XG-Fan Powered Air Terminals Rev 2

8

Specific Electric Heater Troubleshooting Procedures 

(Cont.)

:

 Problem

  Cause

        Solution

Manual Safety Reset 

Switch is bad

1. 

Allow the duct temperature to cool down below 90º F.

2. 

If the heater still does not energize, perform the following.

3. 

On heaters with the manual safety reset switch connected in the 

backup contact circuit, jumper out the manual safety reset switch.

4. 

If the backup contractor now engages, contact the factory for a re-

placement manual safety reset switch.

5. 

If the backup contractor fails to engage, there is a problem in the 

backup contractor holding coil.

6. 

Use an ohmmeter to check continuity of the holding coil on the back-

up contractor.

7. 

If bad, contact factory for replacement backup contractor.

Insufficient air flow 

across the electric heat-

ing elements

1. 

Then minimum allowable air flow across the heating elements is 70 

CFM/kW.

2. 

Unless this recommended minimum air flow is met, the leaving air 

temperature of the heater will be greater than the safety reset switch-

es limits. This will cause nuisance tripping of the safety reset switch.

3. 

Reset the minimum air flow across the heating elements during a call 

for heat at 70 CFM/kW.

Warning: 

On all troubleshooting that requires working inside the heater casing, disconnect the power first!  

Jumpers used for diagnostic purposes should be removed before returning the heater to normal operation.

Содержание XG-BP

Страница 1: ...empting to assemble install operate or maintain the product described Protect yourself and others by observing all safety information Failure to comply with these instructions will result in voiding o...

Страница 2: ...ts 5 The XG Fan Powered Air Terminal should be suspended from the building structure in a horizontal plane with the bottom access panel facing down 5 Do not obstruct the bottom access panels or side m...

Страница 3: ...These clearances recommendations are not meant to preclude NEC requirements or local building codes that may be applicable which are the responsibility of the installing contractor Connecting Duct Wo...

Страница 4: ...s with Hot Water Coils Always inspect the hot water coils for damage prior to install ing the XG Fan Powered Air Terminal Caution The copper tubing should not be used as lift points The hot water coil...

Страница 5: ...ckwise to reduce the fan speed 8 Turn the SCR motor speed control clockwise to increase fan speed 9 Set the XG Fan Powered Air Terminal to full heating maxi mum induction 10 Adjust the downstream damp...

Страница 6: ...er assembly to hang from the power leads Fan Motor Removal from Blower 1 Loosen the blower wheel hub set screw to fan motor shaft 2 Remove the 3 screws holding motor leg brackets to blower housing 3 S...

Страница 7: ...ower supply wiring voltage are correct contact factory for further assistance Manual reset safety switch has tripped 1 Push the reset safety button on back of safety reset The manual safe ty reset is...

Страница 8: ...ng coil 6 Use an ohmmeter to check continuity of the holding coil on the back up contractor 7 If bad contact factory for replacement backup contractor Insufficient air flow across the electric heat in...

Страница 9: ...XG Fan Powered Air Terminals Rev 2 9 Figure 3...

Отзывы: