s signature store stam...

Отзывы: