14
Creative Grading Camera Control System User’s Guide (v1.4)
Chapter 2 - Installation
Tap OK. The Settings page opens. Go to the IP address and enter the IP settings you copied or
noted from the CCS-ONE.
2.4 Installing the CGP Creative Grading Panel
2.4.1 Connecting power
Follow these steps to install a panel for first-time use:
•
Attach the Ethernet cable to the Ethernet connector on the back side of the CGP and
connect it to the Ethernet switch (make sure it is connected to the
C2IP
Ethernet port of
the CCS-ONE).
•
If the Ethernet network is not powered connect power to the panel.
2.4.2 Setting up the network
•
After applying power to the CGP wait a few seconds for the panel to start up. The Creative
Grading logo is shown on the display during the start-up procedure.
•
The CGP’s IP configuration mode is set to AutoIP mode by default and it automatically
connects to the CCS-ONE server.
•
Check if the panel is connected to the network.
IP address
Содержание Creative Grading
Страница 1: ...13 00088 000 August 2020 v1 4 Creative Grading User s Guide Camera Control System ...
Страница 8: ...8 Creative Grading Camera Control System User s Guide v1 4 ...
Страница 20: ...20 Creative Grading Camera Control System User s Guide v1 4 Chapter 3 Setup ...
Страница 38: ...38 Creative Grading Camera Control System User s Guide v1 4 Chapter 4 CGA Operation ...
Страница 54: ...54 Creative Grading Camera Control System User s Guide v1 4 Chapter 6 Reference tables ...
Страница 64: ...64 Creative Grading Camera Control System User s Guide v1 4 Chapter 7 Specifications ...
Страница 65: ...Creative Grading Camera Control System User s Guide v1 4 65 ...
Страница 66: ...Copyright Grass Valley Canada ...