![GREAT PLAINS NTA3007HD Скачать руководство пользователя страница 71](http://html.mh-extra.com/html/great-plains/nta3007hd/nta3007hd_operators-manual_2259471071.webp)
NTA907HD and NTA3007HD
Operating Instructions
Great Plains
| 166-207M | 02/26/2019
65
6.
Deploy auger (page 49).
7.
Swing inlet hopper under rear meter.
(see page 64 for additional steps if unloading front
hopper)
8.
Position collection bin or vehicle under auger outlet.
9.
Install the calibration crank (page 56).
10. Open (front) Calibration door
. A small amount of
seed may fall into auger inlet hopper.
Do not open (rear) Clean-Out Door
before auger
is operating, or material may flow in large volume and
overflow auger inlet hopper.
11. Check that auger controls are at center/off.
Figure 71
Unload Rear Hopper with Auger
29409
RE-IMPORT
AS ISO#
32393
Figure 72
Open Calibration Door
26401
Содержание NTA3007HD
Страница 2: ...Great Plains 166 207M 02 26 2019 Table of Contents Index ii 166 207M Table of Contents Index ...
Страница 4: ...2SF24 and 2SF30 ...
Страница 177: ...Table of Contents Index Table of Contents Index ...
Страница 178: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402 Table of Contents Index ...