Service Manual
Installation and Maintenance
39
Twist off screws fixing the electric box, pull
out compressor wires and overload wires,
remove wires of ambient temperature
sensor, external tube temperature sensor
and discharge temperature sensor, and
then pull the electric upwards to remove
it.
Procedure
Step
4. Remove top cover
6. Remove Cross Beam and Air Louver
5. Remove electric box 1
Remove the screws fixing top cover and
then remove the top cover.
Top cover sub-assy
Electric box 1 Screws
Cross Beam
Air Louver