VERTICAL POWER STRIP MOUNTING

For your convenience, we have provided mounting brackets in the 

left rear and right rear corners of the GL480E and GL600E cabinets 

for mounting the 7218-24 power strips vertically. Typically any power 

strip shipped with an cabinet will be installed at the manufacturer. To 

install a power strip in the field, remove the top power strip bracket by 

loosening the #10-32 x 1/2" lg. screw that secures the bracket to the 

frame. Slide the power strip into the lower power strip bracket. 

Re-attach the top power strip bracket to secure the power strip. 

Note: GL300E cabinet comes with 7219 powerstrip for 19" mounting.

MOUNTING RAILS

The vertical mounting rails 

(2 pair - 12 Ga. steel) come 

installed with all standard 

Great Lakes cabinets at 

19" EIA spacing; universal 

mounting (3/8" sq. hole); 

310-E compliant. The rails 

can be adjusted front 

to rear by loosening the 

1/4"-20 hex nut and sliding 

to desired location then 

retighten the hex nut (7/16" wrench or socket).

POWER

When using power distribution units (PDUs), each PDU should 

be connected to a committed branch circuit that is rated for the 

continuous load of all the equipment connected. When not using a 

PDU, each piece of equipment should be connected to a dedicated 

branch circuit.

VERTICAL POWER STRIP MOUNTING

Mounting 

bracket 

Qty.- 2 per 

power strip

Power strip

#10-32 x 1/2" 

lg.Phillips pan head 

screw Qty.- 2 per 

power strip

Содержание GL300E-2432

Страница 1: ...the following Great Lakes cabinets GL300E 2432 GL480E 2432 GL600E 2432 GL300E GL480E and GL600E E Cabinets Installation Instructions UL60950 1 UL2416 E Series Equipment Cabinet Rack 1 866 879 4522 Gr...

Страница 2: ...the E cabinet could result in equipment damage serious injury or possible death Only trained service personnel should be used to remove the cabinet from the pallet Also be sure you have a sufficient n...

Страница 3: ...nd M6 screws This user s manual This user s manual applies to the following GL cabinets Part No H W D RMU Weight Cap GL300E 2432 30 24 32 13 300 lbs GL480E 2432 48 24 32 24 600 lbs GL600E 2432 60 24 3...

Страница 4: ...nets before installation Sudden stops and starts excessive force obstructed routes and uneven floor surfaces may cause the cabinet to topple over Loading Equipment WARNING Only install equipment after...

Страница 5: ...cept the same key The swing handles and doors are reversible The exploded view shows its construction DOOR REMOVAL AND ATTACHMENT Open the door beyond 90o grasp the door with both hands and carefully...

Страница 6: ...NGE MOUNTING SIDE PANEL REMOVAL The side panels are secured to the cabinet frame with two quick release latches and a keyed lock Be sure to unlock the side panel To remove the side panel squeeze the q...

Страница 7: ...adjust the leveling glide down Note If you want to use casters AND leveling glides you will need 4 levelers ANCHOR MOUNTING THRU HOLE The middle 687 dia thru holes are for securing the cabinet to the...

Страница 8: ...BOTTOM PANELS There are several styles of bottom panels available solid is shown Styles must be ordered separately All styles mount to all cabinets The bottom panels have a foam gasket to ensure a po...

Страница 9: ...0E cabinet comes with 7219 powerstrip for 19 mounting MOUNTING RAILS The vertical mounting rails 2 pair 12 Ga steel come installed with all standard Great Lakes cabinets at 19 EIA spacing universal mo...

Страница 10: ...it Ground Connect the dedicated branch circuit ground connector to the main protective grounding stud located inside at the bottom rear of the cabinet frame using a listed ring or closed loop terminal...

Страница 11: ...horseshoe knockouts TPE 24P Perforated top panel with 2 4 horseshoe knockouts STATIONARY SHELVES FOR 19 MOUNTING Part No Description 7206 FR AHD Front rear mount adjustable 17 50 W x 22 25 D 7206 FR...

Страница 12: ...FORM MS 5 02 27 REV 2 ETSI Associate Member ISO 9001 2015 Registered ISO 9000 2015 Thank you for your business...

Отзывы: