
Page 50
TTFM 6.1 Transit Time Flow Meter
8. Position the marked mylar back on the pipe, with the overlap marks on the center line of the
transducer bracket that will be rotated to the other side of the pipe. Be sure the mylar is parallel
with the face of the transducer. Use duct tape to hold the mylar together and to the pipe. While
the mylar is in this position, mark the opposite side of the pipe where the mylar is marked from
step 7:
Содержание TTFM 6.1
Страница 2: ...Note This page has been left blank intentionally ...
Страница 5: ...Page 5 TTFM 6 1 Transit Time Flow Meter 100 240 VAC Meter CONNECTIONS ...
Страница 27: ...Page 27 TTFM 6 1 Transit Time Flow Meter TYPICAL SENSOR INSTALLATION ...
Страница 53: ...Page 53 TTFM 6 1 Transit Time Flow Meter SENSOR MOUNTING COUPLING RECOMMENDATIONS ...