Open Plenum Array

4

1.  Carefully remove any crate and packing materials.
2.  Array ships from factory fully assembled unless width exceeds 12 feet. If greater 

than 12 ft wide, multiple sections are to be assembled at the job site. Lift each 
section into place and secure to one another.

3.  Leveling and Shimming
  Use slotted shim stock beneath the bottom array as 

needed. Spaces greater  
than 0.025 in. 

(0.635 mm)

 should be shimmed.

4.  Place the array onto the mounting structure using the 

recommended lifting points and hooking method as 
shown. Anchor frame to floor using all anchor points 
shown above. The array also requires anchoring to 
the walls and ceiling, see above illustration for details. 
(Anchoring material provided by installer).

5.  Wiring to be provided by others. All supply and/or signal wiring should be secured to the array structure.

CAUTION

When installing an array, ensure the proper protective devices are used to protect personnel from moving parts 
and other hazards. A complete line of protective accessories are available from the manufacturer.

Installation

Example of  

Shim Stock

Electrical Connections

Before electrical connections are made, the supply voltage, phase and ampere capacity must be checked for 
compatibility with the fan motor. In addition, the supply wiring must be properly fused and conform to local and 
national electrical codes. If the unit is supplied with a safety disconnect switch, ensure proper wiring to the fan 
motor. Be sure the disconnect is switched to the “OFF” position before connecting supply wires. If no disconnect 
is supplied, ensure the supply wire is not live before connection. Supply wires are then connected to the optional 
safety disconnect switch (if supplied) or motor.

Содержание OPA

Страница 1: ...ser le moteur refroidir avant toute maintenance ATTENTION Faire preuve de précaution dans les atmosphères explosives Only qualified personnel should install this array Personnel should have a clear understanding of these instructions and should be aware of general safety precautions Improper installation can result in electric shock possible injury due to coming in contact with moving parts as wel...

Страница 2: ...he array and accessories is indoors above grade in a low humidity atmosphere which is sealed to prevent the entry of blowing dust rain or snow Temperatures should be evenly maintained between 30 F 1 C and 110 F 43 C wide temperature swings may cause condensation and sweating of metal parts All accessories must be stored indoors in a clean dry atmosphere Remove any accumulations of dirt or debris a...

Страница 3: ...protect personnel Refer to local codes for requirements as to the number type and design Fully secure the wheel before performing any maintenance The wheel may start free wheeling even if all electrical power has been disconnected Before the initial start up or any restart check the following items to make sure that they are installed and secure Do not spin the wheel faster than the maximum catalo...

Страница 4: ... others All supply and or signal wiring should be secured to the array structure CAUTION When installing an array ensure the proper protective devices are used to protect personnel from moving parts and other hazards A complete line of protective accessories are available from the manufacturer Installation Example of Shim Stock Electrical Connections Before electrical connections are made the supp...

Страница 5: ...77 Taper Lock Bushing Installation Removal To Install Taper Lock Bushings 1 Clean shaft bore and outside of bushing and bore of hub taking bushings from hub if already assembled Remove any oil grease and dirt 2 Place hub onto shaft Slip bushing onto shaft and into hub Oil threads and points of setscrews or threads and under heads of capscrews DO NOT lubricate the hub bore or the outside of the bus...

Страница 6: ...rews and locking collars on the array bearings drive motor base and accessories for tightness 5 Rotate the wheel by hand and assure no parts are rubbing Remove any dirt or debris that may have accumulated during installation 6 Check all guarding if supplied for being securely attached and not interfering with rotating parts 7 Check all electrical connections for proper attachment 8 Check for obstr...

Страница 7: ...or at least bumped every thirty days It is preferred that each array is run as this causes all electrical and mechanical components to get up to temperature displacing any formed condensation redistributes load on bearings and redistributes grease in the bearings motor and shaft bearings CAUTION Always check the fan RPM when adjusting the operating frequency Do not exceed maximum class fan RPM of ...

Страница 8: ...el rubbing inlet Adjust wheel and or inlet cone Tighten wheel hub or bearing collars on shaft Wheel unbalance Clean all dirt off wheel Check wheel balance rebalance in place if necessary Low CFM Fan Check wheel for correct rotation Increase fan speed Duct system Check duct installations with poor inlet or discharge configurations High CFM Fan Decrease fan speed High Horsepower Fan Check rotation o...

Отзывы: