Screed Box ThermoLazer 300TC/ProMelt (SmartDie II)
26
3A1319K
Screed Box ThermoLazer 300
TC
/ProMelt (SmartDie II)
Installation
1. Shut off screed box burners.
2. Slide screed box under screed shroud and press
down on screed box lever.
3. Engage screed box rod into screed box lever.
4. Align hole of rod clevis with connecting hole in
screed box yoke and install hairpin cotter pin.
5. Close and lock screed shroud door.
6. Re-light screed box burners as required (see
Screed Box Burner Lighting
, page 21).
Removal
1. Shut off screed box burners.
2. Remove hairpin cotter pin connecting screed box to
rod clevis.
3. Press down screed box lever.
4. Disengage screed box rod from screed box lever
and carefully remove screed box.
Use extreme caution when installing and removing
screed box. Expect all equipment components and
material to be extremely hot. See MSDS for Thermo-
plastic Traffic Marking Compound.
ti16833a
ti16846a
ti14268a
ti17300a
ti16833a
ti17300a
ti16839a
Содержание ThermoLazer
Страница 39: ...Notes 3A1319K 39 Notes ...