SmartDie
™
Screed Box
313787C
15
Replacing SmartDie
™
Screed Box Spring
1.
Position replacement spring as shown below and
slide into spring guard.
2.
Push spring up through guard and loop end around
guard pin until spring sits in groove.
3.
Set SmartDie
™
screed box on its side.
4.
Loop open end of spring and guard over first pin on
SmartDie
™
screed box. Then push spring guard up
and over second pin on SmartDie
™
screed box.
NOTE: Make sure spring end is fully engaged in groove
to prevent spring from coming loose.
Line Thickness Adjustment
To adjust the thickness of the line of material delivered
from the screed box, loosen all acorn nuts on the Smart-
Die
™
screed box gate and move the spacer until desired
line thickness is achieved.
Typical settings on pavement: 0.060 - 0.125 in.
(0.153 - 0.318 cm).
Typical settings on metal stencil: Flush - 0.0 in. (0.0 cm).
ti14551a
ti14549a
ti14553a
ti14550a
ti14552a
ti14272a
ti14273a
Содержание ThermoLazer 257500
Страница 23: ...Notes 313787C 23 Notes...