![Gree FGR20Pd/DNa-X Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/gree/fgr20pd-dna-x/fgr20pd-dna-x_owners-manual_2260612011.webp)
Ducted Type Split Air-Conditioner Units(Inverter Series)
6
Unit:mm
Fig.6
2.3 Drainage Pipe Installation and Drainage System Testing
2.3.1 Notice for Installation of Drain Pipe
(1) The drainage pipe should be short and the gradient downwards should be
at least 1%~2% in order to drain condensation water smoothly.
(2) The diameter of drainage hose should be bigger or equal to the diameter
of drainage pipe joint.
(3) Install drainage pipe according to the following fig and arrange insulation
to the drainage pipe. Improper installation may lead to water leakage and
damp the furniture and other things in the room.
(4) You can buy normal hard PVC pipe used as the drainage pipe. During
connection, insert the end of PVC pipe into the drainage hole and then
tighten it with drainage hole and wire binder. Can’t connect the drainage
hole and drainage hole with glue.
(5) When the drainage pipelines are used for several units, the position of
pipeline should be about 100mm lower than the drainage port of each unit.
In this case, thicker pipes should be applied.
Содержание FGR20Pd/DNa-X
Страница 5: ...7 4 Maintenance after Seasonal Use 34 7 5 Parts Replacement 35 8 After sales Service 35...
Страница 41: ......