background image

Setup

3A5354B

17

Load Material

NOTE: 

Before loading material, ensure that there is a 

minimum overhead clearance of 20 in. (51 cm) and all 
air regulators are backed off to their full counterclock-
wise position.

1. Close all air regulators and air valves. See F

IG

. 3 on 

page 7.

2. Open the main air ball valve (BA) and set the ram 

air regulator (BB) to 40 psi (0.28 MPa, 2.8 bar). Set 
the director valve handle (BC) to the UP position 
and let the ram rise to its full height.

3. Lubricate the platen seals with grease or other lubri-

cant compatible with the fluid you will pump.

4. Remove the drum cover and smooth the surface of 

the fluid with a straightedge.

5. Put a full drum of fluid on the ram base, slide it back 

against the drum stops, and center it under the 
platen.

6. Remove the bleed stick (DE) from the platen bleed 

port. See F

IG

. 16.

7. If the drum has a plastic liner, pull it over the edge of 

the drum. Secure the liner with tape wrapped 
around the circumference of the drum.

8. Set the director valve (BC) to the DOWN position 

and lower the ram until fluid appears at the top of 
the platen bleed port. Adjust the ram air regulator 
(BB) as needed. Set the director valve (BC) to neu-
tral and close the platen bleed port (G).

NOTICE

Do not use a drum of material that has been dented or 
otherwise damaged; damage to the platen wiper can 
result.

Moving parts can pinch or amputate fingers. When 
the pump is operating and when raising or lowering 
the ram, keep fingers and hands away from the pump 
intake, platen, and lip of the drum.

F

IG

. 16: Heated Platen

G

D

DE

Содержание 25D117

Страница 1: ...dous locations or explosive atmospheres 25D117 26C258 D20 3 inch dual post 100 psi 0 7 MPa 7 bar Maximum Air Inlet Pressure for Air cylinder 60 psi 0 4 MPa 4 bar Maximum Air Inlet Pressure for Air mot...

Страница 2: ...5 Electrical Enclosure 36 Display User Interface 38 Electrical Schematics 40 Electrical Enclosure Schematic 40 Ram A Schematic 40 Typical Hose Applicator Wiring 41 Ram A Schematic 41 Incoming Power 41...

Страница 3: ...s pilot lights cigarettes portable electric lamps and plastic drop cloths potential static sparking Ground all equipment in the work area See Grounding instructions Never spray or flush solvent at hig...

Страница 4: ...onent See Technical Specifications in all equipment manuals Use fluids and solvents that are compatible with equipment wetted parts See Technical Specifica tions in all equipment manuals Read fluid an...

Страница 5: ...8 for more information regarding electrical require ments Heat Control Zone Selection Warm melt supply systems have six heat zones see FIG 1 Zones 1 and 2 are always used for the heated platen and the...

Страница 6: ...laten Bleed Port H Blow off Air Supply Line J Air Motor Bracket K Pump Bleed Valve L Wet Cup M System Air Inlet N Material Outlet P Electrical Enclosure Q ADM Display Module R Electrical Enclosure Bra...

Страница 7: ...or BE controls air pressure to the motor Air motor ball valve BF turns air on and off to the air motor When closed the valve relieves air trapped between it and the air motor Blow off button BG turns...

Страница 8: ...ble disable CC Stop all system processes CD Defined by icon next to soft key CE Abort current operation CF Accept change acknowledge error select item toggle selected item CG Toggle between run and se...

Страница 9: ...on 1 Using the holes in the ram base as a guide drill holes for 5 16 in 8 mm anchors Ensure that the ram base is level in all directions If necessary level the base using metal shims Secure the base t...

Страница 10: ...ure to a power source NOTE Required voltage and amperage is noted on the electrical enclosure label Also see Table 1 Before run ning power to the unit make sure the plant electrical service meets the...

Страница 11: ...ectrical enclosure strain relief bushing SR 4 Attach insulated ferrules to the end of each wire 5 Connect the ground wire DA to the chassis ground DB 6 Connect power wires to the main power switch MP...

Страница 12: ...trol board J4 connector 5 Turn the main power switch MP to the ON position then press the power button to turn on the ADM 6 Adjust the position bar height by threading at the desired level low or empt...

Страница 13: ...ny parts that have resistance readings that do not comply with the ranges listed in Table 2 NOTE Check the resistance at ambient room tempera ture 63 77 F 17 25 C To reduce the risk of electric shock...

Страница 14: ...he compo nents Refer to TABLE 3 3 Replace any parts whose resistance readings do not comply with the ranges listed in TABLE 3 NOTE Check the resistance at ambient room tempera ture 63 77 F 17 25 C To...

Страница 15: ...hten the 8 socket electrical connectors on the short heated hose leads into the 8 pin recep tacle located on the dispense valves or heat gun Hose Care Guidelines Refer to your Hot Melt Warm Melt Heate...

Страница 16: ...y grounded NOTE Remove any dispense valve orifices before purging Reinstall after purging has been completed 5 Purge the material through the system for approxi mately 1 to 2 minutes See the Pump Flui...

Страница 17: ...id on the ram base slide it back against the drum stops and center it under the platen 6 Remove the bleed stick DE from the platen bleed port See FIG 16 7 If the drum has a plastic liner pull it over...

Страница 18: ...zone for warm melt running The light will change from yellow to green The alarm light will also be lit as the zone is heating 5 Press the left horizontal arrow to go into the Diagnostic screen Informa...

Страница 19: ...Setup 3A5354B 19 NOTE Users can set up the language temperature unit and weight unit etc before testing...

Страница 20: ...e drainage Leave the bleed valve open until ready to dispense again If you suspect the dispense tip nozzle or hose is com pletely clogged or that pressure has not been fully relieved after following t...

Страница 21: ...rum is empty and should be replaced 1 Close the air motor ball valve BF by turning it clockwise to stop the pump See FIG 3 2 Set the ram director valve BC to UP to raise the platen and immediately pre...

Страница 22: ...he pump motor As the main ball valve is closed the motor pressure is relieved through the hole on the ball valve shown in FIG 19 However this does not depressurize the fluid pressure To help prevent s...

Страница 23: ...wer is at the bottom of the stroke 2 Follow the Pressure Relief Procedure on page 20 3 Remove Quick Coupler Remove the clip GC and slide the coupling cover GB up to remove the coupling GA 4 Lift the a...

Страница 24: ...ow off tube in the platen Clean all parts of the valve and reassemble 9 Remove the bleed stick DE from the platen Push the bleed stick through the bleed relieve port G to remove material residue See F...

Страница 25: ...e power 2 Disconnect the cable connector UB from the pump receptacle UA on the pump shroud 3 Remove the four screws ZA from the back pump shroud 4 Remove the pump heater front shroud 5 Check for damag...

Страница 26: ...ectrical control panel door to the OFF position to disconnect the power 2 Open the door of the electrical enclosure 3 Check for damaged or loose wires Check the con nections from the cable track 4 Che...

Страница 27: ...eviations are indicated by This condition indicates a parameter critical to the process has reached a level requiring attention but not significant enough to stop the system at this time Advisories ar...

Страница 28: ...t correct on the AMZ Duplicate AMZ dial positions i e 1 to 1 2 to 2 ect Check all CAN connections between the ADM and missing AMZ Check if hardware exists on the network Replace the AMZ if necessary C...

Страница 29: ...Zone Check the wiring to the device Check the heater resistance on the device V1M Low Voltage Line AMZ _ Deviation The voltage to the AWB is below threshold Verify the incoming voltage is correct V6M...

Страница 30: ...air motor B 5 Remove Quick Coupler Remove the clip GC and slide the coupling cover GB up to remove the cou pling GA 6 Disconnect air motor Remove the screws and washers securing the motor B to the mou...

Страница 31: ...splacement lower as needed See the Check Mate Displacement Pump manual for instructions Install Displacement Lower 1 Use two people to carefully insert the replaced lower into the platen then tighten...

Страница 32: ...e the ram up and separate the platen from the pump Connect Platen to Pump 1 Raise the ram up leaving enough space to put the platen onto the base plate 2 Put the platen under the lower and align it En...

Страница 33: ...withdrawal tool shown in FIG 35 6 Replace the heater PH sensor SE or over tem perature device OT 7 Install the pin onto the heater wire and sensor wire with the special crimping tool shown in FIG 36 I...

Страница 34: ...eaters and Sensor O T Device 1 Turn the main power switch MP OFF 2 Disconnect the cable connector UB from the pump receptacle UA on the pump shroud UC 3 Remove the four screws from the back pump shrou...

Страница 35: ...ort the electrical enclosure P using a loop and a hoist 4 Remove the screws from the bracket R connecting the electrical enclosure P to the ram piston rod and cable track if applicable 5 Remove the br...

Страница 36: ...tom bracket and side bracket of the enclosure See FIG 44 5 Lift the enclosure off and replace it with the new enclo sure 6 Secure the new electrical enclosure to the bottom and side brackets with scre...

Страница 37: ...en out in step 2 4 Connect the cables into the new control board Replace the Power Supply 1 Disconnect both ends of the power supply PS 2 Remove the four screws and nuts from the power supply PS 3 Rem...

Страница 38: ...en into the ADM USB slot 6 Put the ADM back into the bracket 7 Turn the main power switch MP on the electrical control panel door to the ON position The ADM software will be upgraded automatically 8 P...

Страница 39: ...ket clips to remove it 3 Disconnect the CAN cable s from the display 4 Replace with the new display Reconnect the CAN cable s 5 Load the correct display software for the system Follow the steps in the...

Страница 40: ...3 A M CH4 A M PUMP 1 MELTER 4 MELTER 3 PUMP 2 PUMP 1 MELTER 4 MELTER 3 OT PUMP 2 PE OT RTD1 RTD1 RTD2 RTD2 W1 W2 W4 W3 GND FAN FAN TEMP TEMP N 127887 L GND VCAN GND 3 129192 2 1 4 129542 3 2 1 GND H1...

Страница 41: ...l Hose Applicator Wiring Incoming Power A C D E F G B H J K L M GND HOSE HEATER APPLICATOR HEATER OVERTEMP HOSE OVERTEMP APPLICATOR RTD HOSE RTD Connects to CH1 4 on AMZ 1 4 4 GND H1 H2 H3 H4 W1 W2 W4...

Страница 42: ...Electrical Schematics 42 3A5354B Pump and Platen Schematic Cable from switch 36 included with heater 19 6 6...

Страница 43: ...d ram gi 2 6 25C547 HOSE 1 2 id x 6 ft 1 7 157416 FITTING nipple 1 8 158491 FITTING swivel union 92 deg 1 9 17T376 ENCLOSURE pump front 1 10 17T377 ENCLOSURE pump back 1 11 121980 HEATER pump 725 watt...

Страница 44: ...8 SCREW mach hex flange 6 108 25A391 BRACKET noto ram 3 0 sgal 1 109 100128 WASHER lock 2 110 100127 NUT mscr hex 2 111 17T626 NUT flange M20X2 5 2 112 17T625 BAR limit switch 1 113 120902 SCREW bhcs...

Страница 45: ...7T623 SOCKET jam nut 1 212 17U137 PLUG push in for 3 4 id panel 4 213 15W035 HANDLE bleed assy sst 1 214 104714 SCREW phms 6 32 unc 2a 2 215 103181 WASHER lock ext 2 216 15B137 SWITCH over temp 1 217...

Страница 46: ...elief bushing 1 309 127887 POWER SUPPLY 150w 1 310 25C662 KIT light tower 1 311 24A326 ADM MOUNTING BRACKET 1 312 24E451 ADM DISPLAY 1 313 17U121 CABEL grounding 1 314 121000 CAN CABLE 0 5m 1 315 1239...

Страница 47: ...Dimensions B Ram Down A Ram Up D G E F C Ram Model A in mm B in mm C in mm D in mm E in mm F in mm G in mm 25D117 73 1854 52 1320 14 356 18 457 24 610 28 711 37 940 26C258 73 1854 52 1320 14 356 18 45...

Страница 48: ...4 MPa 234 bar Noise dBa Maximum Sound Pressure See separate air motor manual Inlet Outlet Sizes Air Inlet Size 3 4 in npt f Materials of Construction 20L 5 gal Platen Electroless nickel polyurethane n...

Страница 49: ...Technical Specifications 3A5354B 49...

Страница 50: ...charge which charges may include the costs of parts labor and transportation THIS WARRANTY IS EXCLUSIVE AND IS IN LIEU OF ANY OTHER WARRANTIES EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO WARRANTY...

Отзывы: