133
NV8500 Series
User’s Guide
Validating Your Installation
When your installation is complete, perform the following checks to make sure the router and
power supplies are operating properly:
Check that all 5 green power LEDs on the front of each PS8100 or PS8300 power supply module
are lit. If any or all LEDs are off:
•
Verify that the PS8100 or PS8300 power supply module is fully seated in its slot.
•
Test for +48 volts at each of the 5 test points at the front of the power supply module.
Содержание NV8500 Series
Страница 1: ...NV8500 Series Hybrid Digital Video Audio Routers User s Guide UG0034 09 30 Oct 2014 ...
Страница 8: ...viii ...
Страница 16: ...xvi Table of Contents ...
Страница 124: ...108 Expanded NV8576 Plus Connecting the NV8576 Plus Frames ...
Страница 134: ...118 Alarms Making Alarm Connections ...
Страница 150: ...134 Power Connecting to Power ...
Страница 161: ...145 NV8500 Series User s Guide Network Page Time Page ...
Страница 204: ...188 M3 Cards M3 Cable and Connectors ...
Страница 216: ...200 Maintenance Obtaining Service ...
Страница 228: ...212 IP Gateway Specifications ...
Страница 236: ...220 Frame Expansion ...
Страница 246: ......