Open Plenum Array
4
1. Carefully remove any crate and packing materials.
2. Array ships from factory fully assembled unless width exceeds 12 feet. If greater
than 12 ft wide, multiple sections are to be assembled at the job site. Lift each
section into place and secure to one another.
3. Leveling and Shimming
Use slotted shim stock beneath the bottom array as
needed. Spaces greater
than 0.025 in.
(0.635 mm)
should be shimmed.
4. Place the array onto the mounting structure using the
recommended lifting points and hooking method as
shown. Anchor frame to floor using all anchor points
shown above. The array also requires anchoring to
the walls and ceiling, see above illustration for details.
(Anchoring material provided by installer).
5. Wiring to be provided by others. All supply and/or signal wiring should be secured to the array structure.
CAUTION
When installing an array, ensure the proper protective devices are used to protect personnel from moving parts
and other hazards. A complete line of protective accessories are available from the manufacturer.
Installation
Example of
Shim Stock
Electrical Connections
Before electrical connections are made, the supply voltage, phase and ampere capacity must be checked for
compatibility with the fan motor. In addition, the supply wiring must be properly fused and conform to local and
national electrical codes. If the unit is supplied with a safety disconnect switch, ensure proper wiring to the fan
motor. Be sure the disconnect is switched to the “OFF” position before connecting supply wires. If no disconnect
is supplied, ensure the supply wire is not live before connection. Supply wires are then connected to the optional
safety disconnect switch (if supplied) or motor.