2018-07-24
401-312M
3PYP
Operating Instructions
22
Monitor Operation
The monitor system includes two cab components:
IntelliAg
®
seed monitor console, and
IntelliAg
®
clutch-folding module (switch panel)
Switch panel operations are described in this section.
Monitor console operation is described in a separate
manual supplied with your 3PYP. Operations covered in
that manual (and therefore not in this manual) include:
Raising/Lowering Planter
Refer to Figure 17
(which depicts the planter both raised and unfolded)
Planter raising relies on the 3-point hitch in front, and the
Lift Assist cylinders in back. To raise or lower the planter,
move the levers for
both
the Lift circuit and the 3-point
hitch.
Great Plains recommends this sequence (to prevent
lateral dragging of wing components):
•
in Raising, operate the
planter
Lift circuit first, and
•
in Lowering, operate the
hitch
circuit first.
The planter may be raised or lowered in either the folded
or unfolded configuration.
The lift assist circuit may also include the optional down
pressure system. This system engages and disengages
automatically.
•
hydraulic drive control
(option)
•
setting rate limits and
detecting out-of-limits
•
seed rate calibration
•
GPS integration
•
planting rate
•
fan rpm
•
fertilizer rate
Marker Fold
Marker Tilt
FRAME
Wing Fold
Right
CLUTCH
Center
Left
MASTER
Figure 16
Monitor Console & Panel
25421
25246
1
2
Machine Damage Risk:
Do not raise or lower while any planter folding operations are
underway or partially complete.
Machine Damage Risk:
Always raise planter for reverse/backing operations.
Figure 17
Planter Raised
29192
Содержание Yield-Pro 3PYP
Страница 188: ...Cover Table of Contents Cover Table of Contents ...
Страница 189: ...Table of Contents Index Table of Contents Index ...
Страница 190: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402 ...