Great Lakes Case & Cabinet 4PBK12 Скачать руководство пользователя страница 14

CMR-45U CABLE MANAGEMENT RACK
TOOLS

9/16" socket or wrench

ASSEMBLY 

1. 

Install front cross-brace and front horizontal width bracket

 

A.

 Lay Upright Channels on edge and open sides of the channel to 

 

face each other.

 

B.

 Locate thru holes at the top of the channel; align Cross Brace  

 

Waterfall Edge behind the top holes (for 19" mounting, use outer  

 

set of holes; for 23" mounting, use inner set of holes). Install (2)  

 

3/8" Hex Head Bolts, (4) 3/8" External Tooth Lock Washers, and  

 

(2) 3/8" Hex Nuts on each channel, 

FINGER TIGHTEN. 

 

C. 

Locate thru holes at the bottom of the channel; align Horizontal  

 

Width Bracket in front of the bottom holes. Install (2) 3/8" Hex  

 

Head Bolts, (4) 3/8" External Tooth Lock Washers, and (2) 3/8"  

 

Hex Nuts on each channel, 

FINGER TIGHTEN.

2. 

Install rear horizontal width bracket and rear cross-brace

 

A.

 

 

Locate thru holes at the bottom of the channel; align 

 

Horizontal Width Bracket in front of the bottom holes. Install (2)  

 

3/8" Hex Head Bolts, (4) 3/8" External Tooth Lock Washers, and  

 

(2) 3/8" Hex Nuts on each channel, 

FINGER TIGHTEN.

 

B.

 Locate horizontal slots  on the front Cross Brace. Install Center  

 

Waterfall Bracket to the Cross Brace with (1) #12-24 Screw. Install  

 

second Center Waterfall Bracket in the same way.

 

C. 

Locate thru holes at the top of the channel; align Cross Brace  

 

behind the top thru holes. Install (2) 3/8" Hex Head Bolts, (4) 3/8"  

 

External Tooth Lock Washers, and (2) 3/8" Hex Nuts on each  

 channel, 

FINGER TIGHTEN. 

 

D.

 Return to the Center Waterfall Brackets. Fully attach each   

 

bracket by using (1) #12-24 Screw through the rear cross brace.

3.

 

Final tightening

 

A.

 Stand rack upright. Screws will self square the rack, verify with  

 

square. Tighten all screws using a 9/16" socket or wrench (24 ft-lb  

 

torque is recommended).

4.

 

Installing cable rings

 

A.

 Align the pins on the rear of the cable rings in any of the 16  

 

mounting locations per upright channel and use one #12-24 Pan 

 

Head Screw. 

5. 

When mounting to a cement floor, recommended mounting    

   hardware is Great Lakes Seismic Anchor Kit (AK101). For other  

 

floor construction, the installer must provide appropriate hardware.

14

Содержание 4PBK12

Страница 1: ...PART NUMBER QTY PER UNIT MATERIAL TYPE MATERIAL GAUGE FINISH Use of this document is subject to a confidentiality and nondisclosure agreement with Great Lakes Case Cabinet Co Inc GLCC and may not be...

Страница 2: ...operation and maintenance of the racks WARNING Failure to follow directions in the warning could result in injury to persons or loss of life BEFORE ASSEMBLY PLEASE SEE PAGE 27 FOR SAFTEY CONSIDERATION...

Страница 3: ...FICATIONS Dimensions 84 H x 20 31 W x 24 36 D Rack Spaces 45 RMU Certifications UL Listed Construction VD4PM6 2436 and VD4P1224 2436 Vertical Uprights 12 ga steel Cross Members 14 ga steel Extension B...

Страница 4: ...s the left and right side of the rack Follow the drawing to be sure that corresponding cross members are with the correct extension bars Top Rear Cross Member Left Variable Depth Side Rails Right Vari...

Страница 5: ...CKED APP TITLE DRAWING NOT TO SCALE PART NUMBER QTY PER UNIT 1 MATERIAL TYPE MATERIAL GAUGE FINISH GREAT LAKES CASE CABINET CO INC P O BOX 551 EDINBORO PA 16412 PHONE 814 734 7303 FAX 814 734 3907 E M...

Страница 6: ...1 2 13 x 1 lg Hex Cap Screw Vertical Upright Bottom Width Bracket Shown Toe Out Mounting 1 2 13 Hex Nut 1 2 13 x 1 lg Hex Cap Screw DETAIL A TOP BRACKET RAILS WITH M6 MOUNTING DETAIL B BOTTOM BRACKET...

Страница 7: ...Vertical Uprights Rail Type 3 8 sq M6 mounting Total Max Load Capacity 2000 lbs 7 What s Included Component Qty Vertical Uprights 2 left 2 right 4 Rack Mounting Hardware 50 Width Brackets 4 Rack Asse...

Страница 8: ...ASSEMBLY 1 The variable depth side rails are assembled by snapping together a cross member piece and extension bar Cross members and extension bars are specific to the top and bottom as well as the l...

Страница 9: ...to a confidentiality and nondisclosure agreement with Great Lakes Case Cabinet Co Inc GLCC and may not be reproduced disclosed or utilized in whole or in part without prior written authorization from...

Страница 10: ...he GLCC label on top using 3 8 16 x 3 4 flat head screws Align the uprights so that the 1 on the RMU labels is toward the bottom DO NOT TIGHTEN 3 8 16 x 3 4 lg Flat Head T45 Screws 1 2 13 Hex Nut Vari...

Страница 11: ...nstruction CMR 45U16 Upright Channels 11 ga steel Width Brackets 12 ga steel Cross Brace Waterfall Edge 12 ga steel Center Waterfall Bracket 16 ga steel CMR 45U Upright Channels 12 ga steel Width Brac...

Страница 12: ...ht Channels Install 8 3 8 16 x 3 4 lg T45 screws FINGER TIGHTEN B Install Center Waterfall Brackets 2 to the Cross Brace with 1 12 24 Pan Head Screw per bracket thru the slots in the cross brace Must...

Страница 13: ...Management Fingers Upright Channel Cross brace Waterfall Edge 3 8 16 x 3 4 lg Flat Head Screws T45 12 24 Pan Head Screw Cross brace Waterfall Edge Center Waterfall Bracket Cable Management Fingers 12...

Страница 14: ...ead Bolts 4 3 8 External Tooth Lock Washers and 2 3 8 Hex Nuts on each channel FINGER TIGHTEN B Locate horizontal slots on the front Cross Brace Install Center Waterfall Bracket to the Cross Brace wit...

Страница 15: ...Head Bolt Cable Ring 12 24 Pan Head Screw Upright Channel Horizontal Width Bracket Cross Brace Waterfall Edge 3 8 16 Hex Nut Center Waterfall Bracket 15 12 24 Pan Head Screw 3 8 16 x 1 lg Hex Head Bo...

Страница 16: ...224 2436 and VD4PHD 2436 Racks and the Center Waterfall Bracket on the CMR 45U and CMR 45U16 If these parts need to be bonded to the protective earthing terminal do so in accordance with Article 250 o...

Страница 17: ...ine the required spacing needed between racks Assemble the brackets by inserting the square tab into the correct hole of the opposite bracket push the brackets together so that the tab is inserted fir...

Страница 18: ...e baffle to fit the next rack as shown in Detail B 3 Attach the other side of the baffle to the next rack by inserting six 12 24 x lg pan head screws Tighten the hex nuts OPTIONAL 4 Along the left and...

Страница 19: ...the variable brackets normally the same depth as the end of row rack Set the brackets at the required depth and secure together by using two 10 32 nuts and washers 2 Bolt the variable depth brackets t...

Страница 20: ...he flange of the side panels should be against the inside of the support frame Use 4 push button rivets to secure each flange to the support frame as shown in Detail B 3 Align the outer panel with the...

Страница 21: ...the PDU and position of buttons on the PDU should be taken into consideration when installing the brackets A B C A B C PDU Bracket 12 24 Pan Head Screw Detail A Option 1 Outside Rail Detail C Option...

Страница 22: ...N INCHES DIMENSIONAL LIMITS APPLY AFTER APPLICATION OF FINISH INTERPRET DRAWING PER ASME Y14 5M 1994 THIRD ANGLE PROJECTION PCS I020760 EST WEIGHT 246 81 lbmass A REVISION HISTORY REV DESCRIPTION DATE...

Страница 23: ...en 2 racks racks will need spaced at 14 apart Attach the manager to the racks using 12 24 hardware supplied with rack 3 After cable manager is attached go back and tighten all hardware Detail B Top Le...

Страница 24: ...i top does not need attached to base Detail A 2 Attach the bracket to the top of the rack as shown in Detail B FINGER TIGHTEN 3 Attach ladder rack to brackets as shown in Detail C 4 Tighten all hardwa...

Страница 25: ...P TITLE DRAWING NOT TO SCALE PART NUMBER QTY PER UNIT 1 MATERIAL TYPE MATERIAL GAUGE FINISH GREAT LAKES CASE CABINET CO INC P O BOX 551 EDINBORO PA 16412 PHONE 814 734 7303 FAX 814 734 3907 E MAIL glc...

Страница 26: ...ct to a confidentiality and nondisclosure agreement with Great Lakes Case Cabinet Co Inc GLCC and may not be reproduced disclosed or utilized in whole or in part without prior written authorization fr...

Страница 27: ...heaviest equipment first at the bottom of the ER Rack and load the lighter units at the top Only UL Listed ITE Information Technology Equipment units should be installed inside the rack Be sure to rea...

Страница 28: ...FORM MS 5 02 31 REV 3 ETSI Associate Member Thank you for your business...

Отзывы: