
Page 28
TTFM 6.1 Transit Time Flow Meter
Pipe Preparation and Bracket Mounting
Prepare an area 2" wide by 4" long (50mm x 100mm) for each sensor bonding by removing loose paint,
scale and rust. The objective of site preparation is to eliminate any discontinuity between the sensor and
the pipe wall, which would prevent acoustical coupling. A sanding block is included with every meter to
facilitate proper pipe preparation.
A Sensor Mounting Kit is supplied with each Greyline flow meter. It includes recommended coupling
compound and a stainless steel mounting bracket with adjustable pipe straps. Use the Alignment Bar
(included) to align sensor brackets for V and W mode mounting.
IMPORTANT:
The SE16-B transit-time transducers have arrows on the top of them. These should face
each other at installation.
Содержание TTFM 6.1
Страница 2: ...Note This page has been left blank intentionally ...
Страница 5: ...Page 5 TTFM 6 1 Transit Time Flow Meter 100 240 VAC Meter CONNECTIONS ...
Страница 27: ...Page 27 TTFM 6 1 Transit Time Flow Meter TYPICAL SENSOR INSTALLATION ...
Страница 53: ...Page 53 TTFM 6 1 Transit Time Flow Meter SENSOR MOUNTING COUPLING RECOMMENDATIONS ...