
Operational and Maintenance Manual G11 Series
9. INSTALLATION DO’S AND DON’TS
9.1 Do’s
1.
Install the engine on horizontal, hard area.
This area should be properly ventilated. It
should have access to maintenance areas.
2.
All the mounting structure should properly
rest on the ground.
3.
Check with civil engineers and architects
before mounting the engine on slabs,
beams, raised structures, above ground
floor, etc.
4.
Check fire hazard possibility near fuel, oil
storage.
5.
Plan release direction of the exhaust.
6.
Judge engine size properly. Seek help
from Greaves service dealers or area
offices for this purpose.
7.
Provide adequate safety measures around
installation area.
9.2 Don’ts
1.
Never install the engine on inclined
surface.
2.
Remember that a good installation reduces
running cost, maintenance cost, provides
reliable and safe service.
4
4