background image

Section 3: Installation

Page 7

! NOTE !

If the backup immersion heater is to be used ensure that 

the two semi-pierced knockouts are removed BEFORE the 

external volumiser is fitted and piped up to the heat pump.

3.  Fit the external volumiser onto the AV mounts, ensuring that 

the flow and return connections are facing upwards and the 

removable cover is at the right-hand end of the volumiser 

when facing the heat pump from the front. 

Refer to Figure 3-4.

Figure 3-4:

 Locating volumiser on mounting brackets

Figure 3-5:

 Volumiser mounting brackets

4. 

Ensure that the base of the External Volumiser is correctly 

located between the two upward facing flanges on both of the 

mounting brackets. Refer to Figure 3-5.

5.  Position the Aerona³ heat pump on the AV mounts, with the 

front feet at the end of the metal channel of the mounts. 

Tighten the four fixing screws to secure the heat pump feet to 

the AV mounts. 

The gap between the rear of the heat pump and the front 

of the External Volumiser should be approximately 100mm. 

Refer to Figure 3-6.
If not, then slacken the four screws securing the heat pump 

to the AV mounts and adjust its position to achieve approx. 

100mm. Then ensure that the four screws are re-tightened to 

secure the heat pump to the AV mounts.

Figure 3-6:

 Distance between heat pump and volumiser

(HPID13R32 shown)

3.7 

SYSTEM CONNECTIONS

The Grant External Volumiser is designed to be installed in the 

flow from the heat pump. It must not be installed in the return from 

the system. Refer to Figure 3-7.

Figure 3-7:

 Typical diagram showing position and connection of 

external volumiser

Table 3-1: 

Key to Figure 3-7

Item

Description

1

Aerona³ ASHP (HPID10R32 shown)

2

Flexible hose

3

Isolation valve

4

Grant external volumiser

5

Anti-vibration mounts

Upward facing

flanges

3

2

3

1

4

Item Description

Aerona³ ASHP (HPID10R32 shown)

Flexible hose

Isolation valve

Grant External Volumiser

Anti-Vibration Mounts

2

5

Содержание Aerona3 HPID10R32

Страница 1: ...UK DOC 0183 Rev 1 0 November 2022 Grant External Volumiser Installation Instructions...

Страница 2: ...e Grant External Volumiser SPECIAL TEXT FORMATS The following special text formats are used in these instructions for the purposes listed below WARNING Warning of possible human injury as a consequenc...

Страница 3: ...5 Unpacking 6 3 6 Installation procedure 6 3 7 System connections 7 4 ELECTRICAL 11 4 1 General 11 4 2 Electrical connections 11 4 3 Immersion heater 12 5 OPERATION 14 5 1 General 14 5 2 Aerona heat p...

Страница 4: ...External Volumiser to the heat pump The 3kW electric immersion element is supplied factory fitted and located inside a removable panel at the right hand side of the volumiser viewed from the front It...

Страница 5: ...coated Insulation Mineral wool Immersion Heater Make Cotherm TSR Output kW 3 Electrical supply 230V 50Hz 1ph 2 1 TECHNICAL SPECIFICATION 2 TECHNICAL DATA 2 2 DIMENSIONS Figure 2 1 Grant External Volu...

Страница 6: ...the heat pump and the front face of the external volumiser If the rear face of the volumiser is 50mm from the wall this will leave a distance of approximately 400mm between the wall and the back of t...

Страница 7: ...re the heat pump feet to the AV mounts The gap between the rear of the heat pump and the front of the External Volumiser should be approximately 100mm Refer to Figure 3 6 If not then slacken the four...

Страница 8: ...ize of heat pump the volumiser is connected to Refer to the following details for the model of heat pump being fitted 3 7 1 AERONA HPID6R32 HEAT PUMP As the INLET on the top of the external volumiser...

Страница 9: ...3 4 5 6 7 8 6 9 Figure 3 11 External volumiser connection to HPID10R32 heat pump exploded image Table 3 3 Key to Figure 3 11 Item Description Source 1 External volumiser N A 2 Volumiser inlet connecti...

Страница 10: ...with heat pump 8 Heat pump flow connection 1 BSP N A 9 Volumiser outlet connection 28mm compression Supplied on Volumiser 10 Heat pump return connection 1 BSP N A Figure 3 13 External volumiser conne...

Страница 11: ...he supplementary immersion heater uses a dedicated power supply from a correctly sized circuit breaker in the consumer unit The final supply connection must be made from a weatherproof lockable isolat...

Страница 12: ...for external volumiser connection diagram 4 3 IMMERSION HEATER The Grant External Volumiser is supplied factory fitted with a pre wired 3kW Cotherm Type TSR immersion heater WARNING The immersion hea...

Страница 13: ...level or slightly above the surface of the housing To reset the over temperature cut out Isolate the volumiser immersion element from the mains electrical supply Wait for the temperature in the volum...

Страница 14: ...tting menus via the heat pump remote controller refer to Aerona installation instructions Section 9 3 Set the parameters as detailed in the table below Table 5 1 Aerona heat pump parameter settings fo...

Страница 15: ...e Industrial Estate Swindon SN5 8YG Telephone 44 0 1380 736920 Fax 44 0 1380 736991 Email info grantuk com Website www grantuk com Product 30Ltr EXTERNAL VOLUMISER C W 3KW BACKUP HEATER Model HPIDVOL3...

Страница 16: ...artment on 44 0 1380 736920 who will arrange for a competent service engineer to rectify the fault Remember before you contact Grant Engineering UK Limited Ensure the External Volumiser has been insta...

Страница 17: ...Limited must be informed of the new owner s details The Company will endeavour to provide prompt service in the unlikely event of a problem occurring but cannot be held responsible for any consequence...

Страница 18: ...Page 18 Notes NOTES...

Страница 19: ...Notes Page 19 NOTES...

Страница 20: ...GRANT ENGINEERING UK LIMITED Frankland Road Blagrove Industrial Estate Swindon SN5 8YG Tel 44 0 1380 736920 Fax 44 0 1380 736991 Email info grantuk com www grantuk com...

Отзывы: