![Gree GMV-PD100W/NAB-K Скачать руководство пользователя страница 61](http://html1.mh-extra.com/html/gree/gmv-pd100w-nab-k/gmv-pd100w-nab-k_service-manual_2260354061.webp)
57
DC Inverter Multi
VRF Service Manual
DPOUSPM
Fig.3 is about installation process of detection control board. The following items should be attended.
1. Installation must be performed by professionals. Either 220-240V or DC 5-24V is ok.
2. Cut off the power of heavy current wire covered in the mounting hole in the wall before installation.
Never perform the installation with electricity.
3. Press the bottom plate of the detection control board on the wall, and then make it and front panel of
detection control board together.
$WODVW¿[WKHERWWRPSODWHDQGIURQWSDQHORIGHWHFWLRQFRQWUROERDUGWRJHWKHUZLWKVFUHZ67;
7KHUHVKRXOGQ¶WEHDQ\ODUJHSRZHUHOHFWULFDSSOLDQFHDQG¿UPLQJEDVHQHDUE\WRDYRLGLQWHUIHUHQFH
source.
6. Avoid sunlight and rain and do not install it at wet space.
7. Do not install the unit at the place where there is corrosive gas, serious dust, salt fog and oil smoke or
which is specially wet.
7KHGHWHFWLRQFRQWUROERDUGPXVWEHLQVWDOOHGDWFRQFHDOHGSODFHDQGIDUIURPZDWHUDQG¿UH
Содержание GMV-PD100W/NAB-K
Страница 1: ...DCINVERTERMULTIVRF SERVICE MANUAL T1 R410A 50Hz GC201112 CENTRAL AIR CONDITIONERS...
Страница 5: ...1 DC Inverter Multi VRF Service Manual PRODUCT QSPEVDU...
Страница 11: ...7 DC Inverter Multi VRF Service Manual CONTROL DPOUSPM...
Страница 62: ...58 DC Inverter Multi VRF Service Manual INSTALLATION...
Страница 99: ...95 DC Inverter Multi VRF Service Manual MAINTENANCE...
Страница 118: ...114 DC Inverter Multi VRF Service Manual GMV Pd140W NaB M GMV Pd160W NaB M...
Страница 133: ...JF00300208...