39
D Series Modular Air-cooled Scroll Chillers
Service Manual
4. Remove
the bolts at
the base
ᑩᑻ㶎ᷧ
Bolts
ƹ
Remove bolts at the base with a wrench.
5. Remove
the
accumulator.
ƹ
Remove the accumulator
6. Purge
the system
by charging
nitrogen
Connect the accumulator
with the nitrogen tank
ƹ
Connect the pipeline of the accumulator
with the nitrogen tank and adhesive tape
can is allowed to be used for the large-
sized pipeline.
ƹ
Purge the system by charging nitrogen.
ТОО "Everest climate" г. Алматы, Варламова 1а, тел. +7 727 230 00 10, e-mail: [email protected], сайт: www.aircon.kz