
Page 43
TTFM 6.1 Transit Time Flow Meter
2 OR 4 CROSS INSTALLATION OVERVIEW - TMK-B21 or TMK-B22 Kit (Cont.)
2. Install the spacer bar onto the right bracket as shown below:
3. Insert the spacer bar into the left bracket, and position the bracket at the separation distance
referenced earlier. Tighten the spacer bar clamp at this position:
Содержание TTFM 6.1
Страница 2: ...Note This page has been left blank intentionally ...
Страница 5: ...Page 5 TTFM 6 1 Transit Time Flow Meter 100 240 VAC Meter CONNECTIONS ...
Страница 27: ...Page 27 TTFM 6 1 Transit Time Flow Meter TYPICAL SENSOR INSTALLATION ...
Страница 53: ...Page 53 TTFM 6 1 Transit Time Flow Meter SENSOR MOUNTING COUPLING RECOMMENDATIONS ...