- 2 -
Thank you very much for purchasing our please keep and read this manual carefully
Packing List
No.
Name
Qty.
Remark
1
Installation & Operation Manual
1
2
Wire-controller
1
3
Wire controller box and sponge pad
(to be installed on the heat pump shell)
1
4
Drain pipe (2 m)
1
5
Drain-pipe connector
1
6
Rubber shock absorber
4
7
Heat Pump Unit
(The pipe connector has been installed on the unit
)
1
Содержание BYC-007TH1
Страница 20: ... 20 Figure 12 Electrical wiring diagram ...
Страница 25: ... 25 ...
Страница 27: ... 27 4 Timer Setting 4 1 Icon Definitions Multiple phase timer setting Timer ON OFF Time ...
Страница 40: ... 40 The phone needs to be connected to the network through the WIFI network Need to select Agree ...
Страница 52: ... 52 12 Fault analysis and elimination method ...