background image

 6

PRE-PLANNING YOUR GREENHOUSE PLACEMENT

Pre-Plan The Placement Of Your Structure: 

The best placement depends on the features of your property, it is suggested in 

most scenarios to have your greenhouse face South on its broadest side and to have the door face East or West depending on 

typical wind directions in your area. Do not worry if your orientation will not allow for the suggested placement, as a greenhouse 

that is facing North is better than having no greenhouse at all. 
Avoid building your greenhouse at the base of a slope as these are often frost pockets where cold air collects, this will not be 

good for your greenhouse in keeping the temperature up inside.
Allow enough room to get a wheel barrow in and around your structure. Be sure you have adequate room around the exterior 

sides and rear of your greenhouse for maintenance of your property and the structure.

Drainage: 

Be sure the orientation will allow for proper drainage in and around your greenhouse. 

Sunlight and Wind Protection: 

It is recommended that you place your greenhouse in an area of your property that receives the 

most sunlight but is also somewhat protected by trees, fencing or your home for wind protection. The more direct sunlight will 

keep the temperatures up during early spring and late fall. Typically the goal is to get at least 6 hours of sunlight daily throughout 

the year.

Extreme Wind Conditions:

 If you live in a windy location there is no way to build a 100% storm safe greenhouse, but there are a 

number of things you can do to minimize the chance of damage. Ensure that the base is level and square, be sure all panels are 

secured in place and that all aluminum extrusions are tight. The main problem is usually that wind gets into the greenhouse and 

the pressure pushes a panel out and then the force of the wind on the interior causes more damage. It is best if you are expecting 

an extreme weather event that you disable any auto roof vents and make sure all doors and windows are closed and locked shut. 

Also you may need to build a wind break for extreme condition areas where wind is constant and extreme. 

Utilities:

 It is ideal for your greenhouse to have water, electricity and even gas plumbed into place before construction. This will 

make watering plants and keeping temperatures and air circulation to the max efficiency.  

You will need to choose an anchoring system prior to installation, see our website for options: 

www.GrandioGreenhouses.com or call 1-866-448-8231
For Cement Base Installation:

 You will use Tapcon® style screws to secure your Flat Mount Base Kit to the concrete surface.

For Deck Base Installation:

 You will use wood screws to secure your Flat Mount Base Kit to the wood surface.

For Earth Installation:

 

You will use the Grandio Summit Steel Base Kit with the BA-A1 / L-BOLT anchoring system. With this 

method you will dig holes, place the L-Bolts into the ground and secure into place with quickrete.

* YOUR CHOSEN ANCHOR KIT OPTION SHOULD BE FOUND IN YOUR WELCOME KIT OR ACCESSORY BOX.

Содержание GRA-BASE-S128

Страница 1: ...LATION WARNINGS CHOOSING YOUR SURFACE BASE KIT ASSEMBLY INSTRUCTIONS SECURING BASE KIT TO SURFACE FOR ALL SIZES WARRANTY G R E E N H O U S E S GRANDIO 2018 Grandio Greenhouses Backyard Living Source I...

Страница 2: ...lacement BASE KIT PARTS LISTS quick reference for base kit assemblies CHAPTER 1 12x8 Greenhouse Dimensions Base Kit Installation Instructions CHAPTER 2 12x12 Greenhouse Dimensions Base Kit Installatio...

Страница 3: ...andio Greenhouse will be covered on your policy Call your local utilities companies before digging Do not attempt to begin construction on a windy day plan to complete assembly in one day Damage cause...

Страница 4: ...we recommend marking a small x on a corner of each panel to determine which side has the UV Coating as you cannot visually determine with your eye in the case of future disassembly Due to shipping th...

Страница 5: ...aying all of your boxes out as shown on the graphic below for an organized assembly Locate your greenhouse size and situate your boxes near your assembly site as shown in the order listed below Invent...

Страница 6: ...ive in a windy location there is no way to build a 100 storm safe greenhouse but there are a number of things you can do to minimize the chance of damage Ensure that the base is level and square be su...

Страница 7: ...FM 4 EXTENSION RIGHT 93 7 16 in 2374 mm FM 8 EXTENSION LEFT 93 7 16 in 2374 mm FM 8 EXTENSION RIGHT 11 3 16 300 mm 609 CONNECTOR ALLEN FLANGED SCREW 6 8 FM BASE CORNER GUARD 100MM CORNER PIECE FOR AL...

Страница 8: ...AGE BOLT 6 10 FLANGED NUT MID BRACKET FOR BASE 5 7 16 in 138 mm END BRACKET FOR BASE 3 15 16 in 100 mm 12 EARTH ANCHOR 1 2 x 3 4 COMBOS FOR ATTACHING FLAT MOUNT TO THE STEEL BASE 0 2 2 2 0 52 52 2 4 1...

Страница 9: ...94 25 L Door Dimensions 41 5 W x 85 25 H Bottom Side of Gutter Height 57 H Peak Roof Height 111 H 12x8 Grandio Summit with Steel Base Kit Dimensions The Steel Base Kit is sold separately from the Summ...

Страница 10: ...hen attach the Flat Mount Kit onto your Steel Base Kit The Flat Mount Kit will be assembled as shown in this section then secured to the surface of your choice using the proper anchoring hardware You...

Страница 11: ...oors to be located Be sure the pieces are laid out exactly like the diagram note that notches will have a 23 gap between each other no notches should be right next to each other except at the corners...

Страница 12: ...BS 610 screws with the SQ NUT 6 nuts at the 1C corners See diagrams and 12B 14 12A FRONT EXTERIOR VIEW CONNECTION OF 14 PARTS WITH SCREWS AFS 68 FRONT 12A 12B GRANDIO SUMMIT 12x8 FLAT MOUNT BASE ASSEM...

Страница 13: ...instructions that come with your anchoring kit Drill the holes into your surface blow out the debris then install the screws Keep the Left side 12C and the Right side 12C in place with the anchors in...

Страница 14: ...is not included purchase at a local hardware store The side sections of the Flat Mount Base Kit will attach on top of the Steel Base Kit prior to earth install the front and back walls must be assembl...

Страница 15: ...shown in the diagram below failure to assemble exactly as shown will cause problems later in assembly 2 Con rm that the small oval holes are all on the top side of the base kit and the large round ho...

Страница 16: ...610 ML01 CB 610 ML01 3 Use the CB 610 bolts with the ML01 nuts to assemble the steel base kit as shown in diagrams and at the bottom of this page Note the CB 610 s will be on the outside and the ML01...

Страница 17: ...ghten the hardware using the W16 10 mm Wrench and W17 Allen Driver Set aside the Front and Back sections of the Flat Mount Base these sections will be required to assemble the front and back walls in...

Страница 18: ...then mark the ground where the BA A1 L Bolts will reside with a marking paint You will then move base aside in order to dig out the holes 2 Dig out the holes for the BA A1 anchors then con rm the base...

Страница 19: ...Door Dimensions 41 5 W x 85 25 H Bottom Side of Gutter Height 57 H Peak Roof Height 111 H 12x12 Grandio Summit with Steel Base Kit Dimensions The Steel Base Kit is sold separately from the Summit Gree...

Страница 20: ...ch the Flat Mount Kit onto your Steel Base Kit The Flat Mount Kit will be assembled as shown in this section then secured to the surface of your choice using the proper anchoring hardware You will dri...

Страница 21: ...ve a 23 gap between each other no notches should be right next to each other except at the corners See and to con rm you have the correct orientation prior to assembly Note The 12D and 12E pro les may...

Страница 22: ...AFS 68 screws see diagram 6 Assemble the base kit as shown using the ABS 610 screws with the SQ NUT 6 nuts at the 1C corners See diagrams and 12B 14 12A FRONT EXTERIOR VIEW CONNECTION OF 14 PARTS WIT...

Страница 23: ...th your anchoring kit Drill the holes into your surface blow out the debris then install the screws Keep the Left side 12C and 12D and the Right side 12C and 12E in place with the anchors installed an...

Страница 24: ...purchase at a local hardware store The side sections of the Flat Mount Base Kit will attach on top of the Steel Base Kit prior to earth install the front and back walls must be assembled using the fro...

Страница 25: ...as shown in the diagram below failure to assemble exactly as shown will cause problems later in assembly 2 Con rm that the small oval holes are all on the top side of the base kit and the large round...

Страница 26: ...10 ML01 CB 610 ML01 3 Use the CB 610 bolts with the ML01 nuts to assemble the steel base kit as shown in diagrams and at the bottom of this page Note the CB 610 s will be on the outside and the ML01 n...

Страница 27: ...ide the Front and Back sections of the Flat Mount Base these sections will be required to assemble the front and back walls in Manual 2 Note The 12D and 12E pro les may be labeled incorrectly on this...

Страница 28: ...e aside in order to dig out the holes 2 Dig out the holes for the BA A1 anchors then con rm the base is square and level again with the base kit moved back into place and BA A1 s in their respective h...

Страница 29: ...el Base Kit is sold separately from the Summit Greenhouse Kit and is designed to be installed directly into the Earth using the included L Bolts which must be secured into Quikrete or a similar concre...

Страница 30: ...ttach the Flat Mount Kit onto your Steel Base Kit The Flat Mount Kit will be assembled as shown in this section then secured to the surface of your choice using the proper anchoring hardware You will...

Страница 31: ...eces are laid out exactly like the diagram note that notches will have a 23 gap between each other no notches should be right next to each other except at the corners See and to con rm you have the co...

Страница 32: ...AFS 68 screws see diagram 6 Assemble the base kit as shown using the ABS 610 screws with the SQ NUT 6 nuts at the 1C corners See diagrams and 12B 14 12A FRONT EXTERIOR VIEW CONNECTION OF 14 PARTS WIT...

Страница 33: ...th your anchoring kit Drill the holes into your surface blow out the debris then install the screws Keep the Left side 12C and 12F and the Right side 12C and 12G in place with the anchors installed an...

Страница 34: ...Quikrete or a similar concrete material NOTE concrete is not included purchase at a local hardware store The side sections of the Flat Mount Base Kit will attach on top of the Steel Base Kit prior to...

Страница 35: ...Kit exactly as shown in the diagram below failure to assemble exactly as shown will cause problems later in assembly 2 Con rm that the small oval holes are all on the top side of the base kit and the...

Страница 36: ...10 ML01 CB 610 ML01 3 Use the CB 610 bolts with the ML01 nuts to assemble the steel base kit as shown in diagrams and at the bottom of this page Note the CB 610 s will be on the outside and the ML01 n...

Страница 37: ...the hardware using the W16 10 mm Wrench and W17 Allen Driver Set aside the Front and Back sections of the Flat Mount Base these sections will be required to assemble the front and back walls in Manua...

Страница 38: ...2 Dig out the holes for the BA A1 anchors then con rm the base is square and level again with the base kit moved back into place and BA A1 s in their respective holes Check with your local building c...

Страница 39: ...rom the Summit Greenhouse Kit and is designed to be installed directly into the Earth using the included L Bolts which must be secured into Quikrete or a similar concrete material The Flat Mount Base...

Страница 40: ...ttach the Flat Mount Kit onto your Steel Base Kit The Flat Mount Kit will be assembled as shown in this section then secured to the surface of your choice using the proper anchoring hardware You will...

Страница 41: ...ill have a 23 gap between each other no notches should be right next to each other except at the corners See and to con rm you have the correct orientation prior to assembly Note The 12D and 12E pro l...

Страница 42: ...AFS 68 screws see diagram Repeat connecting the 12F with the 12D 6 Assemble the base kit as shown using the ABS 610 screws with the SQ NUT 6 nuts at the 1C corners See diagrams and 12B 14 12A FRONT E...

Страница 43: ...our anchoring kit Drill the holes into your surface blow out the debris then install the screws Keep the Left side 12C 12F and 12D and the Right side 12C 12G and 12E in place with the anchors installe...

Страница 44: ...rchase at a local hardware store The side sections of the Flat Mount Base Kit will attach on top of the Steel Base Kit prior to earth install the front and back walls must be assembled using the front...

Страница 45: ...e Kit exactly as shown in the diagram below failure to assemble exactly as shown will cause problems later in assembly 2 Con rm that the small oval holes are all on the top side of the base kit and th...

Страница 46: ...10 ML01 CB 610 ML01 3 Use the CB 610 bolts with the ML01 nuts to assemble the steel base kit as shown in diagrams and at the bottom of this page Note the CB 610 s will be on the outside and the ML01 n...

Страница 47: ...he Front and Back sections of the Flat Mount Base these sections will be required to assemble the front and back walls in Manual 2 Note The 12D and 12E pro les may be labeled incorrectly on this produ...

Страница 48: ...ase is square and level again with the base kit moved back into place and BA A1 s in their respective holes Check with your local building code for depth requirements 3 We recommend you use a concrete...

Страница 49: ...rom the Summit Greenhouse Kit and is designed to be installed directly into the Earth using the included L Bolts which must be secured into Quikrete or a similar concrete material The Flat Mount Base...

Страница 50: ...Kit will be assembled as shown in this section then secured to the surface of your choice using the proper anchoring hardware You will drill all holes into your surface for the entire base kit and tem...

Страница 51: ...the pieces are laid out exactly like the diagram note that notches will have a 23 gap between each other no notches should be right next to each other except at the corners See and to con rm you have...

Страница 52: ...AFS 68 screws see diagram Repeat connecting the 12F with the 12F 6 Assemble the base kit as shown using the ABS 610 screws with the SQ NUT 6 nuts at the 1C corners See diagrams and 12B 14 12A FRONT E...

Страница 53: ...our anchoring kit Drill the holes into your surface blow out the debris then install the screws Keep the Left side 12C 12F and 12F and the Right side 12C 12G and 12G in place with the anchors installe...

Страница 54: ...ust be secured with Quikrete or a similar concrete material NOTE concrete is not included purchase at a local hardware store The side sections of the Flat Mount Base Kit will attach on top of the Stee...

Страница 55: ...arts for your Steel Base Kit exactly as shown in the diagram below failure to assemble exactly as shown will cause problems later in assembly 2 Con rm that the small oval holes are all on the top side...

Страница 56: ...10 ML01 CB 610 ML01 3 Use the CB 610 bolts with the ML01 nuts to assemble the steel base kit as shown in diagrams and at the bottom of this page Note the CB 610 s will be on the outside and the ML01 n...

Страница 57: ...hardware using the W16 10 mm Wrench and W17 Allen Driver Set aside the Front and Back sections of the Flat Mount Base these sections will be required to assemble the front and back walls in Manual 2...

Страница 58: ...es are level then mark the ground where the BA A1 L Bolts will reside with a marking paint You will then move base aside in order to dig out the holes 2 Dig out the holes for the BA A1 anchors then co...

Страница 59: ...from the Summit Greenhouse Kit and is designed to be installed directly into the Earth using the included L Bolts which must be secured into Quikrete or a similar concrete material The Flat Mount Base...

Страница 60: ...will follow these instructions to assemble the Flat Mount section but will then attach the Flat Mount Kit onto your Steel Base Kit The Flat Mount Kit will be assembled as shown in this section then s...

Страница 61: ...e front is where you want your doors to be located Be sure the pieces are laid out exactly like the diagram note that notches will have a 23 gap between each other no notches should be right next to e...

Страница 62: ...AFS 68 screws see diagram Repeat connecting the 12F with the 12F and 12F with 12D 6 Assemble the base kit as shown using the ABS 610 screws with the SQ NUT 6 nuts at the 1C corners See diagrams and 1...

Страница 63: ...anchoring kit Drill the holes into your surface blow out the debris then install the screws Keep the Left side 12C 12F 12F and 12D and the Right side 12C 12G 12G and 12E in place with the anchors inst...

Страница 64: ...om the Summit Greenhouse Kit and is to be installed directly into the Earth using the included L Bolts which must be secured with Quikrete or a similar concrete material NOTE concrete is not included...

Страница 65: ...FT 1 Lay out all the parts for your Steel Base Kit exactly as shown in the diagram below failure to assemble exactly as shown will cause problems later in assembly 2 Con rm that the small oval holes a...

Страница 66: ...10 ML01 CB 610 ML01 3 Use the CB 610 bolts with the ML01 nuts to assemble the steel base kit as shown in diagrams and at the bottom of this page Note the CB 610 s will be on the outside and the ML01 n...

Страница 67: ...NSTALLATION 1 Attach the side Flat Mount Base pieces to the Steel Base Kit as shown below using the ABS 625 screws with the ML01 nuts See and Tighten the hardware using the W16 10 mm Wrench and W17 Al...

Страница 68: ...heck that all sides are level then mark the ground where the BA A1 L Bolts will reside with a marking paint You will then move base aside in order to dig out the holes 2 Dig out the holes for the BA A...

Страница 69: ...from the Summit Greenhouse Kit and is designed to be installed directly into the Earth using the included L Bolts which must be secured into Quikrete or a similar concrete material The Flat Mount Base...

Страница 70: ...will follow these instructions to assemble the Flat Mount section but will then attach the Flat Mount Kit onto your Steel Base Kit The Flat Mount Kit will be assembled as shown in this section then s...

Страница 71: ...parts exactly as shown in the diagram below Con rm that the front is where you want your doors to be located Be sure the pieces are laid out exactly like the diagram note that notches will have a 23...

Страница 72: ...AFS 68 screws see diagram Repeat connecting the 12F with the 12F and 12F with 12F 6 Assemble the base kit as shown using the ABS 610 screws with the SQ NUT 6 nuts at the 1C corners See diagrams and 1...

Страница 73: ...anchoring kit Drill the holes into your surface blow out the debris then install the screws Keep the Left side 12C 12F 12F and 12F and the Right side 12C 12G 12G and 12G in place with the anchors inst...

Страница 74: ...ectly into the Earth using the included L Bolts which must be secured with Quikrete or a similar concrete material NOTE concrete is not included purchase at a local hardware store The side sections of...

Страница 75: ...your Steel Base Kit exactly as shown in the diagram below failure to assemble exactly as shown will cause problems later in assembly 2 Con rm that the small oval holes are all on the top side of the...

Страница 76: ...10 ML01 CB 610 ML01 3 Use the CB 610 bolts with the ML01 nuts to assemble the steel base kit as shown in diagrams and at the bottom of this page Note the CB 610 s will be on the outside and the ML01 n...

Страница 77: ...ACHING THE FLAT MOUNT BASE TO THE STEEL BASE KIT FOR EARTH INSTALLATION 1 Attach the side Flat Mount Base pieces to the Steel Base Kit as shown below using the ABS 625 screws with the ML01 nuts See an...

Страница 78: ...will then move base aside in order to dig out the holes 2 Dig out the holes for the BA A1 anchors then con rm the base is square and level again with the base kit moved back into place and BA A1 s in...

Страница 79: ...ated expenses for removal installation or replacement of the greenhouse or its components are not covered under this warranty 4 This warranty does not cover scratching or scuf ng of the product that m...

Страница 80: ...ASE KIT SEE INSTALLATION MANUAL 2 GREENHOUSE ASSEMBLY SEE PARTS LIST MANUAL 3 PARTS LIST G R E E N H O U S E S GRANDIO Save this owner s manual for future reference and if you need our help CONTACT OU...

Отзывы: