7URXEOHVKRRWLQJ
Y
Y
Y
Y
Y
N
N
N
N
Start
Measure voltage at the
Test 10 position as
shown in the diagram
with a voltmeter
Value jumping
Measure voltage at the
Test 15 position as
shown in the diagram
with a voltmeter
Value jumping
Measure voltage at the
Test 11 position as
shown in the diagram
with a voltmeter
Value jumping
Measure voltage at the
Test 12 position as
shown in the diagram
with a voltmeter
Value jumping
The communication
circuit of the outdoor
unit is normal
End
Fault with
outdoor unit
Содержание GWH09MB-K3DNA3K/I
Страница 1: ...6HUYLFH 0DQXDO 02 0 1 0 1 5HIULJHUDQW 5 ASDGR09AYIRDC 1C ASDGR12AYIRDC 1C Service DICORE...
Страница 10: ...RQVWUXFWLRQ 9LHZV RQVWUXFWLRQ 9LHZV QGRRU 8QLW 2XWGRRU 8QLW 8QLW PP 320 776 510 714 257 286 540...
Страница 36: ...SORGHG 9LHZV DQG 3DUWV LVW 0 1 2 13 2 16 25 11 5 22 23 7 8 4 10 3 6 1 12 14 9 24 26 17 15 19 20 21 18...