background image

9

7.Please ensure the hexagon surface of nut and inside surface of casing are at the same level (figure 16); stay the 

pressing piece on the nut (figure 17-18)

8.  Insert the external infrared receiver to EXT IR hole

figure 18

,

infrared receiver must be ready for control, then install the power box back to bracket .

(note: ensure the power box is buttoned on the hanger of bracket) (figure 19).

because of the recessed mount, the external 

Figure16

Figure18

Figure17

Two surfaces are 
at the same level

Figure

18

EXT CTRL

   

(

)

Dry 

Contact/RS232

EXT IR(

)

External 

Infrared Receiver

TRIG(

)

Trigger

Figure

19

Figure15

M12 Screw

Wrench 

Not provided
(screwdriver 
can replace)

Align the ornament 
board with ceiling

Figure13

Figure14

Wrench 

Bracket

Button

Note: the power box must be 
buttoned on the hanger of bracket.

Power Box

Screw

6

Figure22

Figure23

Figure24

Note: the upward instruction shows us installation of external control system, if the users want to 

add other control systems, please follow the steps as below:

1)Loose the screws of power box and take out the power 

box (because the power cord has a limit, 

please do not draw it strongly). Then loose two rubber 

screws again, and remove the end cap 

(please ensure the power line is fixed), step 3 can be follow.

2)Insert the control system signal line to corresponding 

output (figure 11), and take out the signal 

line from control system signal line exit (figure 18).

3)Reinstall the end cap after completed control system 

and fasten the two rubber screws then 

reinstall the power box and fasten two screws according 

to step 4.

Figure19

Signal Line Exit

Unlocked

Locked

6. Fix the screen using M12 nut, then fasten the nut by wrench (accessories) (figure 13-14); until the ornament 

board align the ceiling (figure 15) and connect the power.

Power line

M5 Screw 

Pressing Piece 

1) Insert the baffle to top groove.

2) Stay flat the baffle, 
and clip it to low groove.

3) Press the baffle slightly 
and align it with ceiling board.

Figure20

Figure21

10. Install the front baffle as following steps

1)  Extend the screen and keep the rear baffle opening

2)  Disconnect the power of screen

and then install the front baffle

3

Please ensure the security lock is unlocked (figure  22).

4

Install the front bafle (figure 23)

5

Unlock the security lock of baffle (figure 24

figure 25), insert the 

plug of security to a hole of end cap (figure 26), if the baffle can not 

move up that please align baffle with ceiling board.

6

Connect the power after installation

Top Groove

Low Groove

Ensure two faces 
are the same level

Содержание Cyber Series

Страница 1: ...anual Power line disconnection Screen responds nothing to any operation B1 B2 H W A B3 L 170 170 Reason Solution GRANDVIEW REPRODUCING GENUINE COLORS Thank you for purchasing a Grandview projection screen Before use please read instructions carefully After installation store instructions for future reference B1 B2 B3 32 6 35 8 35 9 39 9 40 4 44 8 32 2 35 6 33 0 36 4 35 5 39 5 37 4 41 4 38 8 43 0 4...

Страница 2: ...about power line device interface power plug please contact the professional people 11 After installation please locate a power device in order to disconnect power or connect the power plug to electrical socket This electrical socket should be installed to a convenient position If the accident occurs during operation please disconnect power or take out the power plug 12 The ceiling or wall used fo...

Страница 3: ...ile operating too much retracting will cause the damages of screen and motor E Synchro Power Relay optional After connecting the Wireless Synchr o Conver ter the screen can be controlled by FM modulation wireless controller which can cooperate with Sychro Power Relay and switch of projector to control the up and down of screen synchronously D External Wall Switch optional The wall switch is availa...

Страница 4: ...tallation 1 Turn the controller around push to open the cover as guide arrow 2 Put the battery in according to the guide of cathode anode 3 Close the cover 二 External Control System Four control systems are available for motorized screen 1 Manual Control 2 Infrared Remote Control IR 3 Dry Contact 4 Switch EXT CTRL TRIG EXT IR Trigger Dry Contact RS232 External Infrared Receiver B Infrared Remote C...

Страница 5: ...gur e 5 TRIG Trigger EXT IR External Infrared Receiver EXT CTRL Dry Contact RS232 Figur e 10 Signal Output Switch M4 Screw Note the power box must be buttoned on the hanger of bracket Bracket Power Box End Cap Board Figur e 11 Four Hangi ng Boar ds are in middl e 100 H L 94 minus H 100 minus 180 100 Figur e6 Power Line Figur e7 Figur e8 Figur e9 11 Controller Buttons Function Instruction 1 Press b...

Страница 6: ...ith ceiling board 6 Connect the power after installation figure 24 figure 25 Figure21 Signal Line Exit Figure22 Figure24 Figure25 Figure26 Figure23 5 Please stay the screen in the opposite direction and fix the left and right hanging board on the screen using M6 screw and nut figure 12 6 Install the whole screen on the hanging bracket figure 13 14 7 Fix the screen using M12 nut figure 15 then adju...

Страница 7: ...in and remove the end cap please ensure the power line is fixed step 3 can be follow 2 Insert the control system signal line to corresponding output figure 11 and take out the signal line from control system signal line exit figure 18 3 Reinstall the end cap after completed control system and fasten the two rubber screws then reinstall the power box and fasten two screws according to step 4 Figure...

Страница 8: ...line cover of end cap and then fill in the power line Afterward stuck the line cover back to end cap then install the power line outside the casing figure 9 5 Please complete the installation of end cap and fasten two rubber screws do not need to install the power box at this moment 5 Install the whole screen on the hanging bracket figure 11 12 Figur e 4 Figur e 5 Figure9 Figure7 Figure8 Figure6 F...

Отзывы: