background image

greenfan® bipolar ionizer Model 1600-01

 

© 2022 greenfan® inc. 

 
4.2 HVAC Fan Electrical Installation with 24VAC Transformer 

a)  Use multimeter to determine if 24VAC control signal wires are available. If yes go to 

step b. If no, go to step c. 

b)  For 24VAC HVAC systems, refer to 

Figure 7

. Loosen screws, insert wires (as 

shown), and tighten screws with all wires in place. Connect greenfan® bipolar 
ionizer blue wire to C terminal or to common wire of HVAC system. Connect black 
wire to fan G terminal or fan G wire of HVAC system. Connect white wire to heat W 
terminal or heat W wire of HVAC system. Skip to step d. 

c)  For HVAC systems without accessible 24VAC control signal wires, install 

120/208/240V to 24VAC Class 2 UL-listed transformer (Model 1601-01) shown in 

Figure 8

 and 

Figure 9

. Connect 120/208/240V common wire of transformer to 

120/208/240V common wire of HVAC system and connect greenfan® bipolar ionizer 
blue wire to one of 24VAC wires from transformer shown in 

Figure 9

. Connect 

greenfan® bipolar ionizer black wire to other 24VAC wire from transformer and 
connect appropriate wire from 120/208/240V transformer to 120/208/240V hot wire 
of fan. Transformer wire color may vary. Install wire nut to insulate white wire of 
greenfan® bipolar ionizer shown in 

Figure 9

d)  After completing all steps of mechanical and electrical installation for HVAC system 

proceed to HVAC fan verification of proper operation. 

 

Figure 7. Schematic of HVAC Fan Electrical Installation with 24VAC Transformer 

Содержание 1600-01

Страница 1: ...odel 1600 01 INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS Intertek Verified Zero Ozone Meets UL 2998 CARB Certified Certified to CSA C22 2 187 Conforms to UL 867 LAB TESTED US Patent 11173226 a...

Страница 2: ...Fan Verification of Proper Operation 7 5 0 AIR PURIFIER INSTALLATION 7 5 1 Air Purifier Mechanical Installation 7 5 2 Air Purifier Electrical Installation 7 5 3 Air Purifier Verification of Proper Ope...

Страница 3: ...e Weighted Average TWA ozone for this product is 0 0 parts per million by volume ppmv when tested in a 30 m3 chamber The product is CARB certified and meets the Intertek Sustainability Verified Zero O...

Страница 4: ...lar ionizer NOTICE The greenfan bipolar ionizer should only be installed and used as directed in this installation manual or the 2 page tri fold manual supplied with the product Please read the entire...

Страница 5: ...For air purifiers or ventilation fans disconnect power or unplug power cord before installation All field wiring must be in accordance with the National Electrical Code NEC or National Fire Protection...

Страница 6: ...polar ionizer installation at fan inlet of an HVAC system f Install bipolar ionizer on metal shroud and with at least one inch clearance between electrodes and metal surfaces Make sure screws do not i...

Страница 7: ...VAC control signal wires install 120 208 240V to 24VAC Class 2 UL listed transformer Model 1601 01 shown in Figure 8 and Figure 9 Connect 120 208 240V common wire of transformer to 120 208 240V common...

Страница 8: ...eenfan bipolar ionizer Model 1600 01 2022 greenfan inc 6 Figure 8 Bipolar ionizer installed with 120 208 240V to 24VAC transformer Figure 9 Installation schematic with 120 208 240V to 24VAC transforme...

Страница 9: ...hrough holes in flanges on either side of unit with at least one inch clearance between carbon fiber electrodes and metal surfaces to ensure airflow over both electrodes Install greenfan bipolar ioniz...

Страница 10: ...nergized or turned on e After completing all steps of the air purifier mechanical and electrical installation proceed to air purifier verification of proper operation 5 3 Air Purifier Verification of...

Страница 11: ...th fan rotation c After completing all steps of mechanical installation proceed to electrical installation Figure 12 Bipolar ionizer installed at inlet of ventilation fan behind protective grill 6 2 V...

Страница 12: ...usly illuminated when thermostat fan switch air purifier or fan is turned to the ON position then bipolar ionizer is operating properly The greenfan bipolar ionizer continuously monitors high voltage...

Страница 13: ...lity Verified Zero Ozone This product meets UL 2998 and does not emit more than 0 005 ppm as tested per UL 867 d CAUTION HIGH VOLTAGE This equipment should be inspected frequently and collected dirt r...

Страница 14: ...oduct at the time of original purchase and GREENFAN shall not be liable for any direct indirect consequential or incidental damages arising out of the use or inability to use the product An RMA is req...

Страница 15: ...5 x 104 TCID50 ml achieving a 97 6 reduction within 60 minutes 74 5 reduction within 30 minutes and 45 reduction within 15 minutes when installed on the inlet of a blower fan circulating air in a 20 x...

Отзывы:

Похожие инструкции для 1600-01