20
Introduction
Rack Mount
6 Reinstall control cards, crosspoint cards, I/O cards, I/O backplanes, monitor cards, and moni-
tor backplanes. Be sure to install them in the correct location. The router was configured at
the factory with the cards in a specific location. If you install I/O cards in a different location,
the router will have to be reconfigured before it can run properly.
7 If you are using NV8300 power supplies, perform the following steps:
a If the NV8300 was shipped with the PS8300 power supply modules in the frame, remove
the modules.
b Lift the power supply frame into position and attach the power supply frame to the front
of the rack with the appropriate screws. Place screws in all frame mounting screw holes.
c Repeat steps
a
and
b
for additional power supply frames.
8 Re-mount the front door.
9 Wait until you have completed all installation tasks before you reinstall PS8300 power supply
modules, powering up the router. (See
Connecting to Power
on page 126.)
CAUTION
Do not re-insert the PS8300 power supply modules until after you have made all
power connections. For more information, see
Connecting to Power
on
page 126.
Содержание NV8500 Series
Страница 1: ...NV8500 Series Hybrid Digital Video Audio Routers User s Guide UG0034 09 30 Oct 2014 ...
Страница 8: ...viii ...
Страница 16: ...xvi Table of Contents ...
Страница 124: ...108 Expanded NV8576 Plus Connecting the NV8576 Plus Frames ...
Страница 134: ...118 Alarms Making Alarm Connections ...
Страница 150: ...134 Power Connecting to Power ...
Страница 161: ...145 NV8500 Series User s Guide Network Page Time Page ...
Страница 204: ...188 M3 Cards M3 Cable and Connectors ...
Страница 216: ...200 Maintenance Obtaining Service ...
Страница 228: ...212 IP Gateway Specifications ...
Страница 236: ...220 Frame Expansion ...
Страница 246: ......