Содержание GT 120
Страница 3: ...2...
Страница 6: ...2 No Upward Slope...
Страница 8: ...2...
Страница 9: ...2 Pipe Basics...
Страница 10: ...2...
Страница 11: ...2 Connecting the hose to fittings The hose can be heated in hot water to make this easier Solvent Bonding...
Страница 12: ...2 Hose Connections...
Страница 14: ...2 The option below is for the side discharge pedestal option...
Страница 15: ...2 2 Connect water supply to pedestal keep water turned off until priming the system...
Страница 17: ...2 4 Install flush control panel and connect Ethernet cable from panel to pedestal...
Страница 19: ...2...
Страница 22: ...2...
Страница 25: ...2 12 Final checks before use priming of system...
Страница 26: ...2...
Страница 27: ...2...
Страница 32: ...2 Green Loo PO Box 2678 Burleigh BC QLD 4220 info greenloo org www greenloo org...