P a g e
|
146
GWN7000 User Manual
Version 1.0.6.28
Figure 92: Create New Schedule
2-
Select the periods on each day that will be included on the schedule and enter a name for the schedule
(ex: office hours).
3-
Users can choose to set weekly schedule or absolute schedule (for specific days for example), and if
both weekly schedule and absolute schedules are configured on the same day then the absolute
schedule will take effect and the weekly program will be cancelled for that specific date.
4-
Once the schedule periods are selected, click on
Save
to save the schedule.
The list of created schedules will be displayed as shown on the figure below. With the possibility to edit or
delete each schedule: