General 

notes

1.1 Safety 

The relevant accident prevention regulations must be observed during all 
work. Particularly when walking on the tanks, a 2nd person is required to 
secure the tank. 

The relevant regulations and standards must additionally be taken into 
consideration during installation, assembly, servicing, repair, etc.  

During all work on the system or parts of the system, the entire system 
must always be rendered inoperable and secured to prevent unauthorised 
reactivation. 

Except in the event of work carried out in the tank, the cover of the tank 
must always be kept sealed, as this otherwise constitutes a maximum risk 
of accident. Only original GRAF covers or covers approved in writing by 
GRAF must be used. 

GRAF  offers  an  extensive  range  of  accessories,  all  of  which  are  designed  to  match  each  other  and 
which  can  be  extended  to  form  complete  systems.  The  use  of  other  accessories  may  lead  to 
impediments to the system's functional capability, therefore invalidating liability for resulting damage. 

info

@graf

australia.com.au

 

www.graf

australia.com.au

 

Содержание 375026

Страница 1: ...ts 1 GENERAL NOTES 2 1 1 Safety 2 3 4 7 8 8 8 9 10 2 INSTALLATION CONDITIONS 3 TECHNICAL DATA 4 TANK STRUCTURE 5 INSTALLATION AND ASSEMBLY 5 1 Baffle Assembly 5 2 Tank Assembly 5 3 Construction Site 5 4 Trench 5 5 Insertion And Filling 5 6 Routing Connections 6 ASSEMBLING THE TANK DOME AND TELESCOPIC DOME SHAFT 11 6 1 Assembling The Tank Dome 11 6 2 Assembling The Telescopic Dome Shaft 11 6 3 Tele...

Страница 2: ...erable and secured to prevent unauthorised reactivation Except in the event of work carried out in the tank the cover of the tank must always be kept sealed as this otherwise constitutes a maximum risk of accident Only original GRAF covers or covers approved in writing by GRAF must be used GRAF offers an extensive range of accessories all of which are designed to match each other and which can be ...

Страница 3: ...lass D cover and telescopic dome shaft in areas used by trucks with a max weight of 12 t Coverage heights on installation in groundwater the hatched area specifies the permissible immersion depth for the tanks The immersion depth is 350mm Note Please contact GRAF for advice if ground water is higher than specified above 800 1050 max 350 mm max 1050 Mini telescopic dome shaft Maxi telescopic dome s...

Страница 4: ...3 Technical data 2700L with Maxi dome info grafaustralia com au www grafaustralia com au 2700L with Mini dome Baffle for Carat tanks 4 16 ...

Страница 5: ...3 Technical data 3750L with Maxi dome 3750L with Mini dome 4800L with Maxi dome info grafaustralia com au www grafaustralia com au 5 16 ...

Страница 6: ...tres 4800 litres 6500 litres Art No 372028 372029 372030 372031 Weight 120 kg 150 kg 185 kg 220 kg Weight With mini tank dome 116 kg 146 kg 181 kg 220 kg L 2080 mm 2280 mm 2280 mm 2390 mm W 1565 mm 1755 mm 1985 mm 2190 mm H 1400 mm 1590 mm 1820 mm 2100 mm Htot 2010 mm 2200 mm 2430 mm 2710 mm Htot with mini tank dome 1680 mm 1870 mm 2100 mm 2380 mm Htot total height ...

Страница 7: ...ll Carat RS underground tank Centring pins Profile seal Quick connection lower half shell Carat RS underground tank 5 Installation and assembly Subsoil Telescopic dome shaft Compacted foundation Surrounding round grained gravel max grain size 12mm Covering layer Carat underground tank Concrete layer for surfaces used by passenger cars 6 7 8 9 10 7 8 9 5 2 3 4 1 ß according to DIN 4124 info grafaus...

Страница 8: ... Tank assembly First insert the circumferential profile seal into the sealing groove in the lower half shell Lightly coat the seal with the enclosed soft soap Then insert the centring pins into the intended mountings around the circumference The upper half shell is now positioned onto the lower half shell and the quick connections are installed To do this each 2nd quick connector is pre adjusted i...

Страница 9: ...e foundation 5 4 1 Slope embankment etc On installation of the tank in the immediate vicinity 5 m of a slope earthen mound or slope a statically calculated supporting wall must be erected to absorb the soil pressure The wall must exceed the dimensions of the tank by at least 500 mm in all directions and must be located at least 1000 mm away from the tank 5 4 2 Groundwater and cohesive water imperm...

Страница 10: ...f flow possible subsequent settling must be taken into consideration in this case If the tank overflow is connected to a public sewer this must be protected against reflux by means of a lifting station mixed sewer or reflux seal pure rainwater sewer All suction pressure and control lines must be routed in an empty pipe which must be routed as straight as possible without bending to the tank with a...

Страница 11: ... greased inserted and aligned with the surface of the site 6 3 Telescopic dome shaft on which persons may walk Important To prevent loads from being transferred onto the tank round grain gravel max grain size 8 16 is filled in in layers around the telescope and is evenly compacted Damage to the tank dome and telescope must be avoided during this step The cover is then positioned and is sealed to p...

Страница 12: ... BACKFILLED WITH APPROVED MATERIAL ENSURE GROUND WATER FROM SURROUNDING AREA CANNOT ENTER EXCAVATION CONTACT GRAF AUSTRALIA OFFICE FOR ANY ASSISTANCE info grafaustralia com au www grafaustralia com au 6 5 Truck telescopic dome shaft On installation under areas used by trucks with a maximum weight of 12 t the telescope is supported with concrete load class B25 250 kg m The layer of concrete to be i...

Страница 13: ...ly Baffle upper part Baffle lower part Sealing Screws nuts and grommet Tube of seal lubricant Note It is required to drill 2x 98mm holes directly below the top of the lower baffle for all Carat septic tanks info grafaustralia com au www grafaustralia com au ...

Страница 14: ...affle Connect with screws Start to tighten with the outside screws go around one by one to the middle 3 Put the sealing circumferentially in the baffle 4 Install the baffle in the lower Carat half shell Use lubricant on the lower part on the baffle sealing before installing info grafaustralia com au www grafaustralia com au 5 Lubricate the sealing with soap in the upper side of the baffle 6 Contin...

Страница 15: ...15 16 9 Installation of baffle info grafaustralia com au www grafaustralia com au 7 Put the label inside the tank dome ...

Страница 16: ...S 2700L 375080 Baffle for Carat S 3 750L 1 3 info grafaustralia com au www grafaustralia com au Otto Graf GmbH Carl Zeiss Str 2 6 DE 79331 Teningen Tel 49 7641 589 0 Fax 49 7641 589 50 GRAF Distribution S A R L 45 route d Ernolsheim FR 67120 Dachstein Gare Tél 33 388 49 7310 Fax 33 388 49 3280 GRAF Iberica Tecnología del Plástico S L Marquès Caldes de Montbui 114 ES 17003 Girona Tel 34 972 913767 ...

Отзывы: