Section 3: Installation

The Grant External Volumiser is supplied with two connections – 

one inlet and one outlet. Refer to Figure 2-1.
Each connection is identified on the volumiser casing with an 

arrow to indicate which is the inlet and outlet. These connections 

are 28mm compression. 

GENERAL

In all cases the FLOW connection on the back of the heat pump 

is connected to the INLET connection on the top of the external 

volumiser, via one of the two flexible hoses supplied with the heat 

pump.

The OUTLET connection on the top of the external volumiser is 

connected to the flow pipe of the heating system. 
One of the two isolating valves, supplied with the heat pump, 

should be fitted externally, in the system flow pipe. Refer to Figure 

3-7.
The heating system return pipe is connected to the RETURN 

connection on the back of the heat pump via the second of the 

two flexible hoses supplied with the heat pump. 
The second of the two isolating valves, supplied with the heat 

pump, should be fitted externally in the system return pipe. Refer 

to Figure 3-7.
The actual means of connection between the heat pump, the 

external volumiser and the system is slightly different, depending 

on which size of heat pump the volumiser is connected to. 
Refer to the following details for the model of heat pump being 

fitted:

3.7.1  AERONA³ HPID6R32 HEAT PUMP

As the INLET on the top of the external volumiser is higher than 

the flow connection on the back of the HPID6R32 heat pump, an 

elbow with an integral manual vent must be fitted to the volumiser 

inlet to allow the volumiser to be vented of any air. Refer to 

Figure 3-8 for the connection arrangement.
For details of the pipe and fittings required to make the connection 

between the heat pump and external volumiser refer to Figure 

3-9.

Return from system

Flow to system

Figure 3-8:

 External volumiser connection to HPID6R32 heat 

pump

1

2

3

4

5

6

7

8

9

10

7

3

Figure 3-9:

 External volumiser connection to HPID6R32 heat 

pump (exploded image)

Table 3-2: 

Key to Figure 3-9

Item

Description

Source

1

External volumiser

N/A

2

Volumiser inlet connection - 

28mm compression

Supplied on 

Volumiser

3

Compression reducing set - 

28mm x 22mm

Supplied with heat 

pump

4

Copper pipe 22mm - length to suit

Supplied by installer

5

Elbow c/w manual air vent - 

22mm compression

Supplied with heat 

pump

6

Copper pipe 22mm - length to suit

Supplied by installer

7

Flexible hose - 

¾” BSP x 22mm c/w washer

Supplied with heat 

pump

8

Heat pump flow connection - ¾” BSP

N/A

9

Volumiser outlet connection - 

28mm compression

Supplied on 

Volumiser

10

Heat pump return connection - 

¾” BSP

N/A

Содержание Aerona3 HPID10R32

Страница 1: ...UK DOC 0183 Rev 1 0 November 2022 Grant External Volumiser Installation Instructions...

Страница 2: ...e Grant External Volumiser SPECIAL TEXT FORMATS The following special text formats are used in these instructions for the purposes listed below WARNING Warning of possible human injury as a consequenc...

Страница 3: ...5 Unpacking 6 3 6 Installation procedure 6 3 7 System connections 7 4 ELECTRICAL 11 4 1 General 11 4 2 Electrical connections 11 4 3 Immersion heater 12 5 OPERATION 14 5 1 General 14 5 2 Aerona heat p...

Страница 4: ...External Volumiser to the heat pump The 3kW electric immersion element is supplied factory fitted and located inside a removable panel at the right hand side of the volumiser viewed from the front It...

Страница 5: ...coated Insulation Mineral wool Immersion Heater Make Cotherm TSR Output kW 3 Electrical supply 230V 50Hz 1ph 2 1 TECHNICAL SPECIFICATION 2 TECHNICAL DATA 2 2 DIMENSIONS Figure 2 1 Grant External Volu...

Страница 6: ...the heat pump and the front face of the external volumiser If the rear face of the volumiser is 50mm from the wall this will leave a distance of approximately 400mm between the wall and the back of t...

Страница 7: ...re the heat pump feet to the AV mounts The gap between the rear of the heat pump and the front of the External Volumiser should be approximately 100mm Refer to Figure 3 6 If not then slacken the four...

Страница 8: ...ize of heat pump the volumiser is connected to Refer to the following details for the model of heat pump being fitted 3 7 1 AERONA HPID6R32 HEAT PUMP As the INLET on the top of the external volumiser...

Страница 9: ...3 4 5 6 7 8 6 9 Figure 3 11 External volumiser connection to HPID10R32 heat pump exploded image Table 3 3 Key to Figure 3 11 Item Description Source 1 External volumiser N A 2 Volumiser inlet connecti...

Страница 10: ...with heat pump 8 Heat pump flow connection 1 BSP N A 9 Volumiser outlet connection 28mm compression Supplied on Volumiser 10 Heat pump return connection 1 BSP N A Figure 3 13 External volumiser conne...

Страница 11: ...he supplementary immersion heater uses a dedicated power supply from a correctly sized circuit breaker in the consumer unit The final supply connection must be made from a weatherproof lockable isolat...

Страница 12: ...for external volumiser connection diagram 4 3 IMMERSION HEATER The Grant External Volumiser is supplied factory fitted with a pre wired 3kW Cotherm Type TSR immersion heater WARNING The immersion hea...

Страница 13: ...level or slightly above the surface of the housing To reset the over temperature cut out Isolate the volumiser immersion element from the mains electrical supply Wait for the temperature in the volum...

Страница 14: ...tting menus via the heat pump remote controller refer to Aerona installation instructions Section 9 3 Set the parameters as detailed in the table below Table 5 1 Aerona heat pump parameter settings fo...

Страница 15: ...e Industrial Estate Swindon SN5 8YG Telephone 44 0 1380 736920 Fax 44 0 1380 736991 Email info grantuk com Website www grantuk com Product 30Ltr EXTERNAL VOLUMISER C W 3KW BACKUP HEATER Model HPIDVOL3...

Страница 16: ...artment on 44 0 1380 736920 who will arrange for a competent service engineer to rectify the fault Remember before you contact Grant Engineering UK Limited Ensure the External Volumiser has been insta...

Страница 17: ...Limited must be informed of the new owner s details The Company will endeavour to provide prompt service in the unlikely event of a problem occurring but cannot be held responsible for any consequence...

Страница 18: ...Page 18 Notes NOTES...

Страница 19: ...Notes Page 19 NOTES...

Страница 20: ...GRANT ENGINEERING UK LIMITED Frankland Road Blagrove Industrial Estate Swindon SN5 8YG Tel 44 0 1380 736920 Fax 44 0 1380 736991 Email info grantuk com www grantuk com...

Отзывы: