Operation
6
3A6623C
Operation
Setup
1. Install supplied ramp onto pallet.
2. Connect Hitch Receiver to line striping or line
removal equipment -
Hitch Receiver Kit 25N787
Manual 3A6720.
3. Install LineDriver coupler to striper or grinder hitch
ball.
4. Latch coupler to locked position (M).
NOTE:
If coupler is too tight to latch or is loose after
latching, coupler needs adjustment. Refer to
5. Insert safety pin in latch
6. Adjust seat forward/backward with lever below seat.
7. Adjust height of pedals to desired position by
removing/replacing bolts (Y).
8. Loosen two bolts (C) on topside of pedals. Rotate
pedal to desired position. Tighten bolts.
9. Continue onto
ti11087a
ti10936a
M
ti11086a
ti11085a
Содержание LineDriver ES 25N555
Страница 12: ...Maintenance 12 3A6623C Throttle Linkage Adjustment ...
Страница 23: ...Parts Drawing 3A6623C 23 Parts Drawing Torque cable cap screws or nuts to 7 8 ft lbs 9 11 N m 1 1 1 1 1 ...
Страница 26: ...Parts Drawing 26 3A6623C Parts Drawing Clamped parts must move freely after tightening 1 1 1 1 ...
Страница 29: ...Wiring Diagram Harness 25N661 3A6623C 29 Wiring Diagram Harness 25N661 ...
Страница 30: ...Wiring Diagram 30 3A6623C Wiring Diagram ...
Страница 31: ...Wiring Diagram Harness 25E406 3A6623C 31 Wiring Diagram Harness 25E406 ...