Safety
Page
15
of 82
The equipment must only be used as described in this user manual. If the
system is used in any other way not specified by Green Instruments A/S,
equipment safety may become impaired. Green Instruments A/S cannot be
held liable for any resulting damage or injury.
Hazardous voltage
Disconnect power before installing or servicing the equipment. Failure
to disconnect power can result in severe personal injury or damage to
materials. Read the installation instructions carefully to ensure all power and
signal leads have been correctly connected
Ensure that the correct supply voltage is connected to the system.
Circuit breaker
The installation must include a means of isolating electrical power by a
clearly marked external switch or circuit breaker. The external switch or
circuit breaker must be in close proximity to the system and within easy
reach of the operator.
Overload protection
In accordance with the safety requirements in IEC 61010-1 (2010), the
installation must include a means of overcurrent protection to provide
protection against excessive energy being drawn from the system power
supply if the equipment has a fault.
Protective earth
The system must be connected to protective earth.
Installation and fault finding
Risk of electrocution
Electrical installation and system fault finding may only be carried out by a
suitably trained and qualified engineer.
EMC
In accordance with the EMC product standard IEC 60533 (1999),
connection cables for the main power supply and communication signals
must be shielded or have equivalent protection.